SECY-22-0069, Weekly Information Report Week Ending July 15, 2022
ML22202A427 | |
Person / Time | |
---|---|
Issue date: | 07/22/2022 |
From: | Marissa Bailey NRC/EDO/AO |
To: | Commissioners NRC/OCM |
John R. Jolicoeur, 301-415-1642 | |
References | |
SECY-22-0069 | |
Download: ML22202A427 (8) | |
Text
__________________
INFORMATION REPORT JULY 21, 2022 SECY-22-0069 FOR: The Commissioners FROM: Marissa G. Bailey Assistant for Operations Office of the Executive Director for Operations
SUBJECT:
WEEKLY INFORMATION REPORT - WEEK ENDING JULY 15, 2022 CONTENTS Enclosure Office of the Chief Human Capital Officer A Office of the Chief Information Officer B Office of Nuclear Reactor Regulation C Office of Nuclear Material Safety and Safeguards D Office of Administration E Office of the Secretary F Marissa G. Bailey Assistant for Operations, OEDO CONTACT: John R. Jolicoeur, OEDO 301-415-1642 Signed by Bailey, Marissa on 07/21/22
ML22202A427 OFFICE OEDO OEDO/AO
NAME JJolicoeur MBailey
DATE 7/21/2022 7/21/2022 Office of the Chief Human Capital Officer (OCHCO)
Items of Interest Week Ending July 15, 2022
ARRIVALS
BARRETO, CRYSTAL SR PHYSICAL SECURITY SPECIALIST ADM BEAVER, TIFFANY ADMINISTRATIVE ASSISTANT RES BOLES, MATTHEW PROJECT ENGINEER (RIDP) R-II BROWDER, KENNETH STUDENT INTERN OCIO CHALLA, SWAPNA IT SPECIALIST (PROJECT MANAGER) OCIO HENCKEL, CHRISTIAN OPERATIONS ENGINEER R-I KEPLEY, JAMES OPERATIONS ENGINEER R-I NGUYEN, MAIHUONG TECHNICAL ASSISTANT OCIO SPANGLER, ERICA ADMINISTRATIVE ASSISTANT R-I THOMSON, KAREN ADMINISTRATIVE ASSISTANT NRR WANG, ANNY PROJECT ENGINEER (RIDP) R-II WUTKOWSKI, MICHAEL HEALTH PHYSICIST R-I RETIREMENTS
NONE
DEPARTURES
LUKES, ROBERT G. BRANCH CHIEF NRR MORGAN, VALANITA HUMAN RESOURCE SPECIALIST OCHCO SCHWEIBINZ, STEPHEN E. DATA ARCHITECT OCIO
JULY 21, 2022 ENCLOSURE A Office of the Chief Information Officer (OCIO)
Items of Interest Week Ending July 15, 2022
Freedom of Information Act and Privacy Act Requests, Appeals, and Consultations Received During the Period of July 11 - July 15, as submitted by requester
Tracking Requesters Requesters Request Description Received Number Name Organization Date 2022-Connie EDR I would like to obtain the most 07/14/2022 000204 Marini LightBox recent listing of companies that have been issued an NRC license and are included in the MLTS Database (active and retired licenses), for the entire United States, in Excel or other spreadsheet format.
JULY 21, 2022 ENCLOSURE B Office of Nuclear Reactor Regulation (NRR)
Items of Interest Week Ending July 15, 2022
The Nuclear Regulatory Commission Terminates Construction Permit for Northwest Medical Isotopes
On July 11, 2022, the Nuclear Regulatory Commission (NRC) terminated the Northwest Medical Isotopes, LLC (NWMI) construction permit (CPMIF-002) issued under Title 10 of the Code of Federal Regulations Part 50 to construct a medical isotope production facility in Columbia, Missouri (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22147A158). NWMI requested termination of its construction permit on March 25, 2022.
NWMI never commenced construction, has not received radioactive material, and has never owned or leased the site.
NRC Issues closeout letter for Bulletin 2012-01 to Perry Nuclear Power Plant
On July 13, 2022, the NRC staff issued closeout letter (ADAMS Accession No. ML22189A177) for Bulletin 2012-01, Design Vulnerability in Electric Power System, (ADAMS Accession No. ML12074A115), for Perry Nuclear Power Plant (Perry). The staff has reviewed the information submitted by Energy Harbor Nuclear Corp. (the licensee) and the results of NRCs Temporary Instruction (TI) 2515/194, Inspection Of The Licensees Implementation Of Industry Initiative Associated With The Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01) inspections for Perry in reaching the closeout conclusion.
NRC Issues closeout letter for Bulletin 2012-01 to Beaver Valley Power Station
On July 15, 2022, the NRC staff issued closeout letter (ADAMS Accession No. ML22189A184) for Bulletin 2012-01, Design Vulnerability in Electric Power System, (ADAMS Accession No. ML12074A115) for Beaver Valley Power Station (Beaver Valley). The staff has reviewed the information submitted by Energy Harbor Nuclear Corp. (the licensee) and the results of NRCs TI 2515/194, Inspection Of The Licensees Implementation Of Industry Initiative Associated With The Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01) inspections for Beaver Valley in reaching the closeout conclusion.
JULY 21, 2022 ENCLOSURE C Office of Nuclear Material Safety and Safeguards (NMSS)
Items of Interest Week Ending July 15, 2022
NMSS Staff Approved License Amendment for Framatome, Inc. Fuel Manufacturing Facility
On July 11, 2022, the staff approved License Amendment 18 to Materials License SNM-1227 (Docket No. 70-1257) for the Framatome, Inc., fuel manufacturing facility (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22154A437). The amendment approved the licensees requested changes in the methodology related to minimum margin of subcriticality and the calculational codes used for validation. The staff concluded that the requested changes provide reasonable assurance of subcriticality under normal and all credible abnormal conditions, provide reasonable assurance of adequate protection against the risk of criticality accidents, and otherwise satisfy the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 70.
NMSS Staff Issued the Final Environmental Impact Statement for the Holtec International Consolidated Interim Storage Facility Application
On July 13, 2022, the staff issued NUREG-2237, the Final Environmental Impact Statement (EIS) related to Holtec Internationals Consolidated Interim Storage Facility application. The U.S.
Nuclear Regulatory Commission (NRC) staff expects to notice the availability of the final EIS in the Federal Register on July 22, 2022. The proposed facility is an independent spent fuel storage installation to be sited in Lea County, New Mexico. A final licensing decision is expected in January 2023.
NRC Issued Amendment No. 8 to the HI-STORM Flood/Wind Multipurpose Canister Storage System
On July 13, 2022, the Executive Director for Operations signed a direct final rule (ADAMS Accession No. ML22128A002) and a companion proposed rule (ADAMS Accession No. ML22128A003) to amend the NRCs spent fuel storage regulations at 10 CFR 72.214 by revising the Holtec International HI-STORM Flood/Wind Multipurpose Canister Storage System listing within the List of approved spent fuel storage casks to include Certificate of Compliance No. 1032, Amendment No. 8. Amendment No. 8 revises the description in the certificate of compliance for the Holtec International HI-STORM Flood/Wind system to clearly indicate that only the portions of the components that contact the pool water need to be made of stainless steel or aluminum. Amendment No. 8 also incorporates other minor editorial corrections. The direct final rule and companion proposed rule will be forwarded to the Office of the Federal Register on July 21 for publication on or about July 26, 2022.
JULY 21, 2022 ENCLOSURE D Office of Administration (ADM)
Items of Interest Week Ending July 15, 2022
ANSYS Licenses and Related Services
On July 8, 2022, contract number NNG15SC79B/31310022F0053 was awarded to Integration Technologies Group, Inc. in Falls Church, VA. The purpose of this contract is to purchase ANSYS mechanical software including add-on modules. The period of performance is from July 1, 2022, through June 30, 2023, with no option periods. The total potential value of the contract can be up to $566,279.43.
JULY 21, 2022 ENCLOSURE E Office of the Secretary (SECY)
Items of Interest Week Ending July 15, 2022
Document Released to Public Date of Subject Document
Decision Documents
- 1. Staff Requirements Memorandum 07/13/22 Population Related Siting Considerations for SECY-20-0045 Advanced Reactors
- 2. Commission Voting Record 07/13/22 Population Related Siting Considerations for SECY-20-0045 Advanced Reactors
- 3. Staff Requirements Memorandum 07/14/22 Proposed Rule: Financial Qualifications SECY-18-0026 Requirements for Reactor Licensing (RIN 3150-AJ43)
- 4. Commission Voting Record 07/14/22 Proposed Rule: Financial Qualifications SECY-18-0026 Requirements for Reactor Licensing (RIN 3150-AJ43)
Information Papers
- 1. SECY-22-0064 07/07/22 Weekly Information Report - Week Ending July 1, 2022
- 2. SECY-22-0067 07/14/22 Weekly Information Report - Week Ending July 8, 2022
Memoranda
- 1. Staff Requirements Memorandum 07/15/22 Affirmation Session - SECY-21-0099: Entergy M220715 Nuclear Operations, Inc., Entergy Nuclear Palisades, LLC, Holtec International, And Holtec Decommissioning International, LLC and SECY-22-0055: Energy Solutions, LLC Indirect License Transfer
Commission Correspondence
- 1. Letter to the Honorable Gerald Connolly and Jody Hice, submits the NRCs Implementation of the Modernizing Government Technology Act
- 2. Letter to the Honorable Gene Dodaro, Comptroller General, GAO, submits update on Priority Open Recommendations for the NRC (GAO-22-105602)
- 3. Letter to the Honorable Mike Levin, responds to request regarding the regulatory approach needed to deploy a hot cell at independent spent fuel storage installation at sites like San Onofre Nuclear Generating Station
Federal Register Notices Issued
- 1. None
JULY 21, 2022 ENCLOSURE F