PNP 2015-077, Submittal of 10-Day Response to an Apparent Violation in IR 2015012; EA-15-171

From kanterella
Jump to navigation Jump to search
Submittal of 10-Day Response to an Apparent Violation in IR 2015012; EA-15-171
ML15269A009
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/26/2015
From: Gustafson O
Entergy Nuclear Operations
To: Dave Hills
Document Control Desk, NRC/RGN-III
References
EA-15-171, IR 2015012, PNP 2015-077
Download: ML15269A009 (1)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Otto W. Gustafson Director, Regulatory and Performance Improvement PNP 2015-077 EA-15-171 September 26, 2015 Mr. David Hills U.S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352

SUBJECT:

10-Day Response to an Apparent Violation in IR 2015012; EA-15-171 Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Reference:

Letter from Nuclear Regulatory Commission to Entergy Nuclear Operations, Inc. dated September 17, 2015, "Palisades Nuclear Plant NRC Inspection Report 05000255/2015012"

Dear Sir:

Entergy Nuclear Operations, Inc, (ENO) received the referenced letter dated September 17, 2015, related to an apparent violation described in inspection report 2015012. The letter provides ENO the option to attend a Pre-decisional Enforcement Conference, or submit the ENO position on the finding, in writing, within 30 days. In addition, the letter requires a 10-day response to notify the NRC of the intended choice.

As required by the referenced letter, ENO notified David Hills, NRC Region III, on September 26, 2015, that a 30-day letter will be submitted to address the apparent violation.

This letter contains no new commitments and no revisions to existing commitments.

Sincerely, OWG/bed cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspectors, Palisades, USNRC