| | Start date | Site | Title |
|---|
| IR 05000271/2025001 | 8 May 2025 | Vermont Yankee | Northstar Vermont Yankee, Lllc, Vermont Yankee Nuclear Power Station, NRC Inspection Report No. 05000271/2025001 |
| IR 05000324/2025001 | 2 May 2025 | Brunswick | Integrated Inspection Report 05000324/2025001 and 05000325/2025001 |
| IR 05000361/2025002 | 31 March 2025 | San Onofre | NRC Inspection Report 05000361/2025002; 05000362/2025002 |
| IR 05000285/2025001 | 27 February 2025 | Fort Calhoun | NRC Inspection Report 05000285/2025001 |
| IR 05000293/2024002 | 21 August 2024 | Pilgrim | NRC Inspection Report No. 05000293/2024002 |
| ML24116A049 | 23 April 2024 | Point Beach | Periodic Update of the Updated Final Safety Analysis Report, Chapter 11, Waste Disposal Systems and Radiation Protection (Redacted) |
| IR 05000293/2022003 | 18 November 2022 | Pilgrim | NRC Inspection Report No. 05000293/2022003 |
| IR 05000317/2022003 | 7 November 2022 | Calvert Cliffs | Integrated Inspection Report 05000317/2022003 and 05000318/2022003 and Preliminary White Finding and Apparent Violation |
| ML16050A095 | 7 June 2022 | | IP 95003 Supplemental Inspection Response to Action Matrix Column 4 (Multiple/Repetitive Degraded Cornerstone) Inputs |
| ML22060A158 | 3 March 2022 | | IMC 1248 Appendix F Training Requirements and Qualification Journal for Decommissioning Inspectors |