|
---|
Category:Letter type:NOC
MONTHYEARNOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230040, Update Foreign Ownership, Control, or Influence (FOCI)2023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic 2024-10-16
[Table view] Category:Quality Assurance Program
MONTHYEARML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 ML21231A1472021-08-19019 August 2021 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages NOC-AE-20003699, Submittal of Operations Quality Assurance Plan Change QA-088 and Revision 242020-01-0808 January 2020 Submittal of Operations Quality Assurance Plan Change QA-088 and Revision 24 NOC-AE-18003599, Submittal of Operations Quality Assurance Plan Change QA-0872018-09-24024 September 2018 Submittal of Operations Quality Assurance Plan Change QA-087 NOC-AE-18003588, Submittal of Operations Quality Assurance Plan Change QA-0862018-08-0606 August 2018 Submittal of Operations Quality Assurance Plan Change QA-086 NOC-AE-18003540, Submittal of Revised Operations Quality Assurance Plan2018-01-10010 January 2018 Submittal of Revised Operations Quality Assurance Plan NOC-AE-17003489, Submittal of Operations Quality Assurance Plan Change QA-0852017-06-20020 June 2017 Submittal of Operations Quality Assurance Plan Change QA-085 NOC-AE-16003409, Submittal of Operations Quality Assurance Plan Change QA-0842016-09-0707 September 2016 Submittal of Operations Quality Assurance Plan Change QA-084 NOC-AE-16003342, Submittal of Operations Quality Assurance Plan Change QA-0832016-02-29029 February 2016 Submittal of Operations Quality Assurance Plan Change QA-083 NOC-AE-16003326, Submittal of Revised Operations Quality Assurance Plan, Revision 222016-01-14014 January 2016 Submittal of Revised Operations Quality Assurance Plan, Revision 22 NOC-AE-15003269, Submittal of Operations Quality Assurance Plan Change QA-0822015-06-25025 June 2015 Submittal of Operations Quality Assurance Plan Change QA-082 NOC-AE-14003071, Submittal of Revised Operations Quality Assurance Plan2014-01-20020 January 2014 Submittal of Revised Operations Quality Assurance Plan NOC-AE-13003050, Submittal of Operations Quality Assurance Plan Change QA-0802013-11-11011 November 2013 Submittal of Operations Quality Assurance Plan Change QA-080 NOC-AE-13003012, Submittal of Operations Quality Assurance Plan Change QA-0792013-06-18018 June 2013 Submittal of Operations Quality Assurance Plan Change QA-079 NOC-AE-13002955, Submittal of Operations Quality Assurance Plan Change QA-0782013-01-24024 January 2013 Submittal of Operations Quality Assurance Plan Change QA-078 NOC-AE-12002919, Submittal of Operations Quality Assurance Plan Change QA-0772012-11-0101 November 2012 Submittal of Operations Quality Assurance Plan Change QA-077 NOC-AE-12002887, Submittal of Operations Quality Assurance Plan Change QA-0752012-08-0101 August 2012 Submittal of Operations Quality Assurance Plan Change QA-075 NOC-AE-12002863, Submittal of Operations Quality Assurance Plan Change QA-0742012-06-0404 June 2012 Submittal of Operations Quality Assurance Plan Change QA-074 NOC-AE-12002781, Submittal of Revised Operations Quality Assurance Plan2012-01-18018 January 2012 Submittal of Revised Operations Quality Assurance Plan NOC-AE-11002768, Submittal of Operations Quality Assurance Plan Change QA-0732011-12-0707 December 2011 Submittal of Operations Quality Assurance Plan Change QA-073 NOC-AE-11002637, Submittal of Operations Quality Assurance Plan Change QA-0722011-02-10010 February 2011 Submittal of Operations Quality Assurance Plan Change QA-072 NOC-AE-10002614, Submittal of Operations Quality Assurance Plan Change QA-0712010-10-28028 October 2010 Submittal of Operations Quality Assurance Plan Change QA-071 NOC-AE-09002460, Submittal of Operations Quality Assurance Plan Change QA-0692009-09-24024 September 2009 Submittal of Operations Quality Assurance Plan Change QA-069 NOC-AE-09002418, Submittal of Operations Quality Assurance Plan Change QA-0682009-04-22022 April 2009 Submittal of Operations Quality Assurance Plan Change QA-068 NOC-AE-08002314, Submittal of Operations Quality Assurance Plan Change QA-0672008-06-0505 June 2008 Submittal of Operations Quality Assurance Plan Change QA-067 NOC-AE-08002256, Submittal of Revised Operations Quality Assurance Plan2008-01-15015 January 2008 Submittal of Revised Operations Quality Assurance Plan NOC-AE-07002171, Submittal of Operations Quality Assurance Plan Change QA-0662007-06-12012 June 2007 Submittal of Operations Quality Assurance Plan Change QA-066 NOC-AE-07002157, Submittal of Operations Quality Assurance Plan Change QA-0652007-04-30030 April 2007 Submittal of Operations Quality Assurance Plan Change QA-065 ML0709406882007-03-26026 March 2007 Submittal of Quality Assurance Program Description NOC-AE-07002138, Submittal of Rev. 17 to Operations Quality Assurance Plan Change QA-0642007-03-26026 March 2007 Submittal of Rev. 17 to Operations Quality Assurance Plan Change QA-064 ML0708903192007-03-26026 March 2007 South Texas Project, Units 1 and 2 - Submittal of Operations Quality Assurance Plan Change QA-064 NOC-AE-07002110, Submittal of Operations Quality Assurance Plan Change QA-0632007-01-31031 January 2007 Submittal of Operations Quality Assurance Plan Change QA-063 NOC-AE-07002108, Submittal of Operations Quality Assurance Plan Change QA-0622007-01-18018 January 2007 Submittal of Operations Quality Assurance Plan Change QA-062 NOC-AE-06002050, Submittal of Operations Quality Assurance Plan Change QA-0612006-08-0808 August 2006 Submittal of Operations Quality Assurance Plan Change QA-061 NOC-AE-06002030, Submittal of Operation Quality Assurance Plan Change QA-0602006-06-14014 June 2006 Submittal of Operation Quality Assurance Plan Change QA-060 NOC-AE-06001995, Organization Changes as Described in the Operation Quality Assurance Plan2006-03-21021 March 2006 Organization Changes as Described in the Operation Quality Assurance Plan NOC-AE-06001961, Submittal of Revised Operations Quality Assurance Plan2006-01-10010 January 2006 Submittal of Revised Operations Quality Assurance Plan NOC-AE-05001944, Submittal of Operations Quality Assurance Plan Change QA-0592005-10-26026 October 2005 Submittal of Operations Quality Assurance Plan Change QA-059 NOC-AE-05001908, Submittal of Operations Quality Assurance Plan Change OA-0582005-07-18018 July 2005 Submittal of Operations Quality Assurance Plan Change OA-058 ML0506603792005-02-28028 February 2005 Submittal of Operations Quality Assurance Plan Change QA-057 NOC-AE-04001686, Submittal of Operations Quality Assurance Plan Change QA-0562004-02-17017 February 2004 Submittal of Operations Quality Assurance Plan Change QA-056 NOC-AE-03001553, Submittal of Operations Quality Assurance Plan Change QA-0552003-07-0707 July 2003 Submittal of Operations Quality Assurance Plan Change QA-055 NOC-AE-03001525, Submittal of Operations Quality Assurance Plan Change QA-0542003-05-0808 May 2003 Submittal of Operations Quality Assurance Plan Change QA-054 NOC-AE-03001489, Submittal of Operations Quality Assurance Plan Change QA-0532003-03-13013 March 2003 Submittal of Operations Quality Assurance Plan Change QA-053 NOC-AE-02001235, Submittal of Revision 15, Operations Quality Assurance Plan2002-01-0707 January 2002 Submittal of Revision 15, Operations Quality Assurance Plan 2024-04-25
[Table view] |
Text
Nuclear Operating Company South Texas Pro/ect Electric GenerationgStation PO. Box289 Wadsworth, Texas 77483 V June 25, 2015 NOC-AE-15003269 File No.: G09.19 10CFR50.54(a)
STI: 34150943 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498 and STN 50-499 Submittal of Operations Quality Assurance Plan Change QA-082 STP Nuclear Operating Company (STPNOC) submits the attached change to revision 21 of the Operations Quality Assurance Plan (OQAP). These changes provide the necessary revision to Chapter 1.0 of the OQAP to incorporate an organizational realignment.
This change therefore does not represent a reduction in commitment and does not require NRC approval prior to implementation in accordance with the provisions of 10CFR50.54(a)(3).
There are no commitments in this letter.
If there are any questions regarding this matter, please contact Mr. R. M. Scarborough at (361) 972-7392 or Randall Exum at (361) 972-7099.
Dennis L. Koehl President and CEO
Attachment:
Operations Quality Assurance Plan change QA-082
NOC-AE-1 5003269 Page 2 of 2 cc:
(paper copy)
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission (electronic copy) 1600 East Lamar Boulevard Arlington, TX 76011-4511 Morgan, Lewis & Bockius LLP Steve Frantz, Esquire Lisa M. Regner U.S. Nuclear Regulatory Commission Senior Project Manager Lisa M. Regner U.S. Nuclear Regulatory Commission One White Flint North (08H04) 11555 Rockville Pike NRG South Texas LP Rockville, MD 20852 John Ragan Chris O'Hara Jim von Suskil
- NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 CPS Energy Wadsworth, TX 77483 Kevin Polio Cris Eugster L. D. Blaylock Attention: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Crain Caton & James, P.C.
Peter Nemeth City of Austin Cheryl Mele John Wester Texas Dept. of State Health Services Richard A. Ratliff Robert Free
CHANGE QA-082
SUMMARY
OF CHANGES Page 1 of 1 CHAPTER LOCATION ACTION TEXT TOC CH 1.0 INSERT QA-082 CH 1.0 5.3 DELETE performance improvement and 5.3.1 DELETE performance improvement and INSERT (Note during any periods that this position is not filled, the Manager, Quality Assurance will report directly to the Executive Vice President and Chief Administrative Officer.)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN TABLE OF 21 CONTENT TABLE OF CONTENTS PAGE 1 OF 2 EFFECTIVE DATE 02-01-14 Chapter Title Effective Effective Change Number Chapter Revision Date Notice No.
Definitions 10 2-1-14 1.0 Organization 17 2-1-14 QA-081 QA-082 2.0 Program Description 19 2-1-14 3.0 Conduct of Operation 9 2-1-14 4.0 Qualification, Training, and 7 2-1-14 Certification of Personnel 5.0 Maintenance, Installation of 6 2-1-14 Modifications, and Related Activities 6.0 Design and Modification Control 11 2-1-14 7.0 Procurement 14 2-1-14 8.0 Control and Issuance of Documents 7 2-1-14 9.0 Control of Material 7 2-1-14 10.0 Inspection 12 2-1-14 11.0 Test Control 9 2-1-14 12.0 Instrument and Calibration Control 7 2-1-14 13.0 Control Of Conditions Adverse to 15 2-1-14 Quality 14.0 Records Control 9 2-1-14 4- 4-
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN TABLE 21 OF CONTENT TABLE OF CONTENTS PAGE 2 OF 2 EFFECTIVE DATE 02-01-14 Chapter Title Effective Effective Change Number Chapter Revision Date Notice No.
15.0 Quality Oversight Activities 14 2-1-14 16.0 Independent Technical Review 13 2-1-14 QA-081 17.0 ASME Code Section XI - Repairs 11 2-1-14 and Replacements 18.0 ASME Code Section XI- Inservice 12 2-1-14 Inspection and Testing 19.0 Administrative Controls 6 2-1-14 QA-081 20.0 Dry Cask Storage System and 1 2-1-14 Independent Spent Fuel Storage Installation
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 17 ORGANIZATION PAGE 1 OF 5 EFFECTIVE DATE 02-01-14 1.0 PURPOSE 1.1 The purpose of this chapter is to describe the organizational structure as related to quality assurance and to establish the responsibilities of organizations for the South Texas Project (STP).
2.0 SCOPE 2.1 STP Nuclear Operating Company (STPNOC), as licensee, has the Quality responsibility for design, engineering, procurement, fabrication, modification, maintenance, repair, in-service inspection, refueling, testing, and operation of the STP Units 1 & 2, Dry Cask Storage System (DCSS), and Independent Spent Fuel Storage Installation (ISFSI).
3.0 DEFINITIONS 3.1 None
4.0 REFERENCES
4.1 None 5.0 RESPONSIBILITIES 5.1 The STPNOC organization includes the Executive Vice President and Chief Administrative Officer, Executive Vice President and Chief Financial Officer, and the Senior Vice President, Operations. The senior management of these groups report to the President and Chief Executive Officer.
5.2 The President and Chief Executive Officer has overall responsibility for the implementation of the Operations Quality Assurance Program and approving the Operations Quality Assurance Plan (OQAP) and revisions thereto. The President and Chief Executive Officer shall designate those members of senior management to function as the Senior Management Team.
5.3 The Executive Vice President and Chief Administrative Officer is responsible for implementing quality program requirements applicable to the following functions: 'T information technology, nuclear oversight (quality assurance), plant protection, emergency response, cyber security, access authorization, and fitness for duty.
The management of these functions report to the Executive Vice President and Chief Administrative Officer.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 1.0 17 ORGANIZATION PAGE 2 OF 5 EFFECTIVE DATE 02-01-14 5.3.1 The Manager, Nuclear Oversight is responsible for implementing quality program requirements applicable to quality assurance. The management of this function reports to the Manager, Nuclear Oversight. (Note during any periods that this position is not filled, the Manager, Quality Assurance will report directly to the Executive Vice President and Chief 00 Administrative Officer.)
5.3.1.1 The Manager, Quality Assurance has the independence to conduct Quality activities without undue pressure of cost or schedule and is responsible for the following:
Development, maintenance, and independent verification of implementation of the STP Quality Program; making periodic reports on its effectiveness; review of selected documents which control activities within its scope; and preparation, control, and approval of the OQAP and revisions thereto; Identify, initiate, recommend, or provide solutions to quality-related problems and verify the implementation and effectiveness of the solutions; and Independent oversight activities, including audits, independent assessments, evaluations, surveillances, performance monitoring, inspections, independent oversight of NDE examinations, vendor oversight, and administration of organizational unit independent review activities.
5.3.1.2 The Manager, Nuclear Oversight and the Manager, Quality Assurance, at their discretion, have unfettered access to the President and Chief Executive Officer and the Board of Directors.
5.3.1.3 The Manager, Nuclear Oversight and the Manager, Quality Assurance have the authority to stop work for cause. This authority has been granted by the President and Chief Executive Officer. The Quality organization, including the inspection staff, is based upon the anticipated Quality involvement in operations, modification, and maintenance activities.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 17 ORGANIZATION PAGE 3 OF 5 EFFECTIVE DATE 02-01-14 5.3.2 The Director, Information Technology is responsible for implementing quality program requirements applicable to the following functions:
information technology, cyber security and records management. The management of these functions report to the Director, Information Technology.
5.3.3 The General Manager, Human Resources, Knowledge Transfer &
Organizational Development is responsible for implementing quality program requirements applicable to fitness for duty and access authorization. The management of this function reports to the General Manager, Human Resources, Knowledge Transfer & Organizational Development.
5.4 The Senior Vice President, Operations is responsible for implementing quality program requirements applicable to the following functions: generation, engineering, and projects. The management of these functions report to the Senior Vice President, Operations.
5.4.1 The Site Vice President is responsible for implementing quality program requirements applicable to staffing STP with qualified personnel and acquiring and coordinating the assistance of internal and external organizations for the following functions including: plant general management, training, and regulatory affairs. The senior management of 0' these functions report to the Site Vice President.
5.4.1.1 The Plant General Manager has prime responsibility for the safe operations of the units. The plant staff, under the direction of the Plant General Manager, develops detailed procedures and instructions for testing, operation, modification, and
- maintenance of the STP. The Plant General Manager is responsible for implementing quality program requirements applicable to the following functions including: operations, maintenance, chemistry, health physics, and work control. The management of these functions report to the Plant General Manager.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 10 17 ORGANIZATION PAGE 4 OF 5 EFFECTIVE DATE 02-01-14 5.4.2 The General Manager, Engineering is responsible for implementing quality program requirements applicable to the following functions: design engineering, testing/program engineering, systems engineering, maintenance engineering, and nuclear fuel & analysis (includes risk management). The management of these functions report to the General Manager, Engineering.
5.4.2.1 The Manager, Nuclear Fuel & Analysis is responsible for implementing quality program requirements applicable to the following functions: reactor engineering, core design, reload safety analysis, nuclear fuel performance and supply, and risk management (probabilistic risk assessment and risk-informed applications).
Activities related to the Comprehensive Risk Management Program include oversight of Probabilistic Safety Assessment activities. The Comprehensive Risk Management Expert Panel guides the implementation of the Comprehensive Risk Management Program and is composed of a Chairman and C?
additional senior level management designated by the President and Chief Executive Officer.
5.4.3 The General Manager, Projects is responsible for implementing quality program requirements applicable to the following functions: strategic projects, engineering projects, outage management, and major projects.
The management of these functions report to the General Manager, Projects.
5.5 The Executive Vice President and Chief Financial Officer is responsible for implementing quality program requirements applicable to contracts &
procurement. The management of this function reports to the Executive Vice President and Chief Financial Officer.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 1.0 17 ORGANIZATION PAGE 5 OF 5 EFFECTIVE DATE 02-01-14 6.0 REQUIREMENTS 6.1 The fundamental responsibility for implementing quality program requirements is assigned to all personnel perfonning activities affecting the safe and reliable operation of STP. These personnel and their management are responsible for implementing through approved procedures and other work documents, the quality assurance program controls described in the OQAP. Line organizational details and responsibilities for Units 1 & 2 are further described in STP UFSAR Chapter 13.1.
7.0 DOCUMENTATION 7.1 None 8.0 ATTACHMENTS 8.1 None