Exelon Generation Company Emergency Plan Addendum and Annex Revisions
ML18117A009
Person / Time
Site: Ginna, Quad Cities, LaSalle  Constellation icon.png
Issue date: 04/19/2018
From: David Gudger
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RS-18-050
Download: ML18117A009 (2)


Text

,,, Exelon Generation J.

) 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)

RS-18-050 April 19, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373, 50-374, and 72-70 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254, 50-265, and 72-53 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket Nos. 50-244 and 72-67

Subject:

Exelon Generation Company Emergency Plan Addendum and Annex Revisions In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (Exelon) is submitting Emergency Plan Addendum and Annex revisions for the plants listed in the table below.

Procedure No. Revision Title EP-AA-1005, Addendum 3 4 Emergency Action Levels for LaSalle Station EP-AA-1006, Addendum 3 5 Emergency Action Levels for Quad Cities Station Radiological Emergency Plan Annex for Ginna EP-AA-1012 5 Station The changes to the Emergency Plan Addendums and Annex for the plants listed were evaluated under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plans. This notification is being submitted within 30 days of implementation of the Emergency Plan Annex and Addendum changes as required by 1o CFR 50.54(q)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E. A X~ 1 1 5

JIV/ '5 s 2- /.p
JI-I- .

/UH :J 5

U.S. Nuclear Regulatory Commission Emergency Plan Addendum and Annex Revisions April 19, 2018 Page 2 In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendums and Annex in Attachment 1.

This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f), which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management.

A copy of the revised Emergency Plan Addendums and Annex are included in the attachments to this letter.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

R~spff tfully, . /

lefet- *J TA-- JV--

I David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

1. 10 CFR 50.54(q)(5) Change Summary Analysis
2. EP-AA-1005, Addendum 3, Revision 4, "Emergency Action Levels for LaSalle Station"
3. EP-AA-1006, Addendum 3, Revision 5, "Emergency Action Levels for Quad Cities Station"
4. EP-AA-1012, Revision 5, "Radiological Emergency Plan Annex for Ginna Station" cc: w/ Attachment 1 only Regional Administrator - NRC Region Ill Regional Administrator - NRC Region I Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector - LaSalle County Station NRC Senior Resident Inspector - Quad Cities Nuclear Power Station NRC Senior Resident Inspector - R.E. Ginna Nuclear Power Plant NRC Project Manager, NRR - LaSalle County Station NRC Project Manager, NRR - Quad Cities Nuclear Power Station NRC Project Manager, NRR - R.E. Ginna Nuclear Power Plant Illinois Emergency Management Agency - Division of Nuclear Safety A. L. Peterson, NYSERDA