RA-23-0099, Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application

From kanterella
(Redirected from RA-23-0099)
Jump to navigation Jump to search
Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application
ML23115A050
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/25/2023
From: Snider S
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
RA-23-0099
Download: ML23115A050 (1)


Text

Steven M.Snider Vice President Oconee Nuclear Station

Duke Energy ON01VPl7800 Rochester Hwy Seneca, SC 29672 o:864.873.3478 f: 864.873.5791 RA-23-0099 Steve.Snider @duke-energy.com April 25, 2023

10 CFR 50.4 10 CFR Part 54 10 CFR 54.21(b)

ATTN: NRC Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, 50-287 Renewed License Numbers DPR-38, DPR-47, DPR-55 Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application

References:

1. Duke Energy Letter (RA-21-0132) dated June 7, 2021, Application for Subsequent Renewed Operating Licenses, (ADAMS Accession Number ML21158A193)
2. NRC Letter dated July 22, 2021, Oconee Nuclear Station, Units 1, 2, and 3 - Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding Duke Energy Carolinas Application for Subsequent License Renewal (ADAMS Accession Number ML21194A245)
3. Duke Energy Letter (RA-22-0157) dated June 7, 2022, First Annual Amendment to the License Renewal Application and Subsequent License Renewal Application Supplement 4 (ADAMS Accession Number ML22158A028)

Ladies and Gentlemen:

By letter dated June 7, 2021 (Reference 1), Duke Energy Carolinas, LLC (Duke Energy) submitted an application for the subsequent license renewal of Renewed Facility Operating License Numbers DPR-38, DPR-47, and DPR-55 for the Oconee Nuclear Station (ONS), Units 1, 2, and 3 to the U.S. Nuclear Regulatory Commission (NRC). On July 22, 2021 (Reference 2), the NRC determined that ONS subsequent license renewal application (SLRA) was acceptable and sufficient for docketing.

10 CFR 54.21(b) requires Duke Energy to report changes to the Current Licensing Basis (CLB) that materially affect the contents of the SLRA, including the UFSAR supplement. These changes are required to be submitted each year and at least 3 months prior to the scheduled completion of NRC review of the SLRA.

The first annual review results were provided by letter dated June 7, 2022 [ADAMS Accession Number ML22158A028] (Reference 3). The second annual review covers the period since the first annual update. Duke Energy has completed the second annual review of CLB changes to determine whether any sections of the SLRA for ONS were affected by these changes. No material changes were identified during the review that would materially affect the contents of the ONS SLRA.

U.S. Nuclear Regulatory Commission April 25, 2023 Page 2 Should you have any questions regarding this submittal, please contact Paul Guill at (704) 382-4753 or by email at paul.guill@duke-energy.com.

Sincerely,

Steven M. Snider Site Vice President Oconee Nuclear Station

CC:

L. Dudes, USNRC, Region II Regional Administrator S. Williams, USNRC NRR Project Manager for ONS J. Nadel, USNRC Senior Resident Inspector for ONS M. Yoo, USNRC SLR Project Manager for ONS L. Rakovan, USNRC SLR Environmental Project Manager

A. Wilson, Attorney General (SC)

R. S. Mack, Assistant Bureau Chief, Bureau of Environmental Health Services (SC)

L. Garner, Manager, Radioactive and Infectious Waste Management Section (SC)