NL-03-2200, Technical Specification Report 1-2003-1 Number of Steam Generator Tubes Plugged During 1R11

From kanterella
(Redirected from NL-03-2200)
Jump to navigation Jump to search
Technical Specification Report 1-2003-1 Number of Steam Generator Tubes Plugged During 1R11
ML033030404
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/27/2003
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-2200
Download: ML033030404 (1)


Text

Jeffrey T. Gasser Southern Nuclear Vce President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN A October 27, 2003 COMPANY Energy to Serve YourWorld' Docket No.: 50424 NL-03-2200 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Technical Specification Report 1-2003-1 Number of Steam Generator Tubes Plugged During IRI 1 Ladies and Gentlemen:

In accordance with the requirements of Vogtle Electric Generating Plant Technical Specification 5.6.10, Southern Nuclear Operating Company submits this report of the number of steam generator (SG) tubes plugged during the Unit 1 eleventh maintenance/refueling outage (IRI 1).

As a result of the SG tube inservice inspections completed on October 14, 2003, a total of three (3) tubes were plugged in SG No. 3.

This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely, 1'&,-

Jeffr yT Gasser JTG/TEW/DRG cc: Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogde Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle A, cI7