Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.2.00.01e (Index Number 744)
ML19290H553
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/17/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ITAAC 3.2.00.01e, ND-19-1259
Download: ML19290H553 (6)


Text

Michael J. Yox 7825 River Road itk. Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tel OCT 1 7 2019 Docket Nos.: 52-026 ND-19-1259 10 CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 3.2.00.01 e [Index Number 7441 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of October 11, 2019, Vogtle Electric Generating Plant(VEGP) Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.2.00.01e [Index Number 744] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI-08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed.

All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted, MichaelJ. Yox ^ ^

Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 4 Completion Plan for Uncompleted ITAAC 3.2.00.01 e [Index Number 744]

MJY/SBB/sfr

U.S. Nuclear Regulatory Commission ND-19-1259 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Requlatorv Commission Mr. W. Jones (w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Mr. S. Smith Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-19-1259 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Gorletti Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-19-1259 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-1259 Enclosure Vogtle Electric Generating Riant(VEGP) Unit 4 Completion Plan for Uncompleted ITAAC 3.2.00.01e[Index Number 744]

U.S. Nuclear Regulatory Commission ND-19-1259 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

1. The HFE verification and validation program is performed in accordance with the HFE verification and validation implementation plan and includes the following activities:

e) Plant HFE/HSI (as designed at the time of plant startup) verification I nspections/Tests/Analvses e) An evaluation of the implementation of the plant HFE/HSI (as designed at the time of plant startup) verification will be performed.

Acceptance Criteria e) A report exists and concludes that: The plant HFE/HSI, as designed at the time of plant startup, is consistent with the HFE/HSI verified in l.a) through l.d).

ITAAC Completion Description Multiple ITAAC are performed to verify that the Human Factors Engineering (HFE)verification and validation program, as described in VEGP 3&4 Updated Final Safety Analysis Report, Section 18.11, Human Factors Engineering Verification and Validation (Reference 1), is performed in accordance with the HFE verification and validation implementation plan. The subject IT/\AC requires that an evaluation of the implementation of the plant HFE/Human-System Interface (HFE/HSI)(as designed at the time of plant startup, is consistent with the HFE/HSI verified in l.a) through l.d)(IT/\AC 3.2.00.01a through 3.2.00.01d, References 2-6).

An evaluation is performed in accordance with the API000 Plant Startup Human Factors Engineering Design Verification Plan (Reference 7), to demonstrate that the plant HFE/HSI design at the time of plant startup conforms to the human factors principles and guidance as specified in APP-OCS-GBH-001 "API000 Human Factors Engineering Program Plan" (Reference 8). The results of the evaluation are documented in the API000 Plant Startup Human Factors Engineering Design Verification Report (Reference 9).

The API000 Plant Startup Human Factors Engineering Design Verification Report exists and concludes that the plant HFE/HSI, as designed at the time of plant startup, is consistent with the HFE/HSI verified in l.a) through l.d),(ITAAC 3.2.00.01a through 3.2.00.01 d). This report is available for NRG inspection as part of the ITAAC Completion Package (Reference 10),

List of ITAAC Findings In accordance with plant procedures for IT/\AC completion. Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant IT/VAC findings associated with this ITAAC.

U.S. Nuclear Regulatory Commission ND-19-1259 Enclosure Page 3 of 3 References(available for NRG inspection)

1. VEGP 3&4 Updated Final Safety Analysis Report, Section 18.11, Human Factors Engineering Verification and Validation
2. ITAAC 3.2.00.01a ITAAC Closure Letter
3. ITAAC 3.2.00.01b ITAAC Closure Letter
4. ITAAC 3.2.00.01 c.i ITAAC Closure Letter
5. ITAAC 3.2.00.01 c.ii ITAAC Closure Letter
6. ITAAC 3.2.00.01 d ITAAC Closure Letter
7. APP-OCS-GEH-520, API000 Plant Startup Human Factors Engineering Design Verification Plan
8. APP-OCS-GBH-001, API000 Human Factors Engineering Program Plan
9. APP-OCS-GER-520, API000 Plant Startup Human Factors Engineering Design Verification Report
10. ITAAC 3.2.00.01 e Completion Package
11. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"