SECY-22-0071, Weekly Information Report - Week Ending July 22, 2022

From kanterella
Jump to navigation Jump to search
SECY-22-0071: Weekly Information Report - Week Ending July 22, 2022
ML22208A273
Person / Time
Issue date: 07/28/2022
From: Marissa Bailey
NRC/EDO/AO
To: Commissioners
NRC/OCM
John R. Jolicoeur
References
SECY-22-0071
Download: ML22208A273 (8)


Text

__________________

INFORMATION REPORT JULY 28, 2022 SECY-22-0071 FOR: The Commissioners FROM: Marissa G. Bailey Assistant for Operations Office of the Executive Director for Operations

SUBJECT:

WEEKLY INFORMATION REPORT - WEEK ENDING JULY 22, 2022 CONTENTS Enclosure Office of the Chief Human Capital Officer A Office of the Chief Information Officer B Office of Nuclear Reactor Regulation C Office of Nuclear Material Safety and Safeguards D Office of the Secretary E Marissa G. Bailey Assistant for Operations, OEDO CONTACT: John R. Jolicoeur, OEDO 301-415-1642 Signed by Bailey, Marissa on 07/28/22

ML22208A273 OFFICE OEDO OEDO/AO

NAME JJolicoeur MBailey

DATE 7/28/2022 7/28/2022 Office of the Chief Human Capital Officer (OCHCO)

Items of Interest Week Ending July 22, 2022

ARRIVALS

NONE

RETIREMENTS

NONE

DEPARTURES

WATTS, GREGORY CONTRACT SPECIALIST PREM ADM

JULY 28, 2022 ENCLOSURE A Office of the Chief Information Officer (OCIO)

Items of Interest Week Ending July 22, 2022

Freedom of Information Act and Privacy Act Requests, Appeals, and Consultations Received During the Period of July 18 - July 22, as submitted by requester

Tracking Requesters Requesters Request Description Received Number Name Organization Date 2022-Samantha Envirosite I am seeking the updated 07/15/2022 000205 Sederquest Corporation electronic list and details for sites in possession/use of radioactive materials regulated by NRC.

I am seeking all statuses.

2022-Adam Reporters Request access to and copies of 07/15/2022 000206 Marshall Committee for all letters and correspondence Freedom of the sent from your agency to FOIA Press requesters in fiscal years 2017, 2018, 2019, 2020 and 2021, that contain any of the following phrases (case insensitive):

  • neither confirm nor deny
  • neither confirms nor denies
  • confirm or deny
  • existence or nonexistence
  • existence or non-existence
  • vel non Please note that the Reporters Committee is not seeking (1) names, (2) addresses, (3) or contact information of any FOIA requester(s) that may appear on these requested records; such information may be redacted.

2022-Kathleen I am requesting copies of all 07/20/2022 000207 Casey communications, including lobbying contracts, emails, phone logs, and notes, mentioning the following (listed below) between 2015-present:

Eversource Energy Named individual, EVP General Counsel of Eversource Rep. Themis Klarides of Connecticut and/or any member of her staff

JULY 28, 2022 ENCLOSURE B Tracking Requesters Requesters Request Description Received Number Name Organization Date 2022-Jerry Havens University of I am requesting the following 07/20/2022 000208 Arkansas information:

Plant: SEFOR (Southwest Experimental Fast Oxide Reactor)

Subject Area: Failure to Scram

JULY 28, 2022 ENCLOSURE B Office of Nuclear Reactor Regulation (NRR)

Items of Interest Week Ending July 22, 2022

NRC Issues Closeout Letter for Bulletin 2012-01 to Turkey Point

On July 19, 2022, the U.S. Nuclear Regulatory Commission (NRC) staff issued a closeout letter (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22187A277) for Bulletin 2012-01, Design Vulnerability in Electric Power System, (ADAMS Accession No. ML12074A115) for Turkey Point Nuclear Generating Units Nos. 3 and 4 (Turkey Point). The staff has reviewed the information submitted by Florida Power & Light Company (the licensee) and the results of NRCs Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01) inspections for Turkey Point in reaching the closeout conclusion.

NRC Issues Closeout Letter for Bulletin 2012-01 to Fermi

On July 21, 2022, the NRC staff issued a closeout letter (ADAMS Accession No. ML22188A089) for Bulletin 2012-01, Design Vulnerability in Electric Power System, (ADAMS Accession No. ML12074A115) for Fermi Power Plant, Unit 2 (Fermi). The staff has reviewed the information submitted by DTE Electric Company (the licensee) and the results of NRCs TI 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01) inspections for Fermi in reaching the closeout conclusion.

NRC Issues Closeout Letter for Bulletin 2012-01 to Davis-Besse

On July 21, 2022, the NRC staff issued a closeout letter (ADAMS Accession No. ML22195A223) for Bulletin 2012-01, Design Vulnerability in Electric Power System (ADAMS Accession No. ML12074A115) for Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse). The staff reviewed the information submitted by Energy Harbor Nuclear Corp. (the licensee) and the results of NRCs TI 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01) inspections for Davis-Besse in reaching the closeout conclusion.

JULY 28, 2022 ENCLOSURE C Office of Nuclear Material Safety and Safeguards (NMSS)

Items of Interest Week Ending July 22, 2022

Decommissioning Financial Assurance for Sealed and Unsealed Radioactive Materials:

Regulatory Basis; Reopening of Comment Period and Correction; 10 CFR Parts 30 and 70

[NRC-2017-0031; RIN 3150-AK52]

On July 19, 2022, the U.S. Nuclear Regulatory Commission (NRC) published a notice in the Federal Register (87 FR 42969) correcting a notice published in the Federal Register on April 28, 2022 (87 FR 25157), regarding a regulatory basis to support a rulemaking that would amend its regulations for decommissioning financial assurance for sealed and unsealed radioactive materials. This action is necessary to correct a publication issue with the regulatory basis. In the notification, the NRC solicited comments from the public, and the public comment period closed on June 27, 2022. The NRC has decided to reopen the public comment period to allow more time for members of the public to develop and submit their comments. The correction was effective on July 19, 2022. The comment period for the document published on April 28, 2022, has been reopened. Comments should be filed no later than August 18, 2022.

NMSS Staff Hosted a Public Meeting on the Diablo Canyon Site Decommissioning

On July 21, 2022, the staff hosted a hybrid public meeting in the vicinity of the Diablo Canyon Nuclear Power Plant in San Luis Obispo, California to discuss the proposed post-shutdown decommissioning activities report (PSDAR). Approximately 90 members of the public participated in-person or via Teams, including representatives from the local Northern Chumash Tribe. Comments focused on seismic concerns, dose limits, spent fuel storage considerations, and the impacts of decommissioning waste removal from the site via barge. However, numerous comments were also supportive of the plant continuing operation and reinstating its previous request to renew the operating licenses, which will expire in 2024 (Unit 1) and 2025 (Unit 2). The staff addressed the questions raised during the meeting and the public comments captured in the transcript will be considered as part of the ongoing Diablo Canyon PSDAR review.

JULY 28, 2022 ENCLOSURE D Office of the Secretary (SECY)

Items of Interest Week Ending July 22, 2022

Document Released to Date of Subject Public Document

Decision Documents

1. SECY-22-0062 07/01/22 Final Rule: NuScale Small Modular Reactor Design Certification (RIN 3150-AJ98; NRC-2017-0029)
2. Staff Requirements 07/21/22 Recommendations for Modifying the Reactor Memorandum Oversight Process Engineering Inspections SECY-22-0053 Periodicity
3. Commission Voting Record 07/21/22 Recommendations for Modifying the Reactor SECY-22-0053 Oversight Process Engineering Inspections Periodicity
4. SECY-22-0065 07/08/22 Evaluation of the U.S. Nuclear Regulatory Commission's General License Program for Devices Containing Radioactive Materials in Response to SRM-SECY-17-0083

Information Papers

1. SECY-22-0066 07/08/22 Calendar Year 2022 Triennial Force-on-Force Inspection
2. SECY-22-0069 07/21/22 Weekly Information Report: Week Ending July 15, 2022 Memoranda
1. Staff Requirements 07/15/22 Affirmation Session - SECY-21-0099: Entergy Memorandum Nuclear Operations, Inc., Entergy Nuclear M220715 Palisades, LLC, Holtec International, And Holtec Decommissioning International, LLC and SECY 0055: EnergySolutions, LLC Indirect License Transfer

Commission Correspondence

1. None

Federal Register Notices Issued

1. Entergy Nuclear Operations, Inc., Entergy Nuclear Palisades, LLC, Holtec International, and Holtec Decommissioning International, LLC (Palisades Nuclear Plant and Big Rock Point Site)

Docket Nos. 50-255-LT-2, 50-155-LT-2, 72-007-LT, and 72-043-LT-2 ASLBP No. 22-974-01-LT-BD01

2. Accident Source Term Methodologies and Corresponding Release Fractions (PRM-50-122; NRC-2020-0150)

JULY 28, 2022 ENCLOSURE E