MONTHYEARLR-N13-0205, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident-Base Case Velocity...2013-09-10010 September 2013 Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident-Base Case Velocity... Project stage: Response to RAI 0CAN091301, Response to NRC Request for Information (RFI) Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi..2013-09-12012 September 2013 Response to NRC Request for Information (RFI) Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi.. Project stage: Response to RAI LR-N14-0051, PSEG Nuclear Llc'S Seismic Hazard and Screening Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.2014-03-28028 March 2014 PSEG Nuclear Llc'S Seismic Hazard and Screening Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. Project stage: Response to RAI 0CAN031404, ANO, Units 1 & 2 - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Nttf)Review of Insights from the Fukushima2014-03-28028 March 2014 ANO, Units 1 & 2 - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Nttf)Review of Insights from the Fukushima Da Project stage: Response to RAI ML14092A4172014-03-31031 March 2014 Response to March 12, 2012 Information Request Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1 Project stage: Request RS-14-065, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of The..2014-03-31031 March 2014 Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of The.. Project stage: Response to RAI LIC-14-0047, Omaha Public Power District - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushi2014-03-31031 March 2014 Omaha Public Power District - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Project stage: Request ML14204A6202014-07-21021 July 2014 Response to Request for Additional Information Regarding Seismic Hazard and Screening Report for Seismic Recommendation 2.1 Project stage: Response to RAI ML14204A6192014-07-21021 July 2014 Response to March 12, 2012 Information Related to the Seismic Hazard and Screening Report for Recommendation 2.1 Project stage: Request NL-14-099, Request for Review of Entergy Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights.2014-08-18018 August 2014 Request for Review of Entergy Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights. Project stage: Request 0CAN081401, Response to Request for Additional Information (RAI) Associated with Near-Term Task Force (NTTF) Recommendation 2.1, Seismic Hazard and Screening Report2014-08-21021 August 2014 Response to Request for Additional Information (RAI) Associated with Near-Term Task Force (NTTF) Recommendation 2.1, Seismic Hazard and Screening Report Project stage: Response to RAI RS-14-206, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other PLA-7224, Response to March 12, 2012 Information Request - Supplemental Information Related to the Seismic Hazard and Screening Report for Recommendation 2.1 - PLA-72242014-08-28028 August 2014 Response to March 12, 2012 Information Request - Supplemental Information Related to the Seismic Hazard and Screening Report for Recommendation 2.1 - PLA-7224 Project stage: Request RS-14-230, Supplemental Information Related to the Seismic Hazard and Screening Report in Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2, 1 of the Near-Term Task Force Review Of...2014-08-29029 August 2014 Supplemental Information Related to the Seismic Hazard and Screening Report in Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2, 1 of the Near-Term Task Force Review Of... Project stage: Supplement ML14224A5262014-09-22022 September 2014 Screening and Prioritization Results of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Project stage: Other LIC-14-0124, Supplemental Information Related to Seismic Hazard and Screening Report in Response to NRC Request for Information Pursuant to 10CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The...2014-10-22022 October 2014 Supplemental Information Related to Seismic Hazard and Screening Report in Response to NRC Request for Information Pursuant to 10CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The... Project stage: Supplement LR-N14-0227, Seismic Hazard and Screening Report - Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-10-30030 October 2014 Seismic Hazard and Screening Report - Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Supplement 0CAN111401, Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-11-0404 November 2014 Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Other NL-14-139, Additional Information Regarding the Request for Review of Entergy Seismic Hazard and Screening Report (CEUS Sites), Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-11-0505 November 2014 Additional Information Regarding the Request for Review of Entergy Seismic Hazard and Screening Report (CEUS Sites), Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Request ML14310A0222014-11-13013 November 2014 Report Regarding Individual Plant Examination of External Events Supporting Information for Seismic Screening Project stage: Other ML14246A4282014-11-21021 November 2014 Screening and Prioritization Results Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident Based on Individual Plant Examination of External Events Project stage: Approval ML14310A0332014-12-15015 December 2014 NRC Response to Licensees Notification of Revised Regulatory Commitments Associated with Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Revie Project stage: RAI ML15329A1812015-12-0808 December 2015 Staff Assessment of Information Provided Pursuant of Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f)Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights.. Project stage: Approval ML15328A2682015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review Project stage: Other ML15344A1092015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Project stage: Other ML17123A3782016-04-27027 April 2016 Reevaluated Seismic Hazard Mitigating Strategies Assessment Report Project stage: Other LIC-16-0039, Ft. Calhoun, Unit 1 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Accident2016-05-25025 May 2016 Ft. Calhoun, Unit 1 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Accident Project stage: Response to RAI ML16365A0322016-12-21021 December 2016 Response to March 12, 2012 Information Request, Spent Fuel Pool Seismic Evaluation for Recommendation 2.1 Project stage: Other 0CAN121602, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 32016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 3 Project stage: Other 2014-07-21
[Table View] |
|
---|
Category:Letter type:PLA
MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-8001, Radiation Exposure Information and Reporting System - PLA-80012022-04-28028 April 2022 Radiation Exposure Information and Reporting System - PLA-8001 PLA-7986, 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-79862022-04-26026 April 2022 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-7986 PLA-7987, Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987)2022-04-26026 April 2022 Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987) PLA-7985, Annual Radiological Environmental Operating Report2022-04-22022 April 2022 Annual Radiological Environmental Operating Report PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7995, Property Insurance Program (PLA-7995)2022-03-30030 March 2022 Property Insurance Program (PLA-7995) PLA-7998, Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report2022-03-29029 March 2022 Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report PLA-7991, Proof of Financial Protection and Guarantee of Payment of Deferred Premium2022-03-24024 March 2022 Proof of Financial Protection and Guarantee of Payment of Deferred Premium PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 2024-01-04
[Table view] |
Text
Timothy S. Rausch PPL Susquehanna, LLC Senior Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3345 Fax 570.542.1504 tsrausch@ pplweb.com AUG 2 8 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO MARCH 12, 2012 INFORMATION REQUEST- SUPPLEMENTAL INFORMATION RELATED TO THE SEISMIC HAZARD AND SCREENING REPORT FOR RECOMMENDATION 2.1 Docket No. 50-387 PLA-7224 and No. 50-388
References:
I. NRC Letter, "Request for Information Pursuant to Title IO of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.I, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March I2, 2012
- 2. Electric Power Research Institute (EPRI) Report I025287, Seismic Evaluation Guidance:
Screening, Prioritization, and Implementation Details (SPID) for Resolution of Fukushima Near-Term Task Force Recommendation 2.I: Seismic
- 3. EPRI Report 3002000704, Seismic Evaluation Guidance: Augmented Approach for the Resolution of Fukushima Near-Term Task Force Recommendation 2.I- Seismic
- 4. PPL Letter (PLA-7I45), titled "Susquehanna Steam Electric Station Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to IO CFR 50.54(j)
Regarding Recommendation 2.I of the Near- Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 26, 20I4
- 5. NRC Letter, 'Electric Power Research Institute Final Draft Report XXXXXX, "Seismic Evaluation Guidance: Augmented Approach for the Resolution of Near-Term Task Force Recommendation 2.I: Seismic," as an Acceptable Alternative to the March I2, 20I2, Information Request for Seismic Reevaluations,' dated May 7, 2013
- 6. NRC Letter, "Screening and Prioritization Results Regarding Information Pursuant to Title IO of the Code of Federal Regulations 50.54(j) Regarding Recommendations 2.I, 2.3, and 9.3, of the Near- Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,"
dated July 2I, 2014 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred
Document Control Desk PLA-7224 status. Enclosure 1 of Reference 1 requested each addressee in the Central and Eastern United States (CEUS) to submit a Seismic Hazard and Screening Report.
PPL Susquehanna, LLC (PPL) submitted the Seismic Hazard and Screening Report for Susquehanna Steam Electric Station (SSES) Units 1 and 2 to NRC in Reference 4. The report provided the basis for both units to screen out of performing seismic risk evaluations in accordance with the guidance in the Seismic Evaluation Guidance:
Screening, Prioritization, and Implementation Details (SPID) (Reference 2). This screening was based on demonstrating that the plant capacity spectra for SSES Units 1 and 2 from the Individual Plant Examination for External Events (IPEEE) exceed the new ground motion response spectrum (GMRS) in the 1 to 10Hz range.
PPL demonstrated the adequacy of the IPEEE Programs, in accordance with the criteria in the SPID, for SSES Units 1 and 2 in Reference 4. In Reference 6, the NRC stated that for SSES Units 1 and 2, " ... the Licensee has demonstrated IPEEE plant capacity, consistent with endorsed guidance, bounds the re-evaluated hazard."
In Reference 1, the NRC requested interim evaluations and actions " ... to address higher seismic hazard .... prior to completion of risk evaluation." Section 1 of the Augmented Approach guidance (Reference 3) states that " ... this report addresses interim evaluations ... to be implemented prior to performing complete plant seismic risk evaluations." The NRC endorsement of the Augmented Approach guidance (Reference 5), states that the Expedited Seismic Evaluation Process (ESEP) can provide seismic margin " ... while more detailed and comprehensive plant seismic risk evaluations are being performed."
Consistent with the guidance contained in Reference 3, the Seismic Hazard and Screening Report (Reference 4) indicated that SSES Units 1 and 2 should screen-in for performance of the ESEP. However, the spectral amplitudes of the new GMRS for SSES Units 1 and 2 are sufficiently low that interim seismic risk evaluations for ESEP do not provide commensurate safety benefit. PPL considers that the resource-intensive interim evaluations per the Augmented Approach guidance for ESEP, which were intended to address high seismic hazards prior to completion of a seismic risk evaluation, are not warranted for SSES Units 1 and 2.
From a seismic safety perspective, the SSES Units 1 and 2 IPEEE, which used the EPRI seismic margin assessment (SMA) approach, has already demonstrated that the plant can safely shut down with redundant success paths with plant seismic capacity above the GMRS. Further, the new GMRS is only marginally greater than the safe-shutdown earthquake (SSE) spectra for SSES Units 1 and 2. Thus, an ESEP review per the Reference 3 guidance would only consider a minimal increase above SSE in seismic demand, and in fact would be bounded by the IPEEE evaluations and modifications already conducted. The review of a limited set of components to these demand levels, in
Document Control Desk PLA-7224 accordance with the ESEP guidance, would not provide a significant increase in safety insight or indication of seismic margin for the units beyond what was already provided by the IPEEE program.
Since SSES Units 1 and 2 have demonstrated seismic capacities above the GMRS, PPL concludes the benefit from the performance of an ESEP is not commensurate with resource expenditure and is furthermore bounded by the already conducted IPEEE evaluations and modifications.
Therefore, PPL does not intend to perform the ESEP for SSES Units 1 and 2. The commitment to perform a high frequency and Spent Fuel Pool evaluation, per the guidance in References 1 and 3, as indicated in the Seismic Hazard and Screening Report, remains unchanged.
This letter contains no new regulatory commitments.
If you have any questions regarding this information, please contact Mr. John L. Tripoli, Manager- Nuclear Regulatory Affairs, at (570) 542-3100.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: '-\uc.vs 1 28, 2-0 r '-(
.h-J A . f'Pv.~c IV 1<-E, ~
T.S. Rausch Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Mr. J. A. Whited, NRC Project Manager Mr. L. J. Winker, PA DEP/BRP