Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19210D453 | 31 July 2019 | NUREG-1437, Supplement 10, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal for Peach Bottom, Units 2 and 3 | High winds Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Probabilistic Risk Assessment Zebra Mussel Incorporated by reference FLEX Aging Management Fukushima Dai-Ichi Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Large early release frequency MELLLA Flooding Focused Evaluation License Renewal Subsequent License Renewal Earthquake Fuel cladding Biofouling Fire Protection Program Environmental Justice Siren Power Uprate Measurement Uncertainty Recapture |
ML18282A169 | 9 October 2018 | Comment (3) of Richard Mccorkle on Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Units 2 and 3 | |
ML18201A219 | 10 July 2018 | Applicant'S Environmental Report | Safe Shutdown High winds Offsite Dose Calculation Manual Probabilistic Risk Assessment Coatings Zebra Mussel Incorporated by reference FLEX Aging Management Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Frazil ice Veliger License Renewal Subsequent License Renewal Earthquake Biofouling Environmental Justice Power Uprate Measurement Uncertainty Recapture |
ML19064B216 | 31 December 2015 | Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2015 | |
ML19064B214 | 31 December 2014 | Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2014 | |
ML19007A328 | 28 February 2014 | Final Report for the Thermal Study to Support a 316(a) Demonstration | High winds Coast down |
ML19064B220 | 28 February 2014 | Final Report for the Thermal Study to Support a 316(a) Demonstration: Peach Bottom Atomic Power Station Part 1 of 2 | High winds Coast down |
ML19064B237 | 25 February 2013 | Entrainment Characterization Study 2012 | |
ML19064B230 | 7 December 2012 | Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2012 | |
ML12286A011 | 30 September 2012 | License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-488 Through End, and Attachments 5 and 7 Through 9 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Mission time Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Coatings Aging Management Large early release frequency MELLLA License Renewal Earthquake Turbine Missile Fire Protection Program Environmental Justice Power change Flow Induced Vibration Coast down Power Uprate Stretch Power Uprate Measurement Uncertainty Recapture Affidavit |
ML19064B227 | 2 December 2011 | Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2011 | |
ML19064B225 | 1 December 2010 | Data Report on Intake Screen Sampling at Peach Bottom Atomic Power Station in 2010 | |
ML19067A109 | 10 June 2005 | Letter to PADEP (T. Barron) Regarding Peach Bottom Atomic Power Station Proposal for Information Collection for NPDES PA0009733 | High winds |
ML040690684 | 27 February 2004 | Transmittal of Annual Environmental Operating Report (Non-Radiological) for January - December 2003 | |
ML030550784 | 11 February 2003 | Annual Environmental Operating Report (Non-Radiological) January 1, 2002 Through December 31, 2002 | |
ML021330465 | 24 April 2002 | Annual Environmental Operating Report (Non-Radiological) 01/01/2001 Through 12/31/2001 | |
ML19210D689 | 31 August 1979 | Post-Operational Rept 12 on Ecology of Conowingo,Pond,Jan- June 1979, Prepared for Philadelphia Electric Co | |
ML20147J049 | 31 October 1978 | Postoperational Rept 10 on the Ecology of Conowingo Pond for Period Jan-June 1978 | |
ML19064B235 | 30 June 1977 | Section 316(b) Demonstration for PBAPS Units No. 2 & 3 on Conowingo Pond | |
ML19007A340 | 30 June 1977 | Demonstration for PBAPS, Units No. 2 & 3 on Conowingo Pond | |
ML19064B232 | 31 July 1975 | Materials Prepared for the Environmental Protection Agency, Section 316(a) Demonstration for PBAPS Units No. 2 & 3 on Conowingo Pond - Part 1 of 2 | |
ML19007A334 | 31 July 1975 | PBAPS Units No. 2 & 3 - Materials Prepared for the Environmental Protection Agency on Conowingo Pond |