License Amendment Request 06-01, Application to Eliminate License Condition 2.G Requiring Reporting of Violations of Section 2.C of the Operating License Using the Consolidated Line Item Improvement Process.
ML060870115
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/23/2006
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LAR 06-01, SBK-L-06063
Download: ML060870115 (11)


Text

FPL Energy Seabrook Station FPL Energy P.O. Box 300 Seabrook, NH 03874 Seabrook Station (603) 773-7000 March 23, 2006 SBK-L-06063 Docket No. 50-443 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station License Amendment Request 06-01 "Application to Eliminate License Condition 2.G Requiring Reporting of Violations of Section 2.C of the Operating License Using the Consolidated Line Item Improvement Process" FPL Energy Seabrook, LLC (FPL Energy Seabrook) has enclosed herein License Amendment Request (LAR) 06-01. License Amendment Request 06-01 is submitted pursuant to the requirements of 10 CFR 50.90 and 10 CFR 50.4.

The proposed amendment would delete the license condition that requires reporting of violations of other requirements (e.g., conditions listed in Section 2.C) in the operating license.

The change is consistent with the notice published in the FederalRegister on November 4, 2005 as part of the consolidated line item improvement process (CLIIP).

The enclosure contains FPL Energy Seabrook's evaluation of the proposed change, including a description of the proposed change and confirmation of applicability. Attachment 1 provides a mark-up of the operating license and technical specification (TS) pages showing the proposed changes. The retyped operating license and TS pages will be provided at a later date upon request from the NRC.

A copy of this letter and the enclosed LAR have been forwarded to the New Hampshire State Liaison Officer pursuant to 10 CFR 50.91(b). The Station Operation Review Committee and the Company Nuclear Review Board have reviewed this LAR.

FPL Energy Seabrook requests NRC Staff review and approval of LAR 06-01 with issuance of a license amendment by September 30, 2006 and implementation of the amendment within 90 days.

AoD 1 an FPL Group company

SBK-L-06063 Should you have any questions regarding this letter, please contact Mr. James M. Peschel, Regulatory Programs Manager, at (603) 773-7194.

Very truly yours, FPL Energy Seabrook, LLC.

9g/ 422 ,

Gene F. St. Pierre Site Vice President

Enclosures:

Notarized Affidavit FPL Energy Seabrook's Evaluation of the Proposed Change Attachments:

1. Proposed Operating License and Technical Specification Changes (mark-up) cc: S. J. Collins, NRC Region I Administrator G. E. Miller, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector Mr. Bruce G. Cheney, ENP, Director, Division of Emergency Services N.H. Department of Safety Division of Emergency Services, Communications, and Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305

FPL Energy Seabrook Station The following information is enclosed in support of this License Amendment Request::

  • Enclosure FPL Energy Seabrook's Evaluation of the Proposed Change
  • Attachment I Proposed Operating License and Technical Specification Changes (mark-up)

I, (;ene F. St. Pierre, Site Vice President of FPL Energy Seabrook, LLC hereby affirm that the information and statements contained within this License Amendment Request are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

Sworn and Subscribed before me this a `4 day of me, , 2006 Gene F. St. Pierre Site Vice President

FPL ENERGY SEABROOK'S EVALUATION

Subject:

License Amendment Request 06-01, Application to Eliminate License Condition 2.G Requiring Reporting of Violations of Section 2.C of the Operating License Using the Consolidated Line Item Improvement Process

1. INTRODUCTION
2. PROPOSED CHANGE
3. BACKGROUND
4. REGULATORY REQUIREMENTS AND GUIDANCE
5. TECHNICAL ANALYSIS
6. REGULATORY ANALYSIS
7. NO SIGNIFICANT HAZARDS CONSIDERATION
8. ENVIRONMENTAL EVALUATION
9. PRECEDENT
10. REFERENCES
1. INTRODUCTION The proposed amendment would delete Section 2.G of Facility Operating License No.

NPF-86 for FPL Energy Seabrook, LLC (FPL Energy Seabrook), which requires reporting of violations of the requirements in Section 2.C of the facility operating license.

The availability of this operating license improvement was announced in the Federal Register on November 4, 2005 as part of the consolidated line item improvement process (CLIIP).

2. DESCRIPTION OF PROPOSED AMENDMENT Consistent with the CLIlP Notice of Availability (70 FR 67202), the proposed amendment consists of deleting Section 2.G of Facility Operating License NPF-86. The current requirements of the license condition are as follows:

G. Reporting to the Commission Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, FPL Energy Seabrook, LLC, shall report any violations of the requirements contained in Sections 2.C.(l) and 2.C.(2) of this license in the following manner: Initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System, with written followup within 30 days in accordance with the procedures described in 10 CFR Part 50.73(b), (c), and (e).

The existing conditions in Section 2.C that are subject to the current reporting requirement consist of the following:

(1) Maximum Power Level FPL Energy Seabrook, LLC, is authorized to operate the facility at reactor core power levels not in excess of 3587 megawatts thermal (100% of rated power).

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 106*, and the Environmental Protection Plan contained in Appendix B are incorporated into Facility License No. NPF-86. FPL Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

The reporting requirement defined in Technical Specification (TS) 6.5, Reportable Event Action, for FPL Energy Seabrook requires a report to the NRC pursuant to the requirements of 10 CFR 50.73 for a reportable event. As discussed in the Federal

Register notices associated with the use of the CLIIP to remove the reporting requirement of Section 2.G of the facility operating license, this application also includes the deletion of TS 6.5.

3. BACKGROUND The background for this application is adequately addressed by the NRC Notice of Availability published on November 4, 2005 (70 FR 67202) and the Notice of Opportunity to Comment published on August 29, 2005 (70 FR 51098).
4. REGULATORY REQUIREMENTS AND GUIDANCE The applicable regulatory requirements and guidance associated with this application are adequately addressed by the NRC Notice of Availability published on November 4, 2005 (70 FR 67202) and the Notice of Opportunity to Comment published on August 29, 2005 (70 FR 51098).
5. TECHNICAL ANALYSIS FPL Energy Seabrook has reviewed the safety evaluation (SE) published on August 29, 2005, as part of the CLIIP Notice of Opportunity to Comment. FPL Energy Seabrook has concluded that the justifications presented in the SE prepared by the NRC staff are applicable to Seabrook Station and justify this amendment of the facility operating license and TS 6.5 for Seabrook Station.
6. REGULATORY ANALYSIS A description of this proposed change and its relationship to applicable regulatory requirements and guidance was provided in the NRC Notice of Opportunity to Comment published on August 29, 2005 (70 FR 51098).
7. NO SIGNIFICANT HAZARDS CONSIDERATION FP1, Energy Seabrook has reviewed the proposed no significant hazards consideration determination published on August 29, 2005 (70 FR 51098), as part of the CLIIP Notice of Opportunity to Comment. FPL Energy Seabrook has concluded that the proposed determination presented in the notice is applicable to Seabrook Station and the determination is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.9'1 (a).
8. ENVIRONMENTAL EVALUATION FPL Energy Seabrook has reviewed the environmental evaluation included in the model SE published on August 29, 2005 (70 FR 51098), as part of the CLIIP Notice of Opportunity to Comment. FPL Energy Seabrook has concluded that the NRC staff's findings presented in that evaluation are applicable to Seabrook Station and the evaluation is hereby incorporated by reference for this application.
9. PRECEDENT This application is being made in accordance with the CLIIP. FPL Energy Seabrook is not proposing variations or deviations from the changes described in the NRC staffs model SE published on August 29, 2005 (70 FR 51098).
10. REFERENCES
1. FederalRegister Notice of Opportunity to Comment on Model Safety Evaluation on Elimination of Typical License Condition Requiring Reporting of Violations of Section 2.C of Operating License Using the Consolidated Line Item Improvement Process, August 29, 2005 (70 FR 51098).
2. FederalRegisterNotice of Availability of Model Application Concerning Elimination of Typical License Condition Requiring Reporting of Violations of Section 2.C of Operating License Using the Consolidated Line Item Improvement Process, November 4, 2005 (70 FR 67202).

Attachment 1 Proposed Operating License and Technical Specification Changes (mark-up)

Refer to the attached markup of the proposed change to the Operating License and Technical Specifications. The attached markup reflects the currently issued version of the Technical Specifications. At the time of submittal, the Technical Specifications were revised through Amendment No. 106. Pending Technical Specifications or Technical Specification changes issued subsequent to this submittal are not reflected in the enclosed markup.

Listed below are the license amendment requests that are awaiting NRC approval and may impact the currently issued version of the Technical Specifications.

LAR Title FPL Energy Seabrook Date of SBK Letter No. Submittal 05-10 Elimination of Monthly SBK-L-05225 12/19/2005 Operating Report 06-03 Application for Amendment to SBK-L-06059 the Technical Specifications for Miscellaneous Changes The following Operating License and Technical Specification pages are included in the attached markup:

Operating License Section 2.G Page 6 Technical Specification Title Page Index 6.5 Reportable Event Action xiv 6.5 Reportable Event Action 6-4

F. Fire Protection FPL Energy Seabrook, LLC, shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report, the Fire Protection Program Report, and the Fire Protection of Safe Shutdown Capability Reportifor the facility, as supplemented and amended, and as approved in the Safety Evaluation Report, dated March 1983; Supplement 4, dated May 1986; Supplement 5, dated July 1986; Supplement 6, dated October 1986; Supplement 7, dated October 1987; Zr and Supplement 8, dated May 1989 subject to the following provisions: FPL Energy Seabrook, LLC, may make changes to the approved fire protection program without prior approval of the Commission, only if those changes would 3) not adversely affect the ability to achieve and maintain shutdown in the event of a fire. __

G. R ortincr to the Commissio n .. '.-.--

pi othejisesas pro l`ed in tlelTechnical pecifications or Envrnmental I

Protcction PI n, FPL E ergy Segbrook, LLC/shall r port anyiolations of the a Iontainal intSections2C(1head

'r nner:

rfowing manner: Inial notificAtion saC nd2.

i2) of thin2icensehr 2)of rs i

n the the N Operationg Centerfia the E ergency lotificati Syste,( with written folU0-up within 30 days in accordance with the procedures described ifi 10 CF Part 50.73(b), (c), and (e).

H. Financial Protection The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

1. DELETED AMENDMENT NO.86,'

INDEX 6.0 ADMINISTRATIVE CONTROLS SECTION PAGE 6.4 (THIS SPECIFICATION NUMBER IS NOT USED) .6-4 6.5 CR" Tk/LE1EV- NTACTI l3 ....................................................... 6-4 6.6 SAFETY LIMIT VIOLATION .6-4 6.7 PROCEDURES AND PROGRAMS 6-5 6.8 REPORTING REQUIREMENTS 9) 6.8.1 ROUTINE REPORTS.6-11 Startup Report............................................................................................................. 6-111 Annual Reports.,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.6-12 Annual Radiological Environmental Operating Report,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 6-1:3 Annual Radioactive Effluent Release Report ,,,,,,,,,,,,6-1:3 Monthly Operating Reports......................... ,,,,.6-1:3............................. l CORE OPERATING LIMITS REPORT. 6-14 6.8.2 SPECIAL REPORTS 6-13 K]

SEABROOK -UNIT 1 xiv Amendment No. 34, 67, 73, 88,404j

ADMINISTRATIVE CONTROLS 6.2.3 (THIS SPECIFICATION NUMBER IS NOT USED) 6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall provide advisory technical support to the Control Room Commander in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the station.

6.3 (THIS SPECIFICATION NUMBER IS NOT USED) (1 6.4 (THIS SPECIFICATION NUMBER IS NOT USED) f /c92 6.5 e ng iions sha be taken for REPORTABL EVENTS:

The C ission shall e- otified and eport submitted Fsgato the ru rements of Stin 50.73 to CFR Part 50, an

b. Each REPQRALE EVE bdhe nall resuts at of this review shall be sutmitted to the Company Nuclear Review Board /l<

(CNRB) and the Site Vice President._{-/I 6.6 SAFETY LIMIT VIOLATION 6)

The following actions shall be taken in the event a Safety Limit is violated:

a. The NRC Operations Center shall be notified by telephone as soon as possible and in all cases within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The Site Vice President and the CNRB shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />;
b. A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the SORC. This report shall describe: (1) applicable circumstances preceding the violation, (2)effects of the violation upon facility components, systems, or structures, and (3)corrective action taken to prevent recurrence;
c. The Safety Limit Violation Report shall be submitted to the Commission, th a CNRB, and the Site Vice President within 14 days of the violation; and W
d. Operation of the station shall not be resumed until authorized by the Commission.

SEABROOK - UNIT 1 6-4 Amendment No. i5-104-