RNP-RA/05-0108, Report of Changes Made in Revisions 3 & 4 of the Physical Security Plan and Revision 1 of the Safeguards Contingency Plan

From kanterella
Jump to navigation Jump to search
Report of Changes Made in Revisions 3 & 4 of the Physical Security Plan and Revision 1 of the Safeguards Contingency Plan
ML053110104
Person / Time
Site: Robinson, 07200003, 07200060  Duke Energy icon.png
Issue date: 11/02/2005
From: Baucom C
Progress Energy Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
RNP-RA/05-0108
Download: ML053110104 (2)


Text

SAFEGUARDS INFORMATION 10 CFR 50.54(p)(2) 10 CFR 72.44(e)

Prs E10 CFR 72.186(b)

AxProgress Energy Serial: RNP-RA/05-0108' NOV 02 2005 'V United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 United States Nuclear Regulatory Commission Attn: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 j H. B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 / LICENSE NO. SNM-2502 H. B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION .u DOCKET NO. 72-60 REPORT OF CHANGES MADE IN REVISIONS 3 AND 4 OF THE PHYSICAL SECURITY PLAN AND REVISION 1 OF THE SAFEGUARDS CONTINGENCY PLAN Ladies and Gentlemen:

Revisions 3 and 4 of the Physical Security Plan (PSP) for the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, were approved on September 9 and September 30, 2005.

Revision I of the Safeguards Contingency Plan (SCP) was approved on September 9, 2005. The PSP and SCP apply to HBRSEP, Unit No. 2, and the two associated Independent Spent Fuel Storage Installations. The changes made in Revisions 3 and 4 of the PSP and Revision 1 of the SCP were determined to not decrease the safeguards effectiveness of these plans.

Pursuant to 10 CFR 50.54(p)(2), 10 CFR 72.44(e), and 10 CFR 72.186(b), Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), submits, as Attachment I, a report containing a description of each change made in Revisions 3 and 4 of the PSP and Revision 1 of the SCP. As a convenience to the NRC, a copy of Revision 4 of the PSP and Revision I of the SCP are provided as Attachment II.

Please refer questions regarding this submittal to Mr. William Guthrie, Superintendent -

Security, at (843) 857-1241.

Progress Energy Carolinas, Inc.

Robinson Nuclear Plant SAFEGUARDS INFORMATION 3581 West Entrance Road NOTE: Attachment 11(other than the cover sheet) contains 'Safeguards Information."

Hartsville, SC29550 Upon separation from the Safeguards Information in Attachment 11,this document (including the cover sheet for Attachment 11)is 'Decontrolled."'

SAFEGUARDS INFORMATION United States Nuclear Regulatory Commission Serial: RNP-RA/05-0108 Page 2 of 2 Sincerely, C. T. Baucom Supervisor - Licensing/Regulatory Programs CTB/cac Attachments:

I. Report Containing a Description of Each Change Made in Revisions 3 and 4 of the Physical Security Plan and Revision I of the Safeguards Contingency Plan II. Revision 4 of the Physical Security Plan and Revision 1 of the Safeguards Contingency Plan (SAFEGUARDS INFORMATION) c: W. D. Travers, NRC, Region II NRC Resident Inspector, HBRSEP, Unit No. 2 (w/o Attachment II)

C. P. Patel, NRC, NRR (w/o Attachment II)

SAFEGUARDS INFORMATION NOTE: Attachment 1i(other than the cover sheet) contains "Safeguards Information."

Upon separation from the Safeguards Information In Attachment 11, this document (including the cover sheet for Attachment 11)is'Decontrolled."