MONTHYEARPLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage Project stage: Request PLA-6809, Proposed Amendment No. 309 to License NPF-14 & Proposed Amendment No. 280 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.8.1.19 to Increase Diesel Generator E Minimum Steady.2012-09-18018 September 2012 Proposed Amendment No. 309 to License NPF-14 & Proposed Amendment No. 280 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.8.1.19 to Increase Diesel Generator E Minimum Steady. Project stage: Request ML12291A4992012-10-19019 October 2012 Acceptance of Requested Licensing Action Change to Technical Specification Surveillance Requirement 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State. Project stage: Acceptance Review ML12291A6092012-10-19019 October 2012 Acceptance of Requested Licensing Action Change to Technical Specification Surveillance Requirement 3.8.1.19 to Increase Diesel Generator E Minimum Steady State Frequency (TAC Nos. ME9609 and ME9610 Project stage: Acceptance Review ML13035A2482013-02-0101 February 2013 ME9609 Susquehanna Steam Electric Station Proposed Amendment No. 309 to License NPF-14 and Proposed Amendment No. 280 to License Npf -22: Change to Technical Specification Surveillance Requirement 3.8.1.19 to Increase Diesel Generator E Min Project stage: Other ML13043A4062013-02-12012 February 2013 Proposed Amendment No. 309 to License NPF-14 and Proposed Amendment No. 280 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.8.1.9, 3.8.1.11,3.8.1.12, and 3.8.1.19 to Increase Diesel Project stage: Other ML13305A8912013-11-13013 November 2013 Request for Additional Information Regarding Request to Change Technical Specification 3.3.6.1 Project stage: RAI ML13298A7582014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements to Increase Diesel Generator Minimum Steady State Voltage (TAC ME9607 and ME960) Project stage: RAI ML13298A7812014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirement 3.8.1.19 to Increase Diesel Generator Minimum Steady State Frequency (TACs ME9609. Project stage: RAI PLA-7243, Withdrawal of Proposed Amendments for Diesel Generator Testing Use of Increased Minimum Steady State Voltage and New Frequency Tolerance2014-12-22022 December 2014 Withdrawal of Proposed Amendments for Diesel Generator Testing Use of Increased Minimum Steady State Voltage and New Frequency Tolerance Project stage: Withdrawal ML15027A6112015-02-0909 February 2015 Withdrawal of an Amendment Request Project stage: Withdrawal ML15027A6052015-02-0909 February 2015 Withdrawal of an Amendment Request Project stage: Withdrawal ML15027A6032015-02-0909 February 2015 PPL Susquehanna, LLC; Susquehanna Steam Electric Station, Unit Nos. 1 and 2 EDG Amd Frequency Withdraw Federal Register Notice Project stage: Request 2013-02-01
[Table View] |
|
---|
Category:Letter type:PLA
MONTHYEARPLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 2024-07-23
[Table view] |
Text
iI' Jon A. Franke PPL Susquehanna, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 jfranke@pplweb.com 1I PP TM U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 - 201 4 SUSQUEHANNA STEAM ELECTRIC STATION WITHDRAWAL OF PROPOSED AMENDMENTS FOR DIESEL GENERATOR TESTING USE OF INCREASED MINIMUM STEADY STATE VOLTAGE AND NEW FREQUENCY TOLERANCE (TAC NOS. ME9607 THRU ME9610) Docket No. 50-387 PLA-7243 and No. 50-388
References:
- 1. PPLLetter (PLA-6825), "Change to Technical Specification Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel GeneratorMinimum Steady State Voltage," dated September 18, 2012 (Accession ML12262A322).
- 2. PPL Letter (PLA-6809), "Change to Technical Specification SurveillanceRequirement (SR) 3.8.1.19 to Increase Diesel GeneratorE Minimum Steady State Frequency,"
dated September 18, 2012 (Accession ML12262A321).
- 3. NRC Letter, "Requestfor Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements to Increase Diesel Generator Minimum Steady State Voltage (TAC Nos. ME9607 and ME9608),"
dated March 7, 2014 (Accession ML13298A758).
- 4. NRC Letter, "Requestfor Additional Information Regarding Requestfor Changes to Technical Specification Surveillance Requirement 3.8.1.19 to IncreaseDiesel GeneratorE Minimum Steady State Frequency (TA C Nos. ME9609 and ME9610),"
dated March 7, 2014 (Accession ML13298A781).
- 5. PPLLetter (PLA-6997), "Response to Request for AdditionalInformation Regarding Changes to Technical Specification (TS) Surveillance Requirements (SR) to Increase Diesel GeneratorMinimum Steady State Voltage," dated May 10, 2013 (Accession ML13130A130).
- 6. PPL Letter (PLA-6998), "Response to Requestfor Additional Information Regarding Changes to Technical Specification (TS) Surveillance Requirement (SR) 3.8.1.19 to Increase Diesel GeneratorE Minimum Stead)' State Frequency, " dated May 10, 2013 (Accession ML131130A12 7). A1 oL5J 0 0,-
Document Control Desk PLA-7243 PPL Susquehanna, LLC (PPL) hereby withdraws, in their entirety, proposed amendments in References 1 and 2. The decision to withdraw is related to plans for new design analysis that will impact the original proposals. PPL submitted the proposed amendments to the Susquehanna Station Electric Station (SSES) Units 1 and 2 Technical Specification (TS) for several Surveillance Requirements (SRs) for diesel generator (DG) testing.
Reference 1 was intended to raise the DG minimum steady state voltage in TS to establish new acceptance criteria above a Degraded Voltage Relay (DVR), reset nominal
.setting. This new acceptance criteria is already in use and was previously implemented with a calculation change to show required components would load onto the ESS bus during an emergency.
Reference 2 was intended to raise the lower side of the nominal steady state frequency band for the 'E' DG. This change would simplify the analysis of a postulated transient frequency dip during operation of the 'E' DG.
In References 3 and 4, the NRC requested additional information (RAI) with responses due by December 31, 2014. Previously, PPL responded to RAI questions on both requests, in two submittals dated May 10, 2013, (References 5 and 6).
On November 6, 2014, PPL discussed with the NRC Project Manager that new design analysis currently in development expands the scope of the original licensing action requests in References 1 and 2. Implementing the new design analysis will substantially modify the original proposals, in addition to addressing the NRC's RAI. However, additional time to implement the new design analysis would be required.
Following additional discussion with the NRC Project Manager, a decision was reached to request withdrawal of the separate licensing action requests. Withdrawal of these proposals (which affect the same SRs for the DGs) at this time allows the implementation of additional scope identified during development of the new design analysis. Therefore, when the completed new design analysis includes this new scope, a single licensing action request to obtain NRC review and approval will be submitted. PPL plans to request a pre-submittal meeting with the NRC before making the new request.
The new design analysis supports the needed design controls for use of more restrictive new surveillance test acceptance criteria than in existing TS. The activities that are related to this effort remain conservatively implemented at the station, and are addressed by the Station's Corrective Action Program.
Document Control Desk PLA-7243 There are no new regulatory. commitments associated with this response.
If you have any questions or require additional information, please contact Mr. Duane L. Filchner (570) 542-6501.
Sincerely, J.ýA. anakeý opy: NRC Region I Mr. J. Greives, NRC Sr. Resident Inspector Mr. L. Winker, PA DEP/BRP