RA-25-0017, Refuel 34 (R2R34) Inservice Inspection Program Owners Activity Report

From kanterella
(Redirected from RA-25-0017)
Jump to navigation Jump to search
Refuel 34 (R2R34) Inservice Inspection Program Owners Activity Report
ML25086A263
Person / Time
Site: Robinson 
Issue date: 03/27/2025
From: Ellis K
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
RA-25-0017
Download: ML25086A263 (1)


Text

£-,DUKE

~ ENERGY Serial: RA-25-0017 March 27, 2025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23 KevinM.Ellis General Manager Nuclear Regulatory Affairs, Policy &

Emergency Preparedness Duke Energy 13225 Hagers Ferry Rd., MG011E Huntersville, NC 28078 843-951-1329 Kevin.Ellis@duke-energy.com 10 CFR 50.55a

SUBJECT:

H. B. Robinson Steam Electric Plant Unit No. 2, Refuel 34 (R2R34) lnservice Inspection Program Owner's Activity Report Ladies and Gentlemen:

In accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Duke Energy Progress (Duke Energy) is providing its lnservice Inspection (ISi) Program Owner's Activity Report (OAR) for the H. B. Robinson Steam Electric Plant, Unit No. 2 (RNP) Fall 2024 refueling outage R2R34. The OAR is provided in the enclosure to this letter.

No new regulatory commitments have been made in this submittal. If you have additional questions, please contact Ryan Treadway, Director - Nuclear Fleet Licensing, at 980-373-5873.

Kevin M. Ellis General Manager - Nuclear Regulatory Affairs, Policy & Emergency Preparedness

Enclosure:

cc:

Owner's Activity Report for Refueling Outage 34 M. Miller, Regional Administrator USNRC Region II (Acting)

J. Zeiler, NRC Senior Resident Inspector N. Jordan, NRC Project Manager, NRR

Enclosure RA-25-0017 Enclosure Owners Activity Report for Refueling Outage 34

FORM OAR-1 OWNER'S ACTIVITY REPORT Page 1 of 3 Report Number RA-25-0059 Plant H.B. Robinson Steam Electric Plant, 3581 West Entrance Road Hartsville, SC 29550 Unit No.

2 Commercial service date March 7, 1971 Refueling outage no.

R2R34 (if applicable)

Applicable inspection interval Sixth Inspection Interval (ISI), Third Inspection Interval (Containment ISI)

(1st, 2nd, 3rd, 4th, other)

Applicable inspection period First Inspection Period (ISI), Second Inspection Period (CISI)

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans ASME Section XI 2013 Edition, 2017 Edition, 2019 Edition (See Attachment 1)

Date and revision of inspection plans See Attachment 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases used for inspection and evaluation:

Code Cases Available for Use:

N-432-1, N-513-5, N-597-3, N-613-2, N-639, N-641, N-643-2, N-648-2, N-651, N-660, N-696-1, N-705-1, N-716-2, N-735, N-751, N-768, N-831-1, N-858, N-864, N-885, N-722-1, N-729-6, N-770-5 (if applicable, include cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of R2R34 conform to the requirements of Section XI.

(refueling outage number)

Signed Angela Staller, ISI Program Owner Date (Owner or Owners Designee, Title)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Bureau Veritas Inspection and Insurance Company have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage, or a loss of any kind arising from or connected with this inspection.

Commission (Inspectors Signature)

(National Board, State, Province, and Endorsements Date Digitally signed by E50268 (342024)

Date: 2025.03.05 11:10:24 -05'00' Elmostafa Elkouri NB#13930,ANIC 03/05/2025

FORM OAR-1 OWNER'S ACTIVITY REPORT Page 2 of 3 H. B. Robinson Unit 2 Refueling Outage 34, Inservice Inspection Report The H. B. Robinson Steam Electric Plant, Unit 2, Sixth Ten-Year Interval Inservice Inspection (ISI) Plan and Third Ten-Year Containment Inservice Inspection (CISI) Plan complies with 10CFR50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2013 Edition for the CISI program, and the 2017 Edition for the ISI program. The 2019 Edition is applicable for IWA-6230(b) in accordance with RIS letter 2004-12, NRC Accession Number ML23033A037 and approval NRC Accession Number ML23118A076.

This summary report is submitted pursuant to the reporting requirements of ASME Section XI 2019 Edition, paragraph IWA-6000.

Refueling Outage 34 (R2R34) is the first of two outages of the first period in the sixth inspection interval for the ISI and Pressure Testing programs, and the first and only outage of the second period in the third inspection interval for the Containment ISI program. See the table below for the dates and revisions of the inservice inspection plans.

Document Title Document Number and Revision Date of Issue Sixth Interval Inservice Inspection (ISI) Plan RNP-PM6-002, Rev. 0 February 16, 2023 Sixth Interval Inservice Inspection (ISI) Schedule RNP-PM6-003, Rev. 0 February 16, 2023 Augmented Inservice Inspection (AISI) Plan and Schedule RNP-PM6-004, Rev. 0 February 16, 2023 Third Ten-Year Interval Inservice IWE/IWL Inspection Plan RNP-PM3-006, Rev. 1 July 12, 2023 Third Ten-Year Interval Inservice IWE/IWL Inspection Schedule RNP-PM3-007, Rev. 1 June 27, 2023

FORM OAR-1 OWNER'S ACTIVITY REPORT Page 3 of 3 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item and Flaw or Relevant Condition Description Evaluation Description None TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number 1

Core Barrel Core Barrel Plug Installation Indications 2 & 4 11/25/2024 20677181-03 2

V12-8 Perform weld repair on valve stop 11/25/2024 20697381-07