ND-19-1030, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.09.05a (Index Number 644)

From kanterella
Jump to navigation Jump to search
Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.09.05a (Index Number 644)
ML19249B862
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/06/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-19-1030
Download: ML19249B862 (7)


Text

Michael J. Yox 7825 River Road Regulatory Affairs Director

^Southern Nuclear Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tei SEP 0 6 2019 Docket Nos.: 52-025 52-026 ND-19-1030 10CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.6.09.05a [Index Number 6441 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of September 3, 2019, Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.09.05a

[Index Number 644] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted YyM Michael J. Yox' Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 & Unit 4 Completion Plan for Uncompleted ITAAC 2.6.09.05a [Index Number 644]

MJY/RLB/sfr

U.S. Nuclear Regulatory Commission ND-19-1030 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. P. P. Sena III (w/o enclosures)

Mr. D. L. McKinney(w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. G. Chick Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W.Jones(w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Oaiethoroe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municioai Eiectric Authoritv of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

U.S. Nuclear Regulatory Commission ND-19-1030 Page 3 of 3 Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani(w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-19-1030 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-19-1030 Enclosure Vogtle Electric Generating Plant(VEGP)Unit 3& Unit 4 Completion Plan for Uncompleted ITAAC 2.6.09.05a [Index Number 644]

U.S. Nuclear Regulatory Commission ND-19-1030 Enclosure Page 2 of 4 ITAAC Statement Desion Commitment 5.a) Security alarm annunciation and video assessment information is displayed concurrently in the central alarm station and the secondary alarm station, and the video image recording with real time playback capability can provide assessment of activities before and after each alarm annunciation within the perimeter area barrier.

15.b) Intrusion detection and assessment systems concurrently provide visual displays and audible annunciation of alarms in the central and secondary alarm stations.

Inspections/Tests/Analvses Test, inspection, or a combination of test and inspections of the installed systems will be performed.

Tests will be performed on intrusion detection and assessment equipment.

Acceptance Criteria Security alarm annunciation and video assessment information is displayed concurrently in the central alarm station and the secondary alarm station, and the video image recording with real time playback capability provides assessment of activities before and after alarm annunciation within the perimeter barrier.

The intrusion detection system concurrently provides visual displays and audible annunciations of alarms in both the central and secondary alarm stations.

ITAAC Completion Description Testing of the perimeter area barrier security alarm annunciation and video assessment systems is performed to verify that the security alarm annunciation and video assessment information is displayed concurrently in the Central Alarm Station (CAS)and the Secondary Alarm Station (SAS), and the video image recording with real time playback capability provides assessment of activities before and after alarm annunciation within the perimeter barrier.

Testing also verifies that the intrusion detection system provides concurrent visual displays and audible annunciations of intrusion detection alarms in both the CAS and SAS. The VEGP Unit 3 (Unit 4) Plant Security System ITAACs only cover the Unit 3(Unit 4) plant security system design commitment scope. The CAS and SAS are common to both VEGP Unit 3 and Unit 4.

Securitv alarm annunciation and video assessment information is disolaved concurrentiv in the central alarm station and the secondary alarm station, and the video imaoe recording with real time plavback caoabilitv provides assessment of activities before and after alarm annunciation within the perimeter barrier.

Tests are performed per Procedure XXX (Reference 1)to verify that Unit 3(Unit 4)intrusion detection system perimeter area barrier alarms result in concurrent displays of security alarm annunciation and video assessment information in both the CAS and SAS, video image recording with real time playback capability provides assessment of activities before and after alarm annunciation within the perimeter barrier, and satisfy the applicable alarm annunciation

U.S. Nuclear Regulatory Commission ND-19-1030 Enclosure Page 3 of 4 and video assessment requirements of tfie VEGP Units 3 and 4 Physical Security Plan associated with 10 CFR 73.55(i) and 10 CFR 73.55(e)(7)(i)(C).

Procedure XXX tests each segment of the Unit 3(Unit 4) protected area perimeter intrusion detection system by crossing or disturbing the zone of detection and confirming that concurrent displays of the security alarm annunciation and video assessment information are observed in both the CAS and SAS. Procedure XXX then confirms that for each perimeter barrier intrusion detection system alarm the security video assessment system provides video image recording with real-time display of video images to provide post-alarm activity assessment and playback of recorded video images for pre-alarm activity assessment to both CAS and SAS.

The test results are documented in Reference 1 and verify that the Unit 3(Unit 4)security alarm annunciation and video assessment information is displayed concurrently in the central alarm station and the secondary alarm station, and the video image recording with real time playback capability provides assessment of activities before and after alarm annunciation within the perimeter barrier.

The intrusion detection svstem concurrentiv orovides visual disolavs and audible annunciations of alarms in both the central and secondarv alarm stations.

Testing is performed per Procedure YYY (Reference 2)to verify that Unit 3(Unit 4)intrusion detection system alarms provide concurrent visual displays and audible annunciations of the alarms in both the CAS and SAS, and satisfy the applicable intrusion detection alarm requirements of the VEGP Units 3 and 4 Physical Security Plan associated with 10 CFR 73.55(i).

Procedure YYY tests the Unit 3(Unit 4) intrusion detection system by initiating a security alarm signal for each intrusion detection device identified in the Vogtle Plant Security System Database (Reference 3)and confirming that, for each alarm signal, a concurrent visual display and audible annunciation of the alarm is observed in both CAS and SAS.

The test results are documented in Reference 2 and verify that the Unit 3(Unit 4)intrusion detection system concurrently provides visual displays and audible annunciations of alarms in both the CAS and SAS.

Reference 2 is available for NRC inspection as part of the Unit 3(Unit 4)ITAAC 2.6.09.05a Completion Package (Reference 4[5]).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

U.S. Nuclear Regulatory Commission ND-19-1030 Enclosure Page 4 of 4 References ^available for NRG Inspection)

1. Procedure XXX, Unit 3(Unit 4) CAS/SAS Alarm Annunciation and Video Assessment Test
2. Procedure YYY, Unit 3(Unit 4) CAS/SAS Intrusion Detection System Alarm Annunciation and Visual Display Test
3. SVO-SES-JOX-800000, Vogtle Plant Security System Database(SRI)
4. 2.6.09.05a-U3-CP-Rev0, ITAAC Completion Package
5. 2.6.09.05a-U4-CP-Rev0, ITAAC Completion Package
6. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"