Monthly Operating Rept for Dec 1987
ML20147D922
Person / Time
Site: Perry 
Issue date: 12/31/1987
From: Dunn G, Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
PY-CEI-NRR-0767, PY-CEI-NRR-767, NUDOCS 8801200369
Download: ML20147D922 (7)


Text

.

4 CLEVELAND ELELTRIC ILLUMINATING COMPANY PERRY NUCLEAR POVER PLANT December 1, 1987 - December 31, 1987 MONTilLY OPERATING REPORT TO NRC DOCKET NUMBER:

30 440 LICENS3 NUMBER: NPF-58 1

1 3

l t

[f/

r 8801200369 871231 7

/

PDR ADOCK 05000440

[

DCD t

R

Table of Contents Operations Summary.

1 Average Daily Unit Pover Level...

.2 Operating Data Report.

.3 Unit Shutdowns and Power Reductions.

.4

/

December 1987 Operations Summary The Perry Plant entered the month of December, 1987 in a shutdown condition as a result of a Main Steam Isolation Valve failure on November 29, 1987. The plant remained shutdovn until investigations were completed and corrective actions implemented. The reactor was restarted and the generator synchronized on December 9.

Prior to continued operations at high power levels, the generator was temporarily removed from service for repair of a Moisture Separator Reheater Drain Valve Controller, and was again synchronized on December 10. The plant vas operated at 95%

power until December 20, when the generator was removed from service for veld repairs to a turbine test connection.

Neither of these repair attivities required the reactor to be shutdovn.

The generator was synchronized again on December 20, and the plant remained at 95% power through the end of the month.

i I

\\

Average Daily Unit Power Level DOCKET NO.

50-440 UNIT Perry-One DATE 1/15/88 Contact G.A.Dunn Telephone (216)259-3737 MONTH December 1987 DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net)

(MVe-Net) 1 0

17 1118 2

0 18 1117

~

3 0

19 1080 4

0 20 479 5

~~~

0 21 1119 6

0 22 1121 7

0 23 1120 8

0 24 1119 9

0 25 1127 10 49 26 1129 11 666 27 1056 12 1108 28 1118 13 1078 29 1120 14 1118 30 1121 15 1116 31 11'"

16 1118 INSTRUCTIONS On this form list the average daily unit power level in MVe-Net for each day in the reporting month.

Compute to the nearest whole megavatt.

Operating Data R: port

. s DOCKET NO.

50-440 DATE 1/15/88 CONTACT G.A.Dunn TELEPHONE _j216)259 3737 OPERATING STATUS 1.

Unit Name Perry-One 2.

Reporting Period:

December 1987 3.

Licensed Thermal Power (MVt):

3579 4.

Nameplate Rating (Gross MVe):

1250 5.

Design Electrical Rating (Pet MVe): 1205 6.

Maximum Dependable capacity (Gross MVe):

1250 (Estimated) 7.

Maximum Dependable Capacity (llet MVe):

1205 (Estimated) 8.

If Changes Occur in Capacity katings (Item Numbers 3 through 7) Since Last Report, Give Reasons:

None

~

9.

Power Level To Vhich Restricted, If Any (Net MVe):

100% *

10. Reasons for Restrictions, If Any:

Technical Specification Limit This Month Yr- :o-Da t e Cumulative

11. Hours In Reporting Period 744 1,044 1,044
12. Hours Reactor Vas Critical 548.3 811.3 811.3
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 510.6 773.4 773.4
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy (MVH) 1,647,252 2,561,519 2,561,519
17. Gross Electrical Energy (MVH) 565,226 878,462 878,462
18. Net Electrical Energy (MVH) 531,078 828,484 828,484
19. Unit Service Factor 68.6 74.1 74.1
20. Unit Availability Factor 68.6 74.1 74.1
21. Unit Capacity Factor (Using MDC Net)*

59.2 65.9 65.9

22. Unit Capacity Factor (Using DER Net)*

59.2 65.9 65.9

23. Unit Forced Outage Rate 31.4 25.9 25.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Surveillance / Maintenance Outage beginning January 3, 1988, Duration 19 days Surveillance / Maintenance Outage estimated start March 11, 1988 estimated duration 10 days

25. If Shut Dovn at end of Report Period, Estimated Date of Startup N/A NOTE:

Year-To-Date and cumulative data provided in this Operating Data Report reflects the period from 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on November 18, 1987 when commercial operation began, until 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> on December 31, 1987.

This is in accordance with the standard practice of providing cumulative data based on the date of commercial operation rather than the date of first electrical generation.

Maximum Pover Operation was limited due to the unavailability of the

'B' Final Stage Feedvater Heater and the

'A' Reactor Feedvater Pump.

(NOTE:

The Final Stage Feedvater Heater was erroneously identified as

'A' in the November, 1987 Operating Data Report.)

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-440 UNIT NAME Perry-One REPGRT HONTil December 1987 DATE I/15/88 COMPLETED BY C.A. Dunn TELEPil0NE (216) 259-3737 7

U w0 c

n g,,c o Licensee

{

g Cause & Corrective o^,

No.

Date g

gg, j gy Event ge g,]

Action to a

Prevent Recurrence gj y gj g Report #

g.j gu H

o av xe cn i

12/01/87 F 214.5 A

4 Continuation of shutdown performance II/29/87; refer b

to 11/87 Monthly Operating Report.

2 12/10/87 F

11.6 A

4 Automatic turbine trip due to high MSR drain tank level (Reactor was not shutdown). Drain tank level controller was repaired.

3 I2/20/87 F

7.3 A

4 Turbine taken off-line due to a steam Icak upstream of an instrument test cap (Reactor was not shutdown).

The 1ine was cut, capped and seal welded.

'F:

Forced Reason:

Method:

Exhibit C - Instructions S: Scheduled A-Equipment Failure (Explain) 1-H.inua l for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREC D-Regulatory Restriction 4-Other (Explain) 1022)

E-Operator Training &

License Examination Exhibit I-Same Source F-Administrative C-Operational Error (Explain)

H-Other (Explain)

~

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY PO DOX 97 e

PERRY. OHIO 44c81 e

TELEPHONE (216) 259 3737 e

ADDRESS-to CENTER ROAD Semng The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan vice enesecur Janua ry 15, 1988 NUCLE AR Of40VP PY-CEI/NRR-0767 L Docement Control Desk U.S. Nuclear Regulatory Commission Washington, D.

20555 Pe rry Nuclear Power Plant Docket No. 50-440 Monthly Operating R.;;oti

Dear Sir:

At ta ched is the December 1987 Monthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

Please feel free to contact me if you have any questions.

Very truly yours, v

Al Kat.lan Vice President Nuclear Group AK: cab Attachment ec: