NL-19-1091, CFR 72.48(d)(2) Biennial Report

From kanterella
Jump to navigation Jump to search
CFR 72.48(d)(2) Biennial Report
ML19268A778
Person / Time
Site: Vogtle, 07201039  Southern Nuclear icon.png
Issue date: 09/25/2019
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
NL-19-1091
Download: ML19268A778 (1)


Text

~ Southern Nuclear \51'i ColomlJl.k PJII,\\J\

RmnmghJm. >\I Vi24 \

20'i'i92 'i()()() td SEP 2 5 2019 205 9lJ2.779'i IJ\

Docket Nos.: 50-424 NL-19-1091 50-425 72-1039 ATIN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 72.48(d)(2) Biennial Report Ladies and Gentlemen:

The purpose of this biennial report is to inform the NRC of changes to the Vogtle Electric Generating Plant Units 1 and 2 (VEGP) Independent Spent Fuel Storage Installation (ISFSI) or changes to the cask designs used in conjunction with the VEGP ISFSI by Southern Nuclear Operating Company (SNC) in accordance with the provisions of 10 CR 72.48 for the reporting period of September 1, 2017 to August 31,2019. During this reporting period, SNC performed no 10 CFR 72.48 evaluations.

This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at (205) 992-6611.

Respectfully submitted, efb/scm cc: NRC Regional Administrator, Region II NRC NRR Project Manager- Vogtle NRC Senior Resident Inspector- Vogtle SNC Records RTYPE: CVC7000