ML070790246
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/12/2007
From: Dacimo F
Entergy Nuclear Northeast
To:
Document Control Desk, NRC/NRR/ADRO
References
EA-06-037, NL-07-037, TAC MD3075
Download: ML070790246 (5)


Text

EnterAi Nuclear Northeast Entergy Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 Fred Dacimo Site Vice President Administration March 12, 2007 Re: Indian Point Units 2 and 3 Dockets 50-247 and 50-286 NL-07-037 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Supplement to License Amendment Request Regarding Miscellaneous Editorial Changes (TAC MD3074/3075)

References:

1. Entergy letter NL-06-099 to NRC; "Proposed Changes to Indian Point 2 and 3 Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-485" dated September 25, 2006.
2. NRC letter to Entergy regarding Issuance of Indian Point 2 License Amendment 250, dated December 13, 2006 [ML063050208].
3. NRC letter to Entergy regarding Administrative Change to Facility Operating License in Conjunction With the Commission Order EA-06-037, dated December 21, 2006 [ML063390548].

Dear Sir:

Entergy submitted in Reference 1, a license amendment request involving several editorial corrections to the Indian Point 2 (IP2) and Indian Point 3 (IP3) Technical Specifications. Since that time, two additional corrections have been identified. Therefore, this letter requests that the following two items be added to the scope of the Reference 1 change request.

  • Revise IP2 Table of Contents to add a header for the new section, "5.7 High Radiation Area" which was previously added to the IP2 Technical Specifications by License Amendment 250 (Reference 2).

" Revise IP2 Facility Operating License section M.3, to correct a typographical error introduced in Reference 3.

Markup pages depicting the above requested corrections are provided in Attachment One. These changes are editorial in nature so that no technical analysis is required and the No Significant Hazards Evaluation previously provided in Reference 1 remains valid.

AoDI

NL-07-037 Dockets 50-247 and 50-286 Page 2 of 2 There are no new commitments being made in this submittal. If you have any questions or require additional information, please contact Mr. Patric W. Conroy, IPEC Licensing Manager at (914) 734-6668.

I declare under penalty of perjury that the foregoing is true and correct. Executed on 3JI2.-

Fred R. Dacimo Site Vice President Indian Point Energy Center cc: Mr. John P. Boska, Senior Project Manager, NRC NRR DORL Mr. Samuel J. Collins, Regional Administrator, NRC Region 1 NRC Resident Inspector, IP2 Mr. Peter R. Smith, President, NYSERDA Mr. Paul Eddy, New York State Dept. of Public Service

ATTACHMENT ONE TO NL-07-037 MARKUP PAGES FOR SUPPLEMENT TO PROPOSED LICENSE AMENDMENT REQUEST REGARDING MISCELLANEOUS EDITORIAL CHANGES (TAC MD3074/3075)

Affected Pages IP2 Table of Contents page iv IP2 Facility Operating License page 5 (These pages supplement those provided in NL-06-099, dated 9/25/2006)

ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 DOCKETS 50-247 AND 50-286

Facility Operating License No. DPR-26 Appendix A - Technical Specifications TABLE OF CONTENTS 5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility 5.2 Organization 5.2.1 Onsite and Offsite Organizations 5.2.2 Unit Staff 5.3 Unit Staff Qualifications S ce- 5. Procedures

>5.5 Programs And Manuals 5.5.1 Offsite Dose Calculation Manual (ODCM) 5.5.2 Primary Coolant Sources Outside Containment 5.5.3 Radioactive Effluent Controls Program 5.5.4 Component Cyclic or Transient Limit 5.5.5 Reactor Coolant Pump Flywheel Inspection Program 5.5.6 Inservice Testing Program 5.5.7 Steam Generator (SG) Program 5.5.8 Secondary Water Chemistry Program 5.5.9 Ventilation Filter Testing Program (VFTP) 5.5.10 Explosive Gas and Storage Tank Radioactivity Monitoring Program 5.5.11 Diesel Fuel Oil Testing Program 5.5.12 Technical Specification (TS) Bases Control Program 5.5.13 Safety Function Determination Program (SFDP) 5.5.14 Containment Leakage Rate Testing Program 5.5.15 Battery Monitoring and Maintenance Program

,, 5.6 Reporting Requirements 5.6.1 Not Used 5.6.2 Annual Radiological Environmental Operating Report 5.6.3 Radioactive Effluent Release Report 5.6.4 Not Used 5.6.5 CORE OPERATING LIMITS REPORT (COLR) 5.6.6 Post Accident Monitoring Report

>5.6.7 Steam Generator Tube Inspection Report R~ (X' ,A r Indian Point 2 iv Amendment No. 251

Indian Point Energy Center, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Training and Qualification, and Safeguards Contingency Plan, Revision 0," and was submitted by letter dated October 14, 2004, as supplemented by letter dated May 18, 2006.

Deleted per Amdt. 133, 7-6-88.

J. Deleted per Amdt. 133, 7-6-88.

K. ENO shall implement and maintain in effect all provisions of the NRC-approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluations Reports dated November 30, 1977, February 3, 1978, January 31, 1979, October 31, 1980, August 22, 1983, March 30, 1984, October 16, 1984, September 16, 1985, November 13, 1985, March 4, 1987, January 12, 1989, and March 26, 1996. ENO may make changes to the NRC-approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

L. Deleted per Amendment 238 M. Deleted per Amendment 238

3. On the closing date of the transfer of the license, Con Edison shall transfer to ENIP2 all of the accumulated decommissioning trust funds for IP2 and such additional funds to be deposited in the decommissioning trusts for IP2 such that the total amount transferred for Indian Point Nuclear Generating Unit No. 1 (IP1) and IP2 is no less than

$430,000,000. Furthermore, ENIP2 shall either (a) establish a provisional trust for decommissioning funding assurance for IP1 and IP2 in an amount no less than $25,000,000 (to be updated as required under applicable NRC regulations, unless otherwise approved by the NRC) or (b) obtain a surety bond for an amount no less than $25,000,000 (to be updated as required under applicable NRC regulations, unless otherwise approved by the NRC). The total decommissioning funding assurance provi ed for IP2 b e combination o the decommissioning trust and the provisionarustand r surety bond at the time of transfer of the licenses shall be at a level no less than the amounts calculated pursuant to, and required under, 10 CFR 50.75. The decommissioning trust, provisional trust, and surety bond shall be subject to or be consistent with the following requirements, as applicable:

Revised by letter dated December 21, 2006