MONTHYEARNOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Supplement to Request for Exemption from Certificate of Compliance (CoC) Inspection Requirement for One Multipurpose Canister2022-04-0101 April 2022 Supplement to Request for Exemption from Certificate of Compliance (CoC) Inspection Requirement for One Multipurpose Canister NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic 2024-03-19
[Table view] Category:Quality Assurance Program
MONTHYEARML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 ML21231A1472021-08-19019 August 2021 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages NOC-AE-20003699, Submittal of Operations Quality Assurance Plan Change QA-088 and Revision 242020-01-0808 January 2020 Submittal of Operations Quality Assurance Plan Change QA-088 and Revision 24 NOC-AE-18003599, Submittal of Operations Quality Assurance Plan Change QA-0872018-09-24024 September 2018 Submittal of Operations Quality Assurance Plan Change QA-087 NOC-AE-18003588, Submittal of Operations Quality Assurance Plan Change QA-0862018-08-0606 August 2018 Submittal of Operations Quality Assurance Plan Change QA-086 NOC-AE-18003540, Submittal of Revised Operations Quality Assurance Plan2018-01-10010 January 2018 Submittal of Revised Operations Quality Assurance Plan NOC-AE-17003489, Submittal of Operations Quality Assurance Plan Change QA-0852017-06-20020 June 2017 Submittal of Operations Quality Assurance Plan Change QA-085 NOC-AE-16003409, Submittal of Operations Quality Assurance Plan Change QA-0842016-09-0707 September 2016 Submittal of Operations Quality Assurance Plan Change QA-084 NOC-AE-16003342, Submittal of Operations Quality Assurance Plan Change QA-0832016-02-29029 February 2016 Submittal of Operations Quality Assurance Plan Change QA-083 NOC-AE-16003326, Submittal of Revised Operations Quality Assurance Plan, Revision 222016-01-14014 January 2016 Submittal of Revised Operations Quality Assurance Plan, Revision 22 NOC-AE-15003269, Submittal of Operations Quality Assurance Plan Change QA-0822015-06-25025 June 2015 Submittal of Operations Quality Assurance Plan Change QA-082 NOC-AE-14003071, Submittal of Revised Operations Quality Assurance Plan2014-01-20020 January 2014 Submittal of Revised Operations Quality Assurance Plan NOC-AE-13003050, Submittal of Operations Quality Assurance Plan Change QA-0802013-11-11011 November 2013 Submittal of Operations Quality Assurance Plan Change QA-080 NOC-AE-13003012, Submittal of Operations Quality Assurance Plan Change QA-0792013-06-18018 June 2013 Submittal of Operations Quality Assurance Plan Change QA-079 NOC-AE-13002955, Submittal of Operations Quality Assurance Plan Change QA-0782013-01-24024 January 2013 Submittal of Operations Quality Assurance Plan Change QA-078 NOC-AE-12002919, Submittal of Operations Quality Assurance Plan Change QA-0772012-11-0101 November 2012 Submittal of Operations Quality Assurance Plan Change QA-077 NOC-AE-12002887, Submittal of Operations Quality Assurance Plan Change QA-0752012-08-0101 August 2012 Submittal of Operations Quality Assurance Plan Change QA-075 NOC-AE-12002863, Submittal of Operations Quality Assurance Plan Change QA-0742012-06-0404 June 2012 Submittal of Operations Quality Assurance Plan Change QA-074 NOC-AE-12002781, Submittal of Revised Operations Quality Assurance Plan2012-01-18018 January 2012 Submittal of Revised Operations Quality Assurance Plan NOC-AE-11002768, Submittal of Operations Quality Assurance Plan Change QA-0732011-12-0707 December 2011 Submittal of Operations Quality Assurance Plan Change QA-073 NOC-AE-11002637, Submittal of Operations Quality Assurance Plan Change QA-0722011-02-10010 February 2011 Submittal of Operations Quality Assurance Plan Change QA-072 NOC-AE-10002614, Submittal of Operations Quality Assurance Plan Change QA-0712010-10-28028 October 2010 Submittal of Operations Quality Assurance Plan Change QA-071 NOC-AE-09002460, Submittal of Operations Quality Assurance Plan Change QA-0692009-09-24024 September 2009 Submittal of Operations Quality Assurance Plan Change QA-069 NOC-AE-09002418, Submittal of Operations Quality Assurance Plan Change QA-0682009-04-22022 April 2009 Submittal of Operations Quality Assurance Plan Change QA-068 NOC-AE-08002314, Submittal of Operations Quality Assurance Plan Change QA-0672008-06-0505 June 2008 Submittal of Operations Quality Assurance Plan Change QA-067 NOC-AE-08002256, Submittal of Revised Operations Quality Assurance Plan2008-01-15015 January 2008 Submittal of Revised Operations Quality Assurance Plan NOC-AE-07002171, Submittal of Operations Quality Assurance Plan Change QA-0662007-06-12012 June 2007 Submittal of Operations Quality Assurance Plan Change QA-066 NOC-AE-07002157, Submittal of Operations Quality Assurance Plan Change QA-0652007-04-30030 April 2007 Submittal of Operations Quality Assurance Plan Change QA-065 ML0709406882007-03-26026 March 2007 Submittal of Quality Assurance Program Description NOC-AE-07002138, Submittal of Rev. 17 to Operations Quality Assurance Plan Change QA-0642007-03-26026 March 2007 Submittal of Rev. 17 to Operations Quality Assurance Plan Change QA-064 ML0708903192007-03-26026 March 2007 South Texas Project, Units 1 and 2 - Submittal of Operations Quality Assurance Plan Change QA-064 NOC-AE-07002110, Submittal of Operations Quality Assurance Plan Change QA-0632007-01-31031 January 2007 Submittal of Operations Quality Assurance Plan Change QA-063 NOC-AE-07002108, Submittal of Operations Quality Assurance Plan Change QA-0622007-01-18018 January 2007 Submittal of Operations Quality Assurance Plan Change QA-062 NOC-AE-06002050, Submittal of Operations Quality Assurance Plan Change QA-0612006-08-0808 August 2006 Submittal of Operations Quality Assurance Plan Change QA-061 NOC-AE-06002030, Submittal of Operation Quality Assurance Plan Change QA-0602006-06-14014 June 2006 Submittal of Operation Quality Assurance Plan Change QA-060 NOC-AE-06001995, Organization Changes as Described in the Operation Quality Assurance Plan2006-03-21021 March 2006 Organization Changes as Described in the Operation Quality Assurance Plan NOC-AE-06001961, Submittal of Revised Operations Quality Assurance Plan2006-01-10010 January 2006 Submittal of Revised Operations Quality Assurance Plan NOC-AE-05001944, Submittal of Operations Quality Assurance Plan Change QA-0592005-10-26026 October 2005 Submittal of Operations Quality Assurance Plan Change QA-059 NOC-AE-05001908, Submittal of Operations Quality Assurance Plan Change OA-0582005-07-18018 July 2005 Submittal of Operations Quality Assurance Plan Change OA-058 ML0506603792005-02-28028 February 2005 Submittal of Operations Quality Assurance Plan Change QA-057 NOC-AE-04001686, Submittal of Operations Quality Assurance Plan Change QA-0562004-02-17017 February 2004 Submittal of Operations Quality Assurance Plan Change QA-056 NOC-AE-03001553, Submittal of Operations Quality Assurance Plan Change QA-0552003-07-0707 July 2003 Submittal of Operations Quality Assurance Plan Change QA-055 NOC-AE-03001525, Submittal of Operations Quality Assurance Plan Change QA-0542003-05-0808 May 2003 Submittal of Operations Quality Assurance Plan Change QA-054 NOC-AE-03001489, Submittal of Operations Quality Assurance Plan Change QA-0532003-03-13013 March 2003 Submittal of Operations Quality Assurance Plan Change QA-053 NOC-AE-02001235, Submittal of Revision 15, Operations Quality Assurance Plan2002-01-0707 January 2002 Submittal of Revision 15, Operations Quality Assurance Plan 2024-04-25
[Table view] |
Text
Nuclear Operating Company
= A_`
SohL' Tew Pisled Ek-ar Ga gSton PO. fBar28.9 Mfrdym. Te 77483 October 26, 2005 NOC-AE-05001944 10 CFR 50.54(a)
U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 South Texas Project Units 1 and 2 Docket Nos. STN 50498 and STN 50-499 Submittal of Operations Qualitv Assurance Plan Change QA-059
Reference:
Letter, J. J. Sheppard to Document Control Desk, "Submittal of Operations Quality Assurance Plan Change QA-057," dated February 28, 2005 (NOC-AE-05001855, ML050660379)
STP Nuclear Operating Company submits the attached change to the Operations Quality Assurance Plan (OQAP). QA-059 revises the OQAP to reflect an organizational realignment made effective on October 1, 2005 in which the Design Engineering Department reports to the Manager, Plant Engineering. QA-059 also corrects an oversight in the referenced letter, which should have revised "Engineering & Technical Services" to read "Engineering" in Chapter 18, Sections 6.1.1.1 and 6.1.2.1.
QA-059 does not reduce any element of or responsibilities for implementation of the QA Program. Therefore, this change does not represent a reduction in commitment and does not require NRC approval prior to implementation in accordance with 10 CFR 50.54(a)(3).
There are no commitments in this letter.
If there are any questions regarding QA-059, please contact Mark McBurnett at (361) 972-7206.
4 J. J.Sheppard President and Chief Executive Officer jtc/
Attachment:
QA-059 &DOq STI: 31945220
NOC-AE-05001944 Page 2 of 2 cc:
(paper copy) (electronic copy)
Bruce S. Mallett A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 David H. Jaffe Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission C. M. Canady Jack A. Fusco City of Austin Michael A. Reed Electric Utility Department Texas Genco, LP 721 Barton Springs Road Austin, TX 78704 Richard A. Ratliff C. Kirksey Bureau of Radiation Control City of Austin Texas Department of State Health Services 1100 West 49th Street Jon C. Wood Austin, TX 78756-3189 Cox Smith Matthews Jeffrey Cruz J. J. Nesrsta U. S. Nuclear Regulatory Commission R. K. Temple P. 0. Box 289, Mail Code: MN1 16 E. Alarcon Wadsworth, TX 77483 City Public Service
CHANGE QA-059
SUMMARY
OF CHANGES Page 1 of 1 ALL CHANGES ARE IN BOLD TYPE CHAPTER LOCATION ACTION TEXT TOC CH 1.0 INSERT QA-059 CH 18.0 INSERT QA-059 CH 1.0 5.1.4 DELETE design engineering INSERT engineering projects CHANGE nuclear fuels & safety analysis to fuels & analysis CH 18.0 6.1.1.1 DELETE & Technical Services 6.1.2.1 DELETE & Technical Services
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN TABLE 16 TABLE OF CONTENTS CONTENT PAGE I OF 2 EFFECTIVE DATE 02-01-04 Chapter Title Effective Effective Change Number Chapter Revision Date Notice No.
Definitions 9 2-1-02 1.0 Organization 12 2-1-04 QA-057, QA-059 2.0 Program Description 14 2-1-04 QA-056,QA-057 3.0 Conduct of Plant Operations 7 2-1-98 4.0 Qualification, Training, and 6 2-1-98 Certification of Personnel 5.0 Maintenance, Installation of 5 2-1-98 Modifications, and Related Activities 6.0 Design and Modification Control 8 2-1-02 QA-058 7.0 Procurement 9 2-1-02 QA-057 8.0 Control and Issuance of 6 2-1-98 Documents 9.0 Control of Material 6 2-1-98 10.0 Inspection 9 2-1-02 QA-057 11.0 Test Control 7 2-1-00 12.0 Instrument and Calibration 6 2-1-98 Control 13.0 Control Of Conditions Adverse 10 2-1-02 QA-057 to Quality 14.0 Records Control 7 2-1-02 QA-057 15.0 Quality Oversight 9 2-1-04 QA-057 Activities
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN TABLE 16 CONTENT TABLE OF CONTENTS PAGE 2 OF2 EFFECTIVE DATE 02-01-04 Chapter Title Effective Effective Change Number Chapter Revision Date Notice No.
16.0 Independent Technical 8 2-01-04 QA-057 Review 17.0 ASME Code Section XI - 6 2-01-00 QA-057 Repairs and Replacements 18.0 ASME Code Section XI - 7 2-01-00 QA-057, QA-059 Inservice Inspection and Testing 19.0 Administrative Controls 1 2-01-04 QA-056, QA-057
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 1.0 12 ORGANIZATION PAGE I OF 4 EFFECTIVE DATE 02-01-04 1.0 PURPOSE 1.1 The purpose of this chapter is to describe the organizational structure as related to quality assurance and to establish the responsibilities of organizations for the South Texas Project Electric Generating Station (STP).
2.0 SCOPE 2.1 STP Nuclear Operating Company (STPNOC), as licensee, has the Quality responsibility for design, engineering, procurement, fabrication, modification, maintenance, repair, in-service inspection, refueling, testing, and operation of the STP.
3.0 DEFINITIONS 3.1 None
4.0 REFERENCES
4.1 None 5.0 RESPONSIBILITIES 5.1 The STPNOC is comprised of Generation, Oversight, Engineering, Finance, and Support. The senior management of these groups report to the President and Chief Executive Officer.
U:
5.1.1 The President and Chief Executive Officer has overall responsibility for the implementation of the Operations Quality Assurance Program and approving the Operations Quality Assurance Plan (OQAP) and revisions thereto. The President and Chief Executive Officer shall designate those members of senior management to function as the Senior Management Team.
5.1.2 The Vice President, Generation is responsible for implementing quality program requirements applicable to staffing STP with qualified personnel and acquiring and coordinating the assistance of internal and external organizations for the following functions including: generation support, l operations, maintenance, chemistry, health physics, and work6 management. The senior management of these functions report to the Vice President, Generation.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 1.0 12 ORGANIZATION PAGE 2 OF4 EFFECTIVE DATE 02-01-04 5.1.2.1 The Plant General Manager has prime responsibility for the safe operations of the units. The plant staff, under the direction of the Plant General Manager, develop detailed procedures and instructions for testing, operation, modification, and maintenance of the STP.
5.1.3 The Vice President, Oversight is responsible for implementing quality program requirements applicable to the following functions: nuclear safety assurance, performance improvement, training, plant protection, and employee concerns. The senior management of these functions report to the Vice President, Oversight.
5.1.3.1 The Manager, Nuclear Safety Assurance has the independence to conduct Quality activities without undue pressure of cost or schedule and is responsible for the following:
Development, maintenance, and independent verification of c implementation of the STP Quality Program; making periodic reports on its effectiveness; review of selected documents which control activities within its scope; and preparation, control, and approval of the OQAP and revisions thereto; Identify, initiate, recommend, or provide solutions to quality-related problems and verify the implementation and effectiveness of the solutions; and Independent oversight activities, including audits, independent assessments, evaluations, surveillances, performance monitoring, inspections, independent oversight of NDE examinations, and administration of organizational unit independent review activities.
5.1.3.2 The Manager, Nuclear Safety Assurance, at his discretion, has unfettered access to the President and Chief Executive Officer and the Board of Directors. During performance of independent oversight of activities where a conflict of interest could exist for the Manager, Nuclear Safety Assurance, the Quality Manager, at his discretion, may report to the President and Chief Executive Officer or the Board of Directors.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 1.0 12 ORGANIZATION PAGE 3 OF 4 EFFECTIVE DATE 02-01-04 5.1.3.3 The Manager, Nuclear Safety Assurance and the Quality >
6 Manager have the authority to stop work for cause. This authority has been granted by the President and Chief Executive Officer. The Quality organization, including the inspection staff, is based upon the anticipated Quality involvement in operations, modification, and maintenance activities.
5.1.3.4 The Manager, Risk Management is responsible for activities o6 related to the Comprehensive Risk Management Program, including oversight of Probabilistic Safety Assessment activities. The Comprehensive Risk Management Expert Panel guides the implementation of the Comprehensive Risk Management Program and is composed of a Chairman and additional senior level management designated by the President and Chief Executive Officer.
5.1.4 The Vice President, Engineering is responsible for implementing quality program requirements applicable to the following functions: fuels &
analysis, plant engineering, engineering projects, and administrative support. The senior management of these functions report to the Vice :>
President, Engineering 5.1.5 The General Manager, Support is responsible for implementing quality program requirements applicable to the following functions: information technology and records management services and administration for STP.
The senior management of these functions report to the General Manager, Support.
5.1.6 The General Manager, Finance is responsible for implementing quality program requirements applicable to the following function: nuclear purchasing and material management activities. The senior management l of this function reports to the General Manager, Finance.
6.0 REQUIREMENTS 6.1 The fundamental responsibility for implementing quality program requirements is assigned to all personnel performing activities affecting the safe and reliable operation of the STP. These personnel and their management are responsible for implementing through approved procedures and other work documents, the quality assurance program controls described in the OQAP. Line organizational details and responsibilities are further described in STP UFSAR Chapter 13.1.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 1.0 12 ORGANIZATION PAGE 4 OF4 EFFECTIVE DATE 02-01-04 7.0 DOCUMENTATION 7.1 None 8.0 ATTACHMENTS 8.1 None
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 18.0 7 ASME CODE SECTION Xi - INSERVICE INSPECTION AND TESTING PAGE I OF 3 EFFECTIVE DATE 02-01-00 1.0 PURPOSE 1.1 The purpose of this chapter is to prescribe requirements and responsibilities for the inservice examination and testing programs at the South Texas Project Electric Generating Station (STPEGS).
2.0 SCOPE 2.1 This chapter applies to the inservice examination and testing of Class 1, 2, 3, CC, and MC pressure retaining components and component supports as specified in Section XI of the ASME Boiler and Pressure Vessel Code and additional ISI commitments as specified in the UFSAR.
3.0 DEFINITIONS 3.1 None
4.0 REFERENCES
4.1 ASME Code Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components 4.2 10CFR50.55a, Codes and Standards 4.3 OQAP Chapter 4.0, Qualification, Training and Certification of Personnel 4.4 OQAP Chapter 14.0, Records Control 5.0 RESPONSIBILITIES 5.1 The Vice President, Engineering is responsible for developing and implementing the inservice examination and testing programs as required by ASME Code Section XI. The Vice President, Engineering is responsible for verifying the implementation of the inservice examination and testing programs through appropriate quality oversight activities, interfacing with the Authorized Inspection Agency, and performance of nondestructive examinations as requested.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 18.0 7 ASME CODE SECTION XI - INSERVICE INSPECTION AND TESTING PAGE 2 OF 3 EFFECTIVE DATE 02-01-00 6.0 REQUIREMENTS 6.1 The inservice examination and testing programs consist of plans and implementing procedures for the examination and testing of Class 1, 2, 3, CC, and MC pressure retaining components and their supports and the inservice testing of Class 1, 2, and 3 pumps and valves.
6.1.1 Examination and Testing of Pressure Retaining Components and Component Supports 6.1.1.1 Engineering shall develop plans for examination and testing of Class 1, 2, 3, CC, and MC components and their supports.
These plans shall prescribe the requirements for nondestructive I examinations and tests and the schedule for their performance.
6.1.1.2 Inspection plans (e.g., specifications, vendor documents, etc.)
shall be developed which identify the nature and extent of examination and testing activities including the acceptance criteria which must be met.
6.1.1.3 Procedures shall be developed which provide measures for the performance of activities identified in the plans.
6.1.2 Inservice Testing of Pumps and Valves and System Pressure Testing 6.1.2.1 Engineering shall develop the Inservice Testing Program for pumps and valves and the System Pressure Testing Program. 6 These programs shall include the requirements and the D schedule for their performance.
6.1.3 Examination and test results shall be evaluated by specified personnel and verified by the Authorized Nuclear Inservice Inspector.
6.1.4 Coordination of involved STP Nuclear Operating Company (STPNOC) departments, including the use of contractors for the performance, documentation and evaluation of inservice inspection activities, shall be controlled by approved procedures.
6.1.5 When contractors are used to perform activities within the scope of this section, their quality assurance program shall be approved by STPNOC.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.
Chapter NO.
OPERATIONS QUALITY ASSURANCE PLAN 18.0 7 ASME CODE SECTION Xl - INSERVICE INSPECTION AND TESTING PAGE 3 OF 3 EFFECTIVE DATE 02-01-00 6.1.6 Exceptions to code examination and testing requirements shall be documented in accordance with Reference 4.2.
6.1.7 Personnel performing examinations and tests shall be qualified as required by Reference 4.1 and Reference 4.3.
6.1.8 Plans and reports for inservice examinations and tests shall be submitted to the appropriate regulatory and enforcement authorities as required by Section XI.
7.0 DOCUMENTATION 7.1 Procedures which are generated as required by this chapter shall identify the records which are required to implement and document those activities. The records shall be controlled in accordance with Reference 4.4.
8.0 ATTACHMENTS 8.1 None