MONTHYEARIR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 2024-09-04
[Table view] Category:Quality Assurance Program
MONTHYEARML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 ML21231A1472021-08-19019 August 2021 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages NOC-AE-20003699, Submittal of Operations Quality Assurance Plan Change QA-088 and Revision 242020-01-0808 January 2020 Submittal of Operations Quality Assurance Plan Change QA-088 and Revision 24 NOC-AE-18003599, Submittal of Operations Quality Assurance Plan Change QA-0872018-09-24024 September 2018 Submittal of Operations Quality Assurance Plan Change QA-087 NOC-AE-18003588, Submittal of Operations Quality Assurance Plan Change QA-0862018-08-0606 August 2018 Submittal of Operations Quality Assurance Plan Change QA-086 NOC-AE-18003540, Submittal of Revised Operations Quality Assurance Plan2018-01-10010 January 2018 Submittal of Revised Operations Quality Assurance Plan NOC-AE-17003489, Submittal of Operations Quality Assurance Plan Change QA-0852017-06-20020 June 2017 Submittal of Operations Quality Assurance Plan Change QA-085 NOC-AE-16003409, Submittal of Operations Quality Assurance Plan Change QA-0842016-09-0707 September 2016 Submittal of Operations Quality Assurance Plan Change QA-084 NOC-AE-16003342, Submittal of Operations Quality Assurance Plan Change QA-0832016-02-29029 February 2016 Submittal of Operations Quality Assurance Plan Change QA-083 NOC-AE-16003326, Submittal of Revised Operations Quality Assurance Plan, Revision 222016-01-14014 January 2016 Submittal of Revised Operations Quality Assurance Plan, Revision 22 NOC-AE-15003269, Submittal of Operations Quality Assurance Plan Change QA-0822015-06-25025 June 2015 Submittal of Operations Quality Assurance Plan Change QA-082 NOC-AE-14003071, Submittal of Revised Operations Quality Assurance Plan2014-01-20020 January 2014 Submittal of Revised Operations Quality Assurance Plan NOC-AE-13003050, Submittal of Operations Quality Assurance Plan Change QA-0802013-11-11011 November 2013 Submittal of Operations Quality Assurance Plan Change QA-080 NOC-AE-13003012, Submittal of Operations Quality Assurance Plan Change QA-0792013-06-18018 June 2013 Submittal of Operations Quality Assurance Plan Change QA-079 NOC-AE-13002955, Submittal of Operations Quality Assurance Plan Change QA-0782013-01-24024 January 2013 Submittal of Operations Quality Assurance Plan Change QA-078 NOC-AE-12002919, Submittal of Operations Quality Assurance Plan Change QA-0772012-11-0101 November 2012 Submittal of Operations Quality Assurance Plan Change QA-077 NOC-AE-12002887, Submittal of Operations Quality Assurance Plan Change QA-0752012-08-0101 August 2012 Submittal of Operations Quality Assurance Plan Change QA-075 NOC-AE-12002863, Submittal of Operations Quality Assurance Plan Change QA-0742012-06-0404 June 2012 Submittal of Operations Quality Assurance Plan Change QA-074 NOC-AE-12002781, Submittal of Revised Operations Quality Assurance Plan2012-01-18018 January 2012 Submittal of Revised Operations Quality Assurance Plan NOC-AE-11002768, Submittal of Operations Quality Assurance Plan Change QA-0732011-12-0707 December 2011 Submittal of Operations Quality Assurance Plan Change QA-073 NOC-AE-11002637, Submittal of Operations Quality Assurance Plan Change QA-0722011-02-10010 February 2011 Submittal of Operations Quality Assurance Plan Change QA-072 NOC-AE-10002614, Submittal of Operations Quality Assurance Plan Change QA-0712010-10-28028 October 2010 Submittal of Operations Quality Assurance Plan Change QA-071 NOC-AE-09002460, Submittal of Operations Quality Assurance Plan Change QA-0692009-09-24024 September 2009 Submittal of Operations Quality Assurance Plan Change QA-069 NOC-AE-09002418, Submittal of Operations Quality Assurance Plan Change QA-0682009-04-22022 April 2009 Submittal of Operations Quality Assurance Plan Change QA-068 NOC-AE-08002314, Submittal of Operations Quality Assurance Plan Change QA-0672008-06-0505 June 2008 Submittal of Operations Quality Assurance Plan Change QA-067 NOC-AE-08002256, Submittal of Revised Operations Quality Assurance Plan2008-01-15015 January 2008 Submittal of Revised Operations Quality Assurance Plan NOC-AE-07002171, Submittal of Operations Quality Assurance Plan Change QA-0662007-06-12012 June 2007 Submittal of Operations Quality Assurance Plan Change QA-066 NOC-AE-07002157, Submittal of Operations Quality Assurance Plan Change QA-0652007-04-30030 April 2007 Submittal of Operations Quality Assurance Plan Change QA-065 ML0709406882007-03-26026 March 2007 Submittal of Quality Assurance Program Description NOC-AE-07002138, Submittal of Rev. 17 to Operations Quality Assurance Plan Change QA-0642007-03-26026 March 2007 Submittal of Rev. 17 to Operations Quality Assurance Plan Change QA-064 ML0708903192007-03-26026 March 2007 South Texas Project, Units 1 and 2 - Submittal of Operations Quality Assurance Plan Change QA-064 NOC-AE-07002110, Submittal of Operations Quality Assurance Plan Change QA-0632007-01-31031 January 2007 Submittal of Operations Quality Assurance Plan Change QA-063 NOC-AE-07002108, Submittal of Operations Quality Assurance Plan Change QA-0622007-01-18018 January 2007 Submittal of Operations Quality Assurance Plan Change QA-062 NOC-AE-06002050, Submittal of Operations Quality Assurance Plan Change QA-0612006-08-0808 August 2006 Submittal of Operations Quality Assurance Plan Change QA-061 NOC-AE-06002030, Submittal of Operation Quality Assurance Plan Change QA-0602006-06-14014 June 2006 Submittal of Operation Quality Assurance Plan Change QA-060 NOC-AE-06001995, Organization Changes as Described in the Operation Quality Assurance Plan2006-03-21021 March 2006 Organization Changes as Described in the Operation Quality Assurance Plan NOC-AE-06001961, Submittal of Revised Operations Quality Assurance Plan2006-01-10010 January 2006 Submittal of Revised Operations Quality Assurance Plan NOC-AE-05001944, Submittal of Operations Quality Assurance Plan Change QA-0592005-10-26026 October 2005 Submittal of Operations Quality Assurance Plan Change QA-059 NOC-AE-05001908, Submittal of Operations Quality Assurance Plan Change OA-0582005-07-18018 July 2005 Submittal of Operations Quality Assurance Plan Change OA-058 ML0506603792005-02-28028 February 2005 Submittal of Operations Quality Assurance Plan Change QA-057 NOC-AE-04001686, Submittal of Operations Quality Assurance Plan Change QA-0562004-02-17017 February 2004 Submittal of Operations Quality Assurance Plan Change QA-056 NOC-AE-03001553, Submittal of Operations Quality Assurance Plan Change QA-0552003-07-0707 July 2003 Submittal of Operations Quality Assurance Plan Change QA-055 NOC-AE-03001525, Submittal of Operations Quality Assurance Plan Change QA-0542003-05-0808 May 2003 Submittal of Operations Quality Assurance Plan Change QA-054 NOC-AE-03001489, Submittal of Operations Quality Assurance Plan Change QA-0532003-03-13013 March 2003 Submittal of Operations Quality Assurance Plan Change QA-053 NOC-AE-02001235, Submittal of Revision 15, Operations Quality Assurance Plan2002-01-0707 January 2002 Submittal of Revision 15, Operations Quality Assurance Plan 2024-04-25
[Table view] |
Text
Nuclear Operating Company South 'ferns Project Elcc/ric Cc11cr11/in,g Sia/ion PO. Box 289 W,,dsworlh, Texas 77481 August 19, 2021 NOC-AE-21003822 10CFR71.106 ATTN : Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington , DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498 and STN 50-499 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages
Reference:
Letter; P. Silva (USNRC) to D. L. Koehl ; "Revised Quality Assurance Program Approval Form for Radioactive Material Packages No. 0645, Revision 5 ;"
dated August 28, 2015 (ML15245A285).
In accordance with 10CFR 71 .1(a), 10CFR 71 .106(b), and the above referenced letter, STP Nuclear Operating Company (STPNOC) hereby submits a report of changes to the STPNOC Quality Assurance (QA) Program for Radioactive Material Packages (No. 0654, Revision 5) approved on August 28, 2015. The changes to the STPNOC QA Program for Radioactive Material Packages are documented in STPNOC procedure 0PGP03-ZR-0053, "Radioactive Material Control Program ," Revision 21, effective June 30, 2021 .
Attached is a summary of the changes to the subject procedure made since August 7, 2019.
The attachment documents that the changes are non-substantive in nature, involving administrative items and editorial type clarifications . The changes do not reduce commitments in the STPNOC QA Program for Radioactive Material Packages.
There are no commitments in this letter.
{U:, , /
If there are any questions regarding this matter, please contact Ali Alb aj at (361) 972-8949 or me at (361) 972-8168.
~/Nf'tlY ayton B. Stone Manager, Health Physics aa
Attachment:
Summary of Changes Made to the South Texas Project Nuclear Operating Company Quality Assurance Program for Rad ioactive Material Packages Since August 7, 2019 cc:
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington , TX 76011-4511
NOC-AE-21003822 Attachment Page 1 of 2 Attachment Summary of Changes Made to the South Texas Project Nuclear Operating Company Quality Assurance Program for Radioactive Material Packages Since August 7, 2019 Changes to 0PGP03-ZR-0053, Rev. 21 (Effective June 30, 2021)
Step Description of Changes Regulatory Basis Changed Table of Removed Section 7.5 Removal of Material from 10CFR71.106(b):
Contents Radiologically Controlled Areas Administrative References to 0PRP04-ZR-0004, Release of Materials improvement from Radiologically Controlled Areas is now provided for guidance related to these activities.
Step 1.8 Removed hyphen from by-product material for 10CFR71.106(b):
consistency within the procedure. Spelling correction Step 2.15 Corrected Title to read Radiological Postings and 10CFR71.106(b):
Warning Devices Administrative improvement Inserted Revisions to this program are required to be reviewed in 10CFR71.106(b):
Caution accordance with 10 CFR 71.106. Changes to the Administrative Box prior program may be made provided the change does not improvement to Step reduce the commitments in the program previously 4.12 accepted by the NRC. Changes to the program that do reduce the commitments must be submitted to the NRC for review and approval prior to implementation.
Add step IF a change is desired to the program, THEN perform a 10CFR71.106(b):
4.12.1 review per the criteria in 10 CFR 71.106 Administrative improvement Add step IF it is determined the change does not reduce the 10CFR71.106(b):
4.12.2 quality program commitments previously accepted by Administrative the NRC, THEN NRC approval is not required prior to improvement implementation.
Add step IF the change reduces quality program commitments 10CFR71.106(b):
4.12.3 previously accepted by the NRC, THEN obtain NRC Administrative approval prior to implementation. improvement Add step IF NRC approval is required prior to implementation, 10CFR71.106(b):
4.12.4 THEN Administrative improvement
NOC-AE-21003822 Attachment Page 2 of 2 Changes to 0PGP03-ZR-0053, Rev. 21 (Effective June 30, 2021)
Step Description of Changes Regulatory Basis Changed Add step Provide written justification for the change to allow 10CFR71.106(b):
4.12.4.1 Licensing to request prior approval from the NRC Administrative improvement Add step Add an action to the CR tracking the change to verify 10CFR71.106(b):
4.12.4.2 that NRC approval is obtained Administrative improvement Note below Corrected reference to the title for 0PRP04-ZR-0015 10CFR71.106(b):
7.4 Radiological Postings and Warning Devices Administrative improvement Deleted Release of Materials from Radiologically Controlled 10CFR71.106(b):
Step 7.5 Areas Administrative improvement Deleted Waste materials unconditionally released from the 10CFR71.106(b):
Step 7.5.1 Radiologically Controlled Area SHALL be disposed of in Administrative accordance with 0PGP03-ZH-0003 (Packaging of non- improvement Radioactive Waste Materials for Disposal).
Step 7.5.3 Corrected the reference which should be 7.5.1. 10CFR71.106(b):
Administrative improvement Addendum Removed Addendum 2, Examples of RAM Labels/Tags. 10CFR71.106(b):
2 Addendum 2 is not referenced in the body of the Administrative procedure and the procedure directs to improvement 0PRP04-ZR-0015.