NRC Generic Letter 1989-02

From kanterella
Jump to navigation Jump to search
NRC Generic Letter 1989-002: Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products
ML031140060
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River
Issue date: 03/21/1989
From: Varga S
Office of Nuclear Reactor Regulation
To:
References
GL-89-002, NUDOCS 8903160296
Download: ML031140060 (11)


FP UNITED STATES

NUCLEAR REGULATORY COMMISSION

  • WASHINGTON, D.C.20555 March 21, 1989 TO: ALL HOLDERS OF OPERATING LICENSES AND CONSTRUCTION PERMITS FOR

NUCLEAR POWER REACTORS

SUBJECT: ACTIONS TO IMPROVE THE DETECTION OF COUNTERFEIT AND FRAUDULENTLY

MARKETED PRODUCTS (GENERIC LETTER 89-02)

Recent instances of counterfeit and fraudulently marketed vendor products have heightened the NRC's concerns for licensees' capability to assure the quality of procured products and to reduce the likelihood of the use of counterfeit or fraudulent products in nuclear power plants. During recent NRC inspections of licensees and vendors, the NRC has observed a wide variety of practices and programs.for procurement, receipt inspection, testing and dedication of equip- ment and material for safety-related applications. The purpose of this generic letter is to share with all licensees some of the elements of programs that appear to be effective in providing the capability to detect counterfeit or.

fraudulently marketed products and in assuring the quality of vendor products.

The staff is aware of and encourages the industry working group efforts to develop guidance in these areas.

Three characteristics of effective procurement and dedication programs have been identified during these NRC inspections. These characteristics are (1) the involvement of engineering staff in the procurement and product acceptance pro- cess (2) effective source inspection, receipt inspection, and testing programs, and {3) thorough, engineering based, programs for review, testing, and dedica- tion of commercial-grade products for suitability for-use in safety-related applications. NRC has found that programs that embodied the above three ele- ments were generally effective in providing enhanced capability to detect counterfeit or fraudulently marketed products and in assuring the quality of procured products, both in safety-related and other plant systems.

Licensees may want to consider the applicability of these characteristics to their programs to reduce the likelihood of the introduction of counterfeit or fraudulent products into, their plants and to assure the quality of procured vendor products.

It should be noted that the NRC staff conditionally endorses the guidelines contained in EPRI NP-5652, "Guideline for the Utilization of Commercial-Grade Items in Nuclear Safety-Related Applications (NCIG-07)," that was issued by EPRI in June 1988 for evaluating commercial-grade products for suitability for use in safety-related applications.

Background:

Numerous instances have been identified by the NRC during the past 2 years in which the nuclear industry received, accepted, and installed items of hardware t  ;'89031

Multiple

Addressees

- 2 - '.4 that were not of the quality purported by the manufacturer or supplier apparent misrepresentation. Significant deficiencies have also been due to in the programs for dedicating commercial-grade products for use in identified safety- related applications.

The use in nuclear facilities of products which are counterfeit or fraudulently marketed increases the likelihood that some plant equipment may not perform as expected. (See the enclosed list of NRC Information Notices and Bulletins regarding this matter.)

Discussion:

Procurement quality assurance (QA) controls for products to be used in safety- related applications are established in Appendix B to 10 CFR Part 50, and Regulatory Guides 1.28, 1.33, and 1.123. It is recognized that Appendix in B

vides criteria for QA programs and does not specifically address fraudulent pro- activities; however, an effectively implemented licensee QA program would increase the likelihood of detecting fraudulently marketed vendor products.

Although a properly implemented QA program may more readily detect substandard products than will the commercial-grade component upgrade process, a licensee's commercial-grade dedication process, as described in paragraph C., will greatly enhance the effectiveness of current upgrade practices. The actions described in paragraphs A. and B. have also proved useful in detecting substandard, counterfeit or fraudulently marketed products intended for use in systems needed for the safe operation of the facility.

A. Engineering Involvement in the Procurement Process Appropriate engineering involvement is warranted during the procurement and product acceptance processes, including testing, for products used in nuclear power plants. Inadequate engineering involvement has been a common weakness in licensees' procurement programs, particularly when com- mercial-grade procurements were involved. Involvement of a licensee's engineering staff in an effective procurement process would normally include (1) development of specifications to be used for the procurement of products to be used in the plant, (2) determination of the critical characteristics of the selected products that are to be verified during product acceptance, (3) determination of specific testing requirements applicable to the selected products, and (4) evaluation of test results.

The extent of necessary engineering involvement is dependent on the nature and use of the products involved.

B. Product Acceptance Programs Experience indicates that reliance on part number verification and certi- fication documentation is insufficient to ensure the quality of procured products. Licensees with effective product acceptance programs have included receipt/source inspection and appropriate testing criteria, effective vendor audits, special tests and inspections and post-installa- tion tests in their programs. These licensees have applied the inspection

MAR 2 1 1989 MEMORANDUM FOR: All Project Managers FROM: Steven A. Varga Acting Associate Director for Projects Office of Nuclear Reactor Regulation SUBJECT: GENERIC LETTER 89-02 Enclosed in Generic Letter 89-02 which describes actions licensees may consider to improve their capability of detecting counterfeit and fraudulently marketed vendor products. The Generic Letter also includes NRC conditional endorsement of EPRI NP-5652, "Guidelines for the Utilization of Commercial-Grade Items in Nuclear Safety-Related Applications (NCIG-07)."

Licensees are not requested to respond to the Generic Letter and no specific actions are requested.

Original Signed by Steven A. Varga Acting Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure:

Generic Letter 89-02 Contact: E. William Brach, VIB:DRIS

492-0961 Distribution:

Central Files DRIS R/F

VIB R/F

SVarga BGrimes BBrach MClausen

7-0 9

° 3-7<tsO~i~- Mr\^

OFC :C:V 15RI:NRR _,D iIhRR -.A/ADPS S

o------------ -- --- -- --

NAME :EW h:mgc  : is a DATE_____-------

03/89-:0-- 3-89  :------ /89--- -- __ -- ___________

DATE :034g /89 :0//9 t3/8  :::

Document Name:

MEMO FOR PROJECT MANAGERS

Requestor's ID:

CRUTCHLE

Author's Name:

Bill Brach Document Comments:

Typed 3/13/89:mgc (GENERIC LETTER 88-xx)

Document Name:

NONCONFORMING MATERIALS/EQUIP

Requestor's ID:

MCALLIST

Author's Name:

Max Clausen Document Comments:

GENERIC LETTER FOR ANPR

.r .

Enclosure 2 LIST OF RECENTLY ISSUED GENERIC LETTERS

Generic Date of Letter No. Subect _Issuance Issued To

89-01 IMPLEMENTATION OF 1/31/89 ALL LICENSEES HOLDING

PROGRAMMATIC CONTROLS OPERATING LICENSES

FOR RADIOLOGICAL EFFLUENT AND CONSTRUCTION

TECHNICAL SPECIFICATIONS PERMITS FOR NUCLEAR

IN THE ADMINISTRATIVE POWER REACTOR FACILITIES.

CONTROLS SECTION OF THE

TECHNICAL SPECIFICATIONS

AND THE RELOCATION OF

PROCEDURAL DETAILS OF

RETS TO THE OFFSITE DOSE

CALCULATION MANUAL OR TO

THE PROCESS CONTROL PROGRAM.

88-20 INDIVIDUAL PLANT 11/23/88 ALL LICENSEES HOLDING

EXAMINATION FOR SEVERE OPERATING LICENSES

ACCIDENT VULNERABILITIES - AND CONSTRUCTION

10 CFR 50.54(f) PERMITS FOR NUCLEAR

POWER REACTOR FACILITIES

88-19 USE OF DEADLY FORCE BY 10/28/88 ALL FUEL CYCLE FACILITY

LICENSEE GUARDS TO PREVENT LICENSEES WHO POSSESS,

THEFT OF SPECIAL NUCLEAR USE, IMPORT, EXPORT,

MATERIAL OR TRANSPORT FORMULA

QUANTITIES OF STRATEGIC

SPECIAL NUCLEAR MATERIAL

88-18 PLANT RECORD STORAGE ON 10/20/88 ALL LICENSEES OF

OPTICAL DISKS OPERATING REACTORS

AND HOLDERS OF

CONSTRUCTION PERMITS

88-17 LOSS OF DECAY HEAT REMOVAL 10/17/88 ALL HOLDERS OF

10 CFR 50.54(f) OPERATING LICENSES

OR CONSTRUCTION

PERMITS FOR

PRESSURIZED WATER

REACTORS

88-16 REMOVAL OF CYCLE-SPECIFIC 10/04/88 ALL POWER REACTOR

PARAMETER LIMITS FROM LICENSEES AND

TECHNICAL SPECIFICATIONS APPLICANTS

88-15 ELECTRIC POWER SYSTEMS - 09/12/88 ALL POWER REACTOR

INADEQUATE CONTROL OVER LICENSEES AND

DESIGN PROCESSES APPLICANTS

Enclosure 1 BULLETINS AND INFORMATION NOTICES CONCERNING NONCONFORMING

MATERIALS AND EQUIPMENT AND INSTANCES OF INADEQUATE

DEDICATION OF EQUIPMENT FOR SAFETY-RELATED APPLICATIONS

Bulletin No. Title Date

87-02* Fastener Testing to Determine Conformance 11/06/87 with Applicable Material Specifications

87-02, Supplement 1* 04/22/88

87-02, Supplement 2* 06/10/88

88-05* Nonconforming Materials Supplied by Piping 05/06/88 Supplies, Inc., at Folsum, New Jersey, and West Jersey Manufacturing Company at Williamstown, New Jersey

88-05, Supplement 1* 06/15/88

88-05, Supplement 2* 08/03/88

88-10* Nonconforming Molded-Case Circuit Breakers 11/22/88 Information Notice No.

87-66 Inappropriate Application of Commercial-Grade 12/31/87 Components

88-19* Questionable Certification of Class lE 04/26/88 Components

88-35 Inadequate Licensee Performed Vendor Audits 06/03/88

88-46* Licensee Report of Defective Refurbished 07/08/88 Circuit Breakers

88-46, Supplement 1* 07/21/88

88-46, Supplement 2* 12/30/88

88-48* Licensee Report of Defective Refurbished Valves 07/12/88

88-48, Supplement 1* 08/24/88

88-97 Potentially Substandard Valve Replacement Parts 12/16/88

  • These items reflect instances in which suppliers and manufacturers of safety- related material may have intentionally eluded QA requirements to misrepresent the quality of their products. In the instances marked by an asterisk, the pro- blem was brought to NRC's attention by either a licensee or a nuclear supplier.

,7.

Multiple

Addressees

- 3 -

and testing criteria to products procured for use in safety-related systems and for all commercial-grade products being evaluated for suitability for Use in safety-related systems. The inspection and testing criteria also have required identification and verification of the products' critical characteristics. In selecting the critical characteristics to be verified, consideration may be given to the safety significance, complexity, and application of the various products. For suppliers with acceptable QA pro- grams, as confirmed by licensee audits, sampling plans are often utilized to perform the required inspections and tests. In addition to these receipt/source inspections and tests, effective licensee programs normally verify the traceability to the original manufacturers of procured materials, equipment, and components in those cases where original manufacturer's certifications are elements of the safety-related pro- curement or commercial-grade dedication program. Effective audits have included consideration of audit approach, depth of audit, and audit team composition and have included appropriate engineering/technical represen- tatives. Comprehensive multi-licensee audit teams have also been found to be effective.

C. Dedication Programs It is each licensee's responsibility to provide reasonable assurance that nonconforming products are not introduced into their plants. Dedication programs that ensure the adequacy of critical parameters of products used in safety-related applications can also contribute to the identification of counterfeit or fraudulently marketed vendor products.

The NRC staff believes that licensees who use methods similar to those described in EPRI HP-5652 "Guideline for the Utilization of Commercial- Grade Items in Nuclear Safety-Related Applications (NCIG-07)," to verify the critical characteristics of commercial-grade items intended for safety- related applications have the basis for effective dedication programs.

Properly implemented, the EPRI guidelines, as modified below, establish methods which satisfy existing requirements of Appendix B to 10 CFR Part

50 as they apply to the dedication process of commercial-grade items.

1. Acceptance Method 2, "Commercial-Grade Survey of Supplier,"

should not be employed as the basis for accepting items from suppliers with undocumented commercial quality control pro- grams or with programs that do not effectively implement their own necessary controls. Likewise, Method 2 should not be employed as the basis for accepting items from distributors unless the survey includes the part manufacturer(s) and the survey confirms adequate controls by both the distributor and the part manufacturer(s).

2. Acceptance Method 4, "Acceptable Supplier/Item Performance Record," should not be employed alone unless:

Multiple

Addressees

- 4 -

a. The established historical record is based on industry- wide performance data that is directly applicable to the item's critical characteristics and the intended safety- related application; and b. The manufacturer's measures for the control of design, process, and material changes have been adequately imple- mented as verified by audit (multi-licensee team audits are acceptable).

The NRC staff believes that if licensees' procurement programs effectively implement the elements discussed in paragraphs, A., B., and C., they will reduce the likelihood of the introduction of counterfeit or fraudulent pro- ducts into their plants.

Although no response tG this letter is required, if you have any questions regdrdirig this matter, please contact the technical contact listed below.

Sincerely, Acting Associate rector for Projects Office of Nuclear Reactor Regulation Enclosures:

1. List of Bulletins and Information Notices

2. List of Recently Issued Generic Letters

CONTACT

E. William Brach, NRR

(301) 492-0961

Multiple

Addressees

- 7 -

Distribution:

DCS

VIB R/F

DCrutchfield FMiraglia CBerlinger JRoe BGrimes AGody MClausen BBrach EBaker DBrinkman JGoldberg SVarga OFC :VIB:DRIS:NRR :TECH ED IB:DRIS:NRR :C:VIJtD :NRR:TA:DRIS:NRR :C EBDLP

NAME :DSBrirbt nl mgc  :  :. ETBaker :EWkra :MJClause :AT RJoe DATE :O1/g /89 :01/' /89 01///89 01/16/$ :01/11 /89 :01/t /89 OFC :DRP:NRR :CjOB:pOEA :OGC D: R :ADT:N, R, :ADP:NRR


---------

NAME :SAVarga :CBerlinger :4JGeodberg :Brg :FJMi ilia :DMCrutchfield DATE :01/ /89 :01/13/89 :O1/jf/89 :01/ K/89 :01//1'89 :01/ /89 JV

4A z4S

  • 182

MAR 2 1 1989 Multiple

Addressees

- 5 -

Distribution:

NCS

VIB R/F

DCrutchfield FMiraglia CBerlinger JRoe BGrimes AGody MClausen BBrach EBaker DBrinkman JGoldberg SVarga A' Op R-

  • SEE PREVIOUS CONCURRENCES

OFC :VIB:DRIS:NRR :TECH ED :VIB:DRIS:NRR :C:VIB:DRIS:NRR:TA:DRIS:NRR :C:PQEB:DLPQ

NAME :DSBrinkman:mgc* :BCalure* .ETBaker* :EWBrach* :MJClausen* :ATGody/JRoe*

DATE :01/9/89 :01/9/89 :01/10/89 :01/10/89 :01/11/89 :01/13/89 OFC jW :NRR l :C:OGCB:DOEA :OGC :D:DRIS:NRR :ADT:NRR :AD RR

NAME  : :CBerlinger* :SHLewis* :BKGrimes* :FJMiraglia* :DM rtchfield

1DATE 01/13/89

.09 :01/18/89 :01/11/89 :01/19/89 :41/§/89

4 0 / /¢z^l'a

Template:GL-Nav