MNS-18-023, Cycle 26, Revision 1 Core Operating Limits Report

From kanterella
Jump to navigation Jump to search
Cycle 26, Revision 1 Core Operating Limits Report
ML18099A064
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 03/31/2018
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18099A039 List:
References
MCC-1553 .05-00-0644, Rev 1, MNS-18-023 MCEI-0400-349, Rev 1
Download: ML18099A064 (31)


Text

MCEI-0400-349 Page 1 Revision 1 McGuire Unit 1 Cycle 26 Core Operating Limits Report Revision 1 March 2018 Calculation Number: MCC-1553 .05-00-0644, Revision 1 Duke Energy Carolinas, LLC QA Condition 1 The information presented in this report has been prepared and issued in accordance with McGuire Technical Specification 5.6.5.

y '

MCEI-0400-349 Page2 Revisi.on 1 McGuire 1 Cycle 26 Core Operating Limits Report Implementation Instructions For Revision 1 Revision Description and CR Tracking Revision O of the McGuire Unit 1 Cycle 26 .COLR contains limits specific to the reload core.

Revision 1 of the McGuire Unit 1 Cycle 26 COLR is issued to adjust the burnup dependent minimum required CLA boron concentration for bumups > 200 EFPD. The revised values reflect the actual Cycle N-1 shutdown conditions, as opposed to applying an assumed shutdown window.

Revision 1 is being issued in accordance with NCR 02190882.

The power distribution monitoring factors from Appendix A of Revision O remain valid and are not transmitted as part of Revision 1.

Implementation Schedule The McGuire Unit 1 Cycle 26 COLR requires the reload 50.59 (AR #02147708) be approved prior to implementation and fuel loading.

Revision 1 to the McGuire Unit 1 Cycle 26 COLR is effective upon receipt.

The McGuire Unit 1 Cycle 26 COLR will cease to be effective during No MODE between cycles 26 and 27.

Data Files to be Implemented No data files are transmitted as part of this document.

MCEI-0400-349 Page 3 Revision 1 McGuire 1 Cycle 26 Core Operating Limits Report REVISION LOG Revision Effective Date Pages Affected COLR 0 September 2017 1-31, Appendix A* M1C26 COLR, Rev. 0 1 March2018 1-3, 25 M1C26 COLR, Rev. 1

  • Appendix A contains power distribution monitoring factors used in Technical Specification Surveillance. Appendix A is included only in the electronic COLR copy sent to the NRC.

MCEI-0400-349 Page4 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 1.0 Core Operating Limits Report This Core Operating Limits Report (COLR) has been prepared in accordance with the requirements of Technical Specification 5.6.5. The Technical Specifications that reference this report are listed below along with the NRC approved analytical methods used to develop and/or determine COLR parameters in Technical Specifications.

NRC Approved TS COLR Methodology (Section Number Technical Specifications COLR Parameter Section 1.1 Number) 2.1.1 Reactor Core Safety Limits RCS Temperature and Pressure 2.1 6,7 ,8,9 ,10,12,15,16,18, Safety Limits 19 3.1.1 Shutdown Margin Shutdown Margin 2.2 6,7,8,12, 14, 15, 16, 18, 19 3.1.3 Moderator Temperature Coefficient MTC 2.3 6,7,8, 14,16, 17 3.1.4 Rod Group Alignment Limits Shutdown Margin 2.2 6, 7,8, 12, 14, 15, 16, 18, 19 3.1.5 Shutdown Bank Insertion Limits Shutdown Margin 2.2 2,4,6,7,8,9,10, 12,14,15, Shutdown Bank Insertion Limit 2.4 16,18,19 3.1.6 Control Bank Insertion Limits Shutdown Margin 2.2 2,4,6,7,8,9,10, 12,14,15, Control Bank Insertion Limit 2.5 16,18,19 3.1.8 Physics Tests Exceptions Shutdown Margin 2.2 6,7,8,12, 14, 15, 16,18, 19 3.2.1 Heat Flux Hot Channel Factor Fq 2.6 2,4,6,7 ,8,9,10, 12, 15, 16, AFD 2.6 18,19 OTL'iT 2.9 Penalty Factors 2.6 3.2.2 Nuclear Enthalpy Rise Hot Channel FL'iH 2.7 2,4,6,7,8,9,10,l2,15,l6, Factor Penalty Factors 2.7 18,19 3.2.3 Axial Flux Difference AFD 2.8 2,4,6,7,8,15,16 3.3.1 Reactor Trip System Instrumentation OTL'iT 2.9 6,7,8,9, 10, 12, 15,16, 18, Setpoints OPL'iT 2.9 19 3.4.1 RCS Pressure, Temperature, and RCS Pressure, Temperature and 2.10 6,7,8,9,10, 12, 18,19 Flow DNB limits Flow 3.5.1 Accumulators Max and Min Boron Cone. 2.11 6,7,8,14,16 3.5.4 Refueling Water Storage Tank Max and Min Boron Cone. 2.12 6,7,8,14,16 3.7.14 Spent Fuel Pool Boron Concentration Min Boron Concentration 2.13 6,7,8,14,16 3.9.1 Refueling Operations - Boron Min Boron Concentration 2.14 6,7,8,14,16 Concentration 5.6.5 Core Operating Limits Report Analytical Methods 1.1 None (COLR)

The Selected Licensee Commitments that reference this report are listed below:

COLR NRC Approved SLC Methodology Selected Licensing Commitment COLR Parameter Section Number (Section 1.1 Number) 16.9.14 Borated Water Source- Shutdown Borated Water Volume and 2.15 6,7,8,14,16 Cone. for BAT/RWST 16.9.11 Borated Water Source- Operating Borated Water Volume and 2.16 6,7,8,14,16 Cone. for BAT/RWST 16.9.7 Standby Shutdown System Standby Makeup Pump Water 2.17 6,7,8,14,16 Supply

MCEI-0400-349 Page 5 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 1.1 Analytical Methods The analytical methods used to determine core operating limits for parameters identified in Technical Specifications and previously reviewed and approved by the NRC as specified in Technical Specification 5.6.5 are as follows.

1. WCAP-9272-P-A, "Westinghouse Reload Safety Evalu11tion Methodology," (F_ Proprietary).

Revision 0 Report Date: July 1985 Not Used

2. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model using the NOTRUMP Code," (F_ Proprietary).

Revision 0 Report Date: August 1985 Addendum 2, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," (F_

Proprietary). (Referenced in Duke Letter DPC-06-101)

Revision 1 Report Date: July 1997

3. WCAP-10266-P-A, "The 1981 Version Of Westinghouse Evaluation Model Using BASH Code",

(W Proprietary).

Revision2 Report Date: March 1987 Not Used

4. WCAP-12945-P-A, Volume 1 and Volumes 2-5, "Code Qualification Document for Best-Estimate Loss of Coolant Analysis," (F_ Proprietary).

Revision: Volume 1 (Revision 2) and Volumes 2-5 (Revision 1)

Report Date: March 1998

5. BAW-10168P-A, "B&W Loss-of-Coolant Accident Evaluation Model for Recirculating Steam Generator Plants," (B&W Proprietary).

Revision 1 SER Date: January 22, 1991 Revision 2 SER Dates: August 22, 1996 and November 26, 1996 Revision 3 SER Date: June 15, 1994 Not Used

MCEI-0400-349 Page 6 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 1.1 Analytical Methods (continued)

6. DPC-NE-3000-PA, "Thermal-Hydraulic Transient Analysis Methodology," (DPC Proprietary).

Revision Sa Report Date: October 2012 *

7. DPC-NE-3001-PA, "Multidimensional Reactor Transients and Safety Analysis Physics Parameter Methodology," (DPC Proprietary).

Revision 1 Report Date: March 2015

8. DPC-NE-3002-A, "UFSAR Chapter 15 System Transient Analysis Methodology".

Revision 4b Report Date: September 2010

9. DPC-NE-2004P-A, '-'Duke Power Company McGuire and Catawba Nuclear Stations Core Thermal-Hydraulic Methodology using VIPRE-01," (DPC Proprietary).

Revision 2a Report Date: December 2008

10. DPC-NE-2005P-A, "Thermal Hydraulic Statistical Core Design Methodology," (DPC Proprietary).

Revision 5 Report Date: March 2016

11. DPC-NE-2008P-A, "Fuel Mechanical Reload Analysis Methodology Using TAC03," (DPC Proprietary).

Revision 0 Report Date: April 3, 1995 Not Used

12. DPC-NE-2009-P-A, "Westinghouse Fuel Transition Report," (DPC Proprietary).

Revision 3c Report Date: March 2017

13. DPC-NE-1004A, "Nuclear Design Methodology Using CASM0-3/SIMULATE-3P."

Revision la Report Date: January 2009 Not Used

MCEI-0400-349 Page 7 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 1.1 Analytical Methods (continued)

14. DPC-NF-2010-A, "Duke Power Company McGuire Nuclear Station Catawba Nuclear Station Nuclear Physics Methodology for Reload Design."

Revision 2a Report Date: December 2009

15. DPC-NE-2011-PA, "Duke Power Company Nuclear Design Methodology Report for Core Operating Limits of Westinghouse Reactors," (DPC Proprietary).

Revision la Report Date: June 2009

16. DPC-NE-1005-PA, "Nuclear Design Methodology Using CASM0-4 / SIMULATE-3 MOX,"

(DPC Proprietary).

Revision 1 Report Date: November 12, 2008

17. DPC-NE-1007-P A, "Conditional Exemption of the EOC MTC Measurement Methodology,"

(DPC and W Proprietary)

Revision 0 Report Date: April 2015

18. WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report," (W Proprietary).

Revision 0 Report Date: April 1995

19. WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO'," (W Proprietary).

Revision 0 Report Date: July 2006

MCEI-0400-349 Page 8 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.0 Operating Limits Cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Section 1.1.

2.1 Reactor Core Safety Limits (TS 2.1.1) 2.1.1 The Reactor Core Safety Limits are shown in Figure 1.

2.2 Shutdown Margin - SDM (TS 3.1.1, TS 3.1.4, TS 3.1.5, TS 3.1.6 and TS 3.1.8) 2.2.1 For TS 3.1.1, SDM shall be:::: 1.3% Af(/I( in MODE 2 with k-eff < 1.0 and in MODES 3 and 4.

2.2.2 For TS 3.1.1, SDM shall be:::: 1.0% Af(/I( in MODE 5.

2.2.3 For TS 3.1.4, SDM shall be:::: 1.3% Af(JK in MODES 1 and MODE 2.

2.2.4 For TS 3.1.5, SDM shall be~ 1.3% Af(/I( in MODE 1 and MODE 2 with any control bank not fully inserted.

2.2.5 For TS 3.1.6, SDM shall be:::: 1.3% Af(/I( in MODE 1 and MODE 2 with K-eff::::_

1.0.

2.2.6 For TS 3 .1.8, SDM shall be:::: 1.3% Af(/I( in MODE 2 during PHYSICS TESTS.

MCEI-0400-349 Page 9 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Figure 1 Reactor Core Safety Limits Four Loops in Operation 670 DO NOT OPERATE IN THIS AREA 660

~ 630 bl)

~

ti)

~ 620 610 ACCEPTABLE OPERATION 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Fraction of Rated Thermal Power

MCEI-0400-349 Page 10 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.3 Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.3.1 The Moderator Temperature Coefficient (MTC) Limits are:

MTC shall be less positive than the upper limits shown in Figure 2. BOC, ARO, HZP MTC shall be less positive than 0.7E-04 ~K/K/°F.

EOC, ARO, RTP MTC shall be less negative than the -4.3E-04 Af(/K/°F lower MTC limit.

2.3.2 300 PPM MTC Surveillance Limit is:

Measured 300 PPM ARO, equilibrium RTP MTC shall be less negative than or equal to -3.65E-04 ~K/K/°F.

2.3.3 The Revised Predicted near-EOC 300 PPM ARO RTP MTC shall be calculated using the procedure contained in DPC-NE-1007-PA.

If the Revised Predicted MTC is less negative than or equal to the 300 PPM SR 3.1.3.2 Surveillance Limit, and all benchmark data contained in the surveillance procedure is satisfied, then a MTC measurement in accordance with SR 3.1.3.2 is not required to be performed.

2.3.4 60 PPM MTC Surveillance Limit is:

Measured 60 PPM ARO, equilibrium RTP MTC shall be less negative than or equal to -4.125E-04 ~ ° F .

Where: BOC = Beginning of Cycle (bumup corresponding to the most positive MTC)

EOC = End of Cycle ARO = All Rods Out HZP = Hot Zero Power RTP = Rated Thermal Power PPM = Parts per million (Boron) 2.4 Shutdown Bank Insertion Limit (TS 3.1.5) 2.4.1 Each shutdown bank shall be withdrawn to at least 222 steps. Shutdown banks are withdrawn in sequence and with no overlap.

2.5 Control Bank Insertion Limits (TS 3.1.6) 2.5.1 Control banks shall be within the insertion, sequence, and overlap limits shown in Figure 3. Specific control bank withdrawal and overlap limits as a function of the fully withdrawn position are shown in Table 1.

MCEI-0400-349 Page 11 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Figure 2 Moderator Temperature Coefficient Upper Limit Versus Power Level 1.0 0.9

  • Unacceptable Operation

...... 0.8

....=

~

CJ 0.7

=

=-

~

u~~ 0 0.6 i~

t <l 0.5 Acceptable Operation

=~

c.."""

~~

0.4 0.3

=C

i..

ell

i..

~

0.2

-= Q

~ 0.1 0.0 0 10 20 30 40 50 60 70 80 90 100 Percent of Rated Thermal Power NOTE: Compliance with Technical Specification 3.1.3 may require ro'd withdrawal limits.

Refer to OP/1/A/6100/22 Unit 1 Data Book for details.

MCEI-0400-349 Page 12 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Figure 3 Control Bank Insertion Limits Versus Percent Rated Thermal Power Fu 11yW1'thd r a ~ ~

(Maximum=231) 231 -

220 - - ~

/

,r

~ -

- - ~

/

/

-/

/

~ - -

/ /

/ /

200 Fully Withdra'wn ,r

'a' ControlBankB :

(Minimum=222) /

~ 180 ,r

,r

,r B-

/ 1 c100%, 161) F

i~

/

160 (0%, 163) 1

/

,r

,r

.,. ,r -

!. 140 ,r

,r ,r

~

,r

/

ControlBank C

/ /

S 120

,r /

/

.:,  ;,,r /

] 100 ,,. /

,r C / ,r V

] 80 / /

ControlBankD s"' /

/

V

/

.,. /

.:; 60 ,,

"C / /

~

i:i:; 40 =l (0%,47) I

_/

/

/

20

- jFully Inserted

/

/

~

(30%,0) 0 - /

0 10 20 30 40 50 60 70 80 90 100 Percent ofRated Thermal Power The Rod Insertion Limits (RIL) for Control Bank D (CD), Control Bank C (CC), and Control Bank B (CB) can be calculated by:

Bank CD RIL = 2.3(P)- 69 {30 < P < JOO}

Bank CC RIL = 2.3(P) +47 {O < P < 76.1} for CC RIL = 222 {76.1 < P < 100}

Bank CB RIL = 2.3(P) + 163 {O .SP < 25. 7) for CB RIL = 222 {25. 7 < P < 100}

where P = %Rated Thermal Power NOTE: Compliance with Technical Specification 3.1.3 may require rod withdrawal limits.

Refer to OP/1/A/6100/22 Unit 1 Data Book for details.

MCEI-0400-349 Page 13 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Table 1 RCCA Withdrawal Steps and Sequence Fully Withdrawn at 222 Steps Fully Withdrawn at 223 Steps Control Control Control Control Control Control Control Control Bank A BankB BankC BankD Bank A BankB BankC BankD 0 Start 0 0 0 0 Start 0 0 0 116 0 Start 0 0 116 0 Start 0 0 222 Stop 106 0 0 223 Stop 107 0 0 222 116 0 Start 0 223 116 0 Start 0 222 222 Stop 106 0 223 223 Stop 107 0 222 222 116 0 Start 223 223 116 0 Start 222 222 222 Stop 106 223 223 223 Stop 107 Fully Withdrawn at 224 Steps Fully Withdrawn at 225 Steps Control Control Control Control Control Control Control Control Bank A BankB BankC BankD Bank A BankB BankC BankD 0 Start 0 0 0 0 Start 0 0 0 116 0 Start 0 0 116 0 Start 0 0 224 Stop 108 0 0 225 Stop 109 0 0 224 116 0 Start 0 225 116 0 Start 0 224 224 Stop 108 0 225 225 Stop 109 0 224 224 116 0 Start 225 225 116 0 Start 224 224 224 Stop 108 225 225 225 Stop 109 Fully Withdrawn at 226 Steps Fully Withdrawn at 227 Steps Control Control Control Control Control Control Control Control Bank A BankB BankC BankD Bank A BankB BankC BankD 0 Start 0 0 0 0 Start 0 0 0 116 0 Start 0 0 116 0 Start 0 0 226 Stop 110 0 0 227 Stop 111 0 0 226 116 0 Start 0 227 116 0 Start 0 226 226 Stop 110 0 227 227 Stop 111 0 226 226 116 0 Start 227 227 116 0 Start 226 226 226 Stop 110 227 227 227 Stop 111 Fully Withdrawn at 228 Steps Fully Withdrawn at 229 Steps Control Control Control Control Control Control Control Control Bank A BankB BankC BankD Bank A BankB BankC BankD 0 Start 0 0 0 0 Start 0 0 0 116 0 Start 0 0 116 0 Start 0 0 228 Stop 112 0 0 229 Stop 113 0 0 228 116 0 Start 0 229 116 0 Start 0 228 228 Stop 112 0 229 229 Stop 113 0 228 228 116 0 Start 229 229 116 0 Start 228 228 228 Stop 112 229 229 229 Stop 113 Fully Withdrawn at 230 Steps Fully Withdrawn at 231 Steps Control Control Control Control Control Control Control Control Bank A BankB BankC BankD Bank A BankB Banke BankD 0 Start 0 0 0 0 Start 0 0 0 116 0 Start 0 0 116 0 Start 0 0 230 Stop 114 0 0 231 Stop 115 0 0 230 116 0 Start 0 231 116 0 Start 0 230 230 Stop 114 0 231 231 Stop 115 0 230 230 116 0 Start 231 231 116 0 Start 230 230 230 Stop 114 231 231 231 Stop 115

MCEI-0400-349 Page 14 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.6 Heat Flux Hot Channel Factor - FQ(X,Y,Z) (TS 3.2.1) 2.6.1 FQ(X,Y,Z) steady-state limits are defmed by the following relationships:

F ~TP *K(Z)IP forP > 0.5 p~TP *K(Z)/0.5 for P :S 0.5 where, P = (Thermal Power)/(Rated Power)

Note: The measured FQ(X,Y,Z) shall be increased by 3% to account for manufacturing tolerances and 5% to account for measurement uncertainty when comparing against the LCO limits. The manufacturing tolerance and measurement uncertainty are implicitly included in the FQ surveillance limits as defined in Sections 2.6.5 and 2.6.6.

2.6.2 p~TP = 2.70 x K(BU) 2.6.3 K(Z) is the normalized FQ(X,Y,Z) as a function of core height. The K(Z) function for Westinghouse RFA fuel is provided in Figure 4.

2.6.4 K(BU) is the normalized FQ(X,Y,Z) as a function of bumup. F ~TP with the K(BU) penalty for Westinghouse RFA fuel is analytically confirmed in cycle-specific reload calculations. K(BU) is set to 1.0 at all bumups.

The following parameters are required for core monitoring per the Surveillance Requirements of Technical Specification 3 .2.1:

L F~(X,Y,Z)

  • M 0(X,Y,Z) 2.6.5 FQ(X,Y,Z)OP = UMT *MT* TILT where:

E'J (X,Y,Z)OP = Cycle qependent maximum allowable design peaking factor that ensures FQ(X,Y,Z) LOCA limit will be preserved for operation within the AFD, RIL, and QPTR limits.

FJ (X,Y,Z) 0 P includes allowances for calculation and measurement uncertainties.

Ft (X,Y,Z) = Design,power distribution for FQ. Ft (X,Y,Z) is provided in Appendix Table A-1 for normal operating conditions, and in Appendix Table A-4 for power escalation testing during initial startup operation.

MCEI-0400-349 Page 15 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report M0(X,Y,Z) = Margin remaining in core location X,Y,Z to the LOCA limit in the transient power distribution. M 0(X,Y,Z) is provided in Appendix Table A-1 for normal operating conditions and in Appendix Table A-4 for power escalation testing during initial startup operation.

UMT = Total Peak Measurement Uncertainty. (UMT = 1.05)

MT = Engineering Hot Channel Factor. (MT= 1.03)

TILT Peaking penalty to account for allowable quadrant power tilt ratio of 1.02. (TILT= 1.035)

L RPS F~(X,Y,Z)

  • Mc(X,Y,Z) 2.6.6 F0(X,Y,Z) =

UMT *MT* TILT where:

F~(X,Y,Z)RPS = Cycle dependent maximum allowable design peaking factor that ensures the Fo(X,Y,Z) Centerline Fuel Melt (CFM) limit is not exceeded for operation within the AFD, RIL, and QPTR limits. F~(X,Y,Z)RPS includes allowances for calculation and measurement uncertainties.

D F0(X,Y,Z) = Defined in Section 2.6.5.

Mc(X,Y,Z) = Margin remaining to the CFM limit in core location X,Y,Z from the transient power distribution. Mc(X,Y,Z) is provided in Appendix Table A-2 for normal operating conditions and in Appendix Table'A-5 for power escalation testing during initial

  • startup operation.

UMT = Defined in Section 2.6.5.

MT Defined in Section 2.6.5.

TILT Defined in Section 2.6.5.

MCEI-0400-349 Page 16 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.6.7 KSLOPE = 0.0725 where:

KSLOPE = Adjustment to Ki value from the OT.1T trip setpoint required to M L RPS compensate for each 1% that FQ (X,Y,Z) exceeds FQ (X,Y,Z) .

2.6.8 F Q(X,Y,Z) penalty factors for Technical Specification Surveillances 3 .2.1.2 and 3.2.1.3 are provided in Table 2.

MCEI-0400-349 Page 17 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Figure 4 K(Z), Normalized FQ(X,Y,Z) as a Function of Core Height for Westinghouse RFA Fuel 1.200 ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - ~

(0.0, 1.00) (4.0, 1.00) 1.000 ....- - - - - - - -..,

(12.0, 0.9259)

(4.0, 0.9259) 0.800

@: 0.600

~

0.400 Core Height {ft} K{Z}

0.0 1.0

,4.0 1.0 0.200

> 4.0 0.9259 12.0 0.9259 0.000 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Core Height (ft)

MCEI-0400-349 Page 18 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Table 2 FQ(X,Y,Z) and FAfI(X,Y) Penalty Factors For Technical Specification Surveillances 3.2.1.2, 3.2.1.3 and 3.2.2.2 Burnup FQ(X,Y,Z) Fm(X,Y)

(EFPD) Penalty Factor (o/o) Penalty Factor (%)

4 2.00 2.00 12 2.00 2.00 25 2.00 2.00 50 2.00 2.00 75 2.00 2.00 100 2.00 2.00 125 2.00 2.00 150 2.00 2.00 175 2.00 2.00 200 2.00 2.00 225 2.00 2.00 250 2.00 2.00 275 2.00 2.00 300 2.00 2.00 325 2.00 2.00 350 2.00 2.00 375 2.00 2.00 400 2.00 2.00 425 2.00 2.00 450 2.00 2.00 460 2.00 2.00 475 2.00 2.00 491 2.00 2.00 496 . 2.00 2.00 503 2.00 2.00 513 2.00 2.00 523 2.00 2.00 Note: Linear interpolation is adequate for intermediate cycle burnups. All cycle bumups outside of the range of the table shall use a 2% penalty factor for both FQ(X,Y,Z) and Fm(X,Y) for compliance with the Technical Specification Surveillances 3.2.1.2, 3.2.1.3 and 3.2.2.2.

MCEI-0400-349 Page 19 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.7 Nuclear Enthalpy Rise Hot Channel Factor - FAfI(X,Y) (TS 3.2.2)

F ~H steady-state limits referred to in Technical Specification 3.2.2 is defined by the following relationship.

2.7.1 F~(X, Y)LCO= MARP (X,Y) * [ 1.0 +Rill* (1.0 - P)J where:

F~ (X, Yfco is the steady-state, maximum allowed radial peak and includes allowances for calculation/measurement uncertainty.

MARP(X,Y) = Cycle-specific operating limit Maximum Allowable Radial Peaks. MARP(X,Y) radial peaking limits are provided in Table 3.

p Thermal Power Rated Thermal Power RRH = Thermal Power reduction required to compensate for each 1% the measured radial peak, F~ (X,Y), exceeds its limit.

(RRH = 3.34 (0.0 < P :S 1.0))

The following parameters are required for core monitoring per the surveillance requirements of Technical Specification 3.2.2.

L (X, Y) SURV F~H(X,Y)*M.H(X,Y) 2.7.2 FLlH = '-' '-'

UMR *TILT where:

SURV F~ (X,Y) = Cycle dependent maximum allowable design peaking factor that ensures the F LliX, Y) limit is not exceeded for operation SURV within the AFD, RIL, and QPTR limits. FlH (X,Y) includes allowances for calculation/measurement uncertainty.

MCEI-0400-349 Page 20 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report F~ (X,Y) = Design radial power distribution for FAf-I' F~ (X,Y) is provided in Appendix Table A-3 for normal operation and in Appendix Table A-6 for power escalation testing during initial startup operation.

MMI(X,Y) = Margin remaining in core location X,Y relative to the Operational DNB limits in the transient power distribution.

Mm (X,Y) is provided in Appendix Table A-3 for normal operation and in Appendix Table A-6 for power escalation testing during initial startup operation.

UMR = Uncertainty value for measured radial peaks (UMR = 1.0).

UMR is set to 1.0 since a factor of 1.04 is implicitly included in the variable Mm(X,Y).

TILT= Defined in Section 2.6.5 2.7.3 RRH is defined in Section 2.7.1.

2.7.4 TRH = 0.04 where:

TRH = Reduction in the OT~T K 1 setpoint required to compensate for each 1%

the measured radial peak, F: (X,Y) exceeds its limit.

2.7.5 FAfI (X,Y) penalty factors for Technical Specification Surveillance 3.2.2.2 are provided in Table 2.

2.8 Axial Fl~x Difference - AFD (TS 3.2.3) 2.8.1 The Axial Flux Difference (AFD) Limits are provided in Figure 5.

MCEI-0400-349 Page 21 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Table 3 Maximum Allowable Radial Peaks (MARPS)

RF A Fuel MARPS 100% .Full Power Core Axial Peak Ht (ft.) 1.05 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.1 3.0 3.25 0.12 1.8092 1.8553 1.9248 1.9146 1.9179 2.0621 2.0498 2.0090 1.9333 1.8625 1.7780 1.3151 1.2461 1.2 1.8102 1.8540 1.9248 1.9146 1.9179 2.1073 2.0191 1.9775 1.9009 1.8306 1.7852 1.3007 1.2235 2.4 1.8093 1.8525 1.9312 1.9146 1.9179 2.0735 1.9953 1.9519 1.8760 1.8054 1.7320 1.4633 1.4616 3.6 1.8098 1.8514 1.9204 1.9146 1.9179 2.0495 1.9656 1.9258 1.8524 1.7855 1.6996 1.4675 1.3874 4.8 1.8097 1.8514 1.9058 1.9146 1.9179 2.0059 1.9441 1.9233 1.8538 1.7836 1.6714 1.2987 1.2579 6.0 1.8097 1.8514 1.8921 1.9212 1.9179 1.9336 1.8798 1.8625 1.8024 1.7472 1.6705 1.3293 1.2602 7.2 1.8070 1.8438 1.8716 1.8930 1.8872 1.8723 1.8094 1.7866 1.7332 1.6812 1.5982 1.2871 1.2195 8.4 1.8073 1.8319 1.8452 1.8571 1.8156 1.7950 1.7359 1.7089 1.6544 1.6010 1.5127 1.2182 1.1578 9.6 1.8072 1.8102 1.8093 1.7913 1.7375 1.7182 1.6572 1.6347 1.5808 1.5301 1.4444 1.1431 1.0914 10.8 1.7980 1.7868 1.7611 1.7163 1.6538 1.6315 1.5743 1.5573 1.5088 1.4624 1.3832 1.1009 1.0470 11.4 1.7892 1.7652 1.7250 1.6645 1.6057 1.5826 1.5289 1.5098 1.4637 1.4218 1.3458 1.0670 1.0142

MCEI-0400-349 Page 22 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Figure 5 Percent of Rated Thermal Power Versus Percent Axial Flux Difference Limits

(-18, 100) (+10, 100) 90 Unacceptable Operation Unacceptable Operation 80 Acceptable Operation 70 60 50

(-36, 50) (+21, 50) 40 30 20 10

-50 -40 -30 -20 -10 0 10 20 30 40 50 Axial Flux Difference (% Delta I)

NOTE: Compliance with Technical Specification 3.2.l may require more restrictive AFD limits. Refer to OP/1/A/6100/22 Unit 1 Data Book for more details.

MCEI-0400-349 Page 23 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.9 Reactor Trip System Instrumentation Setpoints (TS 3.3.1) Table 3.3.1-1 2.9.1 Overtemperature AT Setpoint Parameter Values Parameter Nominal Tavg at RTP T' :'.:: 585.1 °F Nominal RCS Operating Pressure P' = 2235 psig Overtemperature L1T reactor trip setpoint Kl:::: 1.1978 Overtemperature L1T reactor trip heatup setpoint K2 = 0.0334IOF penalty coefficient Overtemperature L1T reactor trip depressurization K3 = 0.001601/psi setpoint penalty coefficient Time constants utilized in the lead-lag compensator 11 ::: 8 sec.

for L1T 12:::: 3 sec.

Time constant utilized in the lag compensator for L1T 13:::: 2 sec.

Time constants utilized in the lead-lag compensator 14::: 28 sec.

for Tavg 15 :s_ 4 sec.

Time constant utilized in the measured T avg lag 16 ::::2 sec.

compensator f1 (Af) "positive" breakpoint = 19.0 %Af f1 (L1I) "negative" breakpoint =NIA*

f1 (L1I) "positive" slope = 1.769 %L1Tol %Af f1 (L1I) "negative" slope =NIA*

  • f1 (t.I) negative breakpoints and slopes for OT.t.T are less restrictive than the OP.t.T fi{Af) negative breakpoint and slope. Therefore, during a transient which challenges the negative imbalance limits, OPL'i.T f2 (Af) limits will result in a reactor trip before OT.t.T f1 (Af) limits are reached. This makes implementation of an OTL'i.T f1 (ti.I) negative breakpoint and slope unnecessary.

MCEI-0400-349 Page 24 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.9.2 Overpower AT Setpoint Parameter Values Parameter Nominal Tavg at RTP T" :'.S 585.1 °P Overpower AT reactor trip setpoint l<4 :'.S 1.0864 Overpower AT reactor trip Penalty Ks= 0.02 / 0 P for increasing Tavg Ks= 0.00 I 0 P for decreasing Tavg Overpower AT reactor trip heatup K6 = 0.001179/0 P for T > T" setpoint penalty coefficient K6 = 0.0 for T :'.ST" Time constants utilized in the lead- , 1 ::::_ 8 sec.

lag compensator for AT ,2  :'.S 3 sec.

Time constant utilized in the lag

  • 3 :'.S 2 sec.

compensator for AT Time constant utilized in the *6  :'.S 2 sec.

measured T avg lag compensator Time constant utilized in the rate-lag , 7 ::::_ 5 sec.

controller for T avg fi(AI) "positive" breakpoint = 35.0 %AI fi(AI) "negative" breakpoint = -35.0 %AI fi(AI) "positive" slope = 7.0 %ATof %AI fi(AI) "negative" slope = 7.0 %ATof %AI

MCEI-0400-349 Page 25 Revision 1 McGuire 1 Cycle 26 Core Operating Limits Report 2.10 RCS Pressure, Temperature and Flow Limits for DNB (TS 3.4.1) 2.10.1 RCS pressure, temperature and flow limits for DNB are shown in Table 4.

2.11 Accumulators (TS 3.5.1) 2.11.1 Boron concentration limits during MODES 1 and 2, and MODE 3 with RCS pressure > 1000 psi:

Parameter Applicable Bumup Limit Accumulator minimum boron concentration. 0-200 EFPD 2,475 ppm Accumulator minimum boron concentration. 200.1 - 250 EFPD 2,475 ppm Ac~umulator minimum boron concentration. 250.1 - 300 EFPD 2,442 ppm Accumulator minimum boron concentration. 300.1 - 350 EFPD 2,321 ppm Accumulator minimum boron concentration. 350.1 - 400 EFPD 2,238 ppm Accumulator minimum boron concentration. 400.1 - 450 EFPD 2,164 ppm Accumulator minimum boron concentration. 450.1 - 496 EFPD 2,095 ppm Accumulator minimum boron concentration. 496.1 - 513 EFPD 2,026 ppm Accumulator minimum boron concentration. 513.1 - 523 EFPD 1,999 ppm Accumulator maximum boron concentration. 0 - 523 EFPD 2,875 ppm 2.12 Refueling Water Storage Tank- RWST (TS 3.5.4) 2.12.1 Boron concentration limits during MODES 1, 2, 3, and 4:

Parameter RWST minimum boron concentration. 2,675 ppm RWST maximum boron concentration. 2,875 ppm

MCEI-0400-349 Page 26 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Table 4 Reactor Coolant System DNB Parameters No. Operable Parameter Indication Channels Limits

1. Indicated RCS Average Temperature meter 4  :'.: 587.2 °F meter 3  :'.: 586.9 °F computer 4  :'.: 587.7 °F computer 3  :'.: 587.5 °F
2. Indicated Pressurizer Pressure meter 4 2: 2212.3 psig meter 3 2: 2215.0 psig computer 4 2: 2209 .1 psig computer 3 2: 2211.3 psig
3. RCS Total Flow Rate 2: 390,000 gpm*
  • Note: The RCS minimum coolant flow rate assumed in the licensing analyses for the M1C26 core is 388,000 gpm However, the flow is set at 390,000 gpm, which is conservative.

MCEI-0400-349 Page 27 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.13 Spent Fuel Pool Boron Concentration (TS 3.7.14) 2.13.1 Minimum boron concentration limit for the spent fuel pool. Applicable when fuel assemblies are stored in the spent fuel pool.

Parameter Spent fuel pool minimum boron concentration. 2,675 ppm 2.14 Refueling Operations - Boron Concentration (TS 3.9.1) 2.14.1 Minimum boron concentration limit for the filled portions of the Reactor Coolant System, refueling canal, and refueling cavity for MODE 6 conditions. The minimum boron concentration limit and plant refueling procedures ensure that core Keff remains within MODE 6 reactivity requirement ofKeff::: 0.95.

Parameter Minimum boron concentration of the Reactor Coolant 2,675 ppm System, the refueling canal, and the refueling cavity.

MCEI-0400-349 Page 28 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.15 Borated Water Source- Shutdown (SLC 16.9.14) 2.15.1 Volume and boron concentrations for the Boric Acid Tank (BAT) and the Refueling Water Storage Tank (RWST) during MODE 4 with any RCS cold leg temperature :S 300 °F and MODES 5 and 6.

Parameter Note: When cycle burnup is > 475 EFPD, Figure 6 may be used to determine required BAT minimum level.

BAT minimum contained borated water volume 10,599 gallons 13.6% Level BAT minimum boron concentration 7,150 ppm BAT minimum water volume required to 2,300 gallons maintain SDM at 7,150 ppm RWST minimum contained borated water 47,700 gallons volume 41 inches RWST minimum boron concentration 2,675 ppm RWST minimum water volume required to 8,200 gallons maintain SDM at 2,675 ppm L_

MCEI-0400-349 Page 29 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report 2.16 Borated Water Source- Operating (SLC 16.9.11) 2.16.1 Volume and boron concentrations for the Boric Acid Tank (BAT) and the Refueling Water Storage Tank (RWST) during MODES 1, 2, 3, and MODE 4 with all RCS cold leg temperature> 300 °F. *

  • Note: The SLC 16.9.11 applicability is down to Mode 4 temperatures of > 300°F. The minimum volumes calculated support cooldown to 200°F to satisfy UFSAR Chapter 9 requirements.
  • Parameter Note: When cycle burnup is > 475 EFPD, Figure 6 may be used to determine required BAT minimum level.

BAT minimum contained borated water volume 22,049 gallons 38.0% Level BAT minimum boron concentration 7,150 ppm BAT minimum water volume required to 13,750 gallons maintain SDM at 7,150 ppm RWST minimum contained borated water volume 96,607 gallons 103.6 inches RWST minimum boron concentration 2,675 ppm RWST maximum boron concentration (TS 3.5.4) 2,875 ppm RWST minimum water volume required to 57,107 gallons maintain SDM at 2,675 ppm 2.17 Standby Shutdown System - (SLC-16.9.7) 2.17 .1 Minimum boron concentration limit for the spent fuel pool required for Standby Makeup Pump Water Supply. Applicable for MODES 1, 2, and 3.

Parameter Spent fuel pool minimum boron concentration for TR 2,675 ppm 16.9.7.2.

MCEI-0400-349 Page 30 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Figure 6 Boric Acid Storage Tank Indicated Level Versus RCS Boron Concentration (Valid When Cycle Burnup is> 475 EFPD)

This figure includes additional volumes listed in SLC 16.9.14 and 16.9.11 4o.o ~-~I, -~l---i--1.~---~,-~----~-~----~-~-~

I I '

ii---1..

35.0 - I tt '

i I I

---~I RCS Boron Concentration BAT Level (ppm) 0 < 300

(%level) 37.0 30.0 -----i----:---.

I [

i 1---:--. -------'

I ,  : 1 300 < 500 500 < 700 33.0 28.0

-~--~-!-..

700 < 1000 ---23.()-

1000 < 1300 13.6 1300 8.7 Im -.---.!.----.--.----..i - *  !


~--------

~ i I i I 1---c,__--,-----11~-

I

]

Q 200

--+---il!--r, I I 1---I--A--c--c-e-p-ta_b,_l_e_ _,_ 1 I

E-<

j 15.0 i


t-----T---- I I r---

! I I i

I

~  !  ! l I I I II !I I I 10.0

- f ** I 1 --*- * ---1 I I

. *-1I*------ \-*--**--**-*

I Unacceptable Operation  : I 5.0 _ _ _ J___ +-- ---+----!-------------- *---  !----+--*---i--_j---J---~---- ----

11 ii;

  • 1! . I i . I I I 0.0 + - - - - - + - -. - - - +I - - + - - - ~ - - - + - - - - - + - - - + I - - - > - - - -! - - + -I- - + -I- - ~ -I- - - - I 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 RCS Boron Concentration (ppmb)
  • L______

MCEI-0400-349 Page 31 Revision 0 McGuire 1 Cycle 26 Core Operating Limits Report Appendix A Power Distribution Monitoring Factors Appendix A contains power distribution monitoring factors used in Technical Specification Surveillance. This data was generated in the McGuire 1 Cycle 26 Maneuvering Analysis calculation file, MCC-1553.05-00-0640. Due to the size of the monitoring factor data, Appendix A is controlled electronically within Duke and is not included in the Duke internal copies of the COLR. The Plant Nuclear Engineering Section will control this information via computer file(s) and should be contacted if there is a need to access this information.

Appendix A is included in the COLR copy transmitted to the NRC.