Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22130A79124 May 2022Issuance of Relief Request No. S1-I4R-210 Fourth Inservice Inspection Interval Limited ExaminationsProbabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Intergranular Stress Corrosion Cracking
Large early release frequency
Pressure Boundary Leakage
Dissimilar Metal Weld
Unidentified leakage
Operational leakage
Thermal fatigue
LR-N21-0066, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations10 November 2021Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited ExaminationsVT-2
Intergranular Stress Corrosion Cracking
Large early release frequency
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Unidentified leakage
Operational leakage
Thermal fatigue
LR-N14-0183, Submittal of PWR Vessel Internals Inspection Plans for Aging Management of Reactor Internals11 August 2014Submittal of PWR Vessel Internals Inspection Plans for Aging Management of Reactor InternalsNondestructive Examination
Functionality Assessment
Aging Management
Stress corrosion cracking
Eddy Current Testing
License Renewal
Fuel cladding
EVT-1
Liquid penetrant
LR-N12-0326, Submittal of Relief Request Associated with the Third Ten-Year Inservice Inspection (Lsi) Interval1 November 2012Submittal of Relief Request Associated with the Third Ten-Year Inservice Inspection (Lsi) IntervalBoric Acid
Nondestructive Examination
Dissimilar Metal Weld
ML10049155022 February 2010Safety Evaluation of Relief Requests to Extend the Inservice Inspection Interval for Reactor Vessel Examinations for Salem Nuclear Generating Station, Unit Nos. 1 and 2Incorporated by reference
LR-N10-0020, Response to Request for Additional Information Regarding Scoping of Metal Fatigue, Dated January 5, 20101 February 2010Response to Request for Additional Information Regarding Scoping of Metal Fatigue, Dated January 5, 2010Weld Overlay
Aging Management
Stress corrosion cracking
License Renewal
Through-Wall Leakage
Power Uprate
LR-N09-0027, Reactor Vessel Outlet Nozzle Dissimilar Metal Weld Flaw Evaluation (Fall 2008 Outage)31 December 2008Reactor Vessel Outlet Nozzle Dissimilar Metal Weld Flaw Evaluation (Fall 2008 Outage)Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Stress corrosion cracking
Dissimilar Metal Weld
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on OperabilitySafe Shutdown
Unanalyzed Condition
Fitness for Duty
Probabilistic Risk Assessment
Condition Adverse to Quality
Missed surveillance
Operability Determination
Exemption Request
Pressure Boundary Leakage
Backfit
Operational leakage
ML18093B4331 February 1989Forwards Response to Request for Addl Info Re Inservice Insp Program for Second 10-yr Interval.Fourteen Welds in Containment Spray Sys Selected & Included in long-term Plan for Volumetric & Surface ExamsHydrostatic
Dissimilar Metal Weld