Cycle 18, Rev. 29, Core Operating Limits Report (COLR)
ML062340188
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/14/2006
From: Gordon Peterson
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
MCC-1553.05-00-0428, Rev 1 MCEI-0400-46, Rev 19
Download: ML062340188 (7)


Text

7,!

GARY R. PETERSON Vice President rEnergy McGuire Nuclear Station Duke Energy Corporation MGO]VP / 12700 Hagers Ferry Rd.

Huntersville, NC 28078 704 875 5333 704 875 4809 fax grpeters@duke-energy.com August 14, 2006 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

McGuire Nuclear Station, Docket Nos. 50-369 Unit 1, Cycle 18, Revision 29 Core Operating Limits Report (COLR)

Pursuant to McGuire Technical Specification (TS) 5.6.5.d, please find enclosed Revision 29 to the McGuire Unit 1 Cycle 18 Core Operating Limits Report (COLR). The timeliness of this submittal is not consistent with the subject TS and is being addressed in the corrective action program via PIP M06-2954.

Questions regarding this submittal should be directed to Kay Crane, McGuire Regulatory Compliance at (704) 875-4306.

Gary R. Peterson Attachment 4-ooi www. duke-energy, corn

U. S. Nuclear Regulatory Commission August 14, 2006 Page 2 cc: Mr. John Stang, Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 Mr. W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region 1I Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30323 Mr. Joe Brady Senior Resident Inspector McGuire Nuclear Station

MCEI-0400-46 Page 1 of 32 Revision 29 McGuire Unit 1 Cycle 18 Core Operating Limits Report Revision 29 May 2006 Calculation Number: MCC-1553.05-00-0428, Rev. 1 Duke Power Company Date Prepared By: 11I01VPA %kR f/I/zoo ('

Checked By:

Checked By:

(Sectio 22%d 2.10 - 2.17)

Approved By:  ?&1/4W QA Condition 1 The information presented in this report has been prepared and issued in accordance with McGuire Technical Specification 5.6.5.

MCEI-0400-46 Page 2 of 32 Revision 29 McGuire 1 Cycle 18 Core Operating Limits Report INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By:-

(Sponsor)

A'c5 41ý CA Date: s 2.?- z CATAWBA Inspection Waived MCE (Mechanical & Civil)

El Inspected By/Date:

RES (Electrical Only)

El Inspected By/Date:

RES (Reactor)

El Inspected By/Date:

MOD El Inspected By/Date:

Other ( _ ) El Inspected By/Date:

OCONEE Inspection Waived MCE (Mechanical & Civil)

El Inspected By/Date:

RES (Electrical Only) El .Inspected By/Date:

RES (Reactor) El Inspected By/Date:

MOD El El Inspected By/Date:

Other ( ) Inspected By/Date:

MCGUIRE Inspection Waived MCE (Mechanical & Civil) Inspected By/Date:

RES (Electrical Only) BE" Inspected By/Date:

RES (Reactor) [], Inspected By/Date:

MOD Inspected By/Date:

Other( ) Inspected By/Date:

MCEI-0400-46 Page 3 of 32 Revision 29 McGuire 1 Cycle 18 Core Operating Limits Report Implementation Instructions for Revision 29 Revision Description and PIP Tracking Revision 29 of the McGuire Unit 1 COLR revises the RCS Total Flow Rate for the McGuire I Cycle 18 reload core as described in PIP #M-06-01971. There are no other COLR changes.

Implementation Schedule Revision 29 may become effective at site Compliance's earliest possible convenience, or as prescribed in PIP #M-06-01971.

Data riles to be Implemented No data files are transmitted as part of this document.

Insertion/Deletion Instructions Remove Insert pages 1- 4, 27 of rev 28 pages 1- 4, 27 of rev 29

MCEI-0400-46 Page 4 of 32 Revision 29 McGuire 1 Cycle 18 Core Operating Limits Report REVISION LOG Revision Effective Da te Effective Pages COLR Revisions 0-3 Superseded N/A M1C09 Revisions 4-8 Superseded N/A M1Cll Revisions 9-11 Superseded N/A Revisions 12-15 Superseded N/A M1C12 Revisions 16-17 Superseded N/A M1C13 Revision 18-20 Superseded N/A MIC14 Revision 21-23 Superseded N/A M1C15 Revision 24-26 Superseded N/A M1C16 Revision 27 March 12, 200)4 1-32 M1C17 (Original Issue)

Revision 28 August 31, 20()5 1-32 M1C18 14 (Original Issue)

Revision 29 May 19, 200( 1-4,27 M1C18 (Revision 1)

MCEI-0400-46 Page 27 of 32 Revision 29 McGuire 1 Cycl6 18 Core Ope"atiiig"Lhits Report Table 4 Reactor Coolant System DNB Parameters No. Operable PARAMETER INDICATION CHANNELS LIMITS

1. Indicated RCS Average Temperature meter 4 < 587.2 *F meter 3 < 586.9 OF computer 4 < 587.7 *F computer 3 < 587.5 OF
2. Indicated Pressurizer Pressure meter 4 > 2219.8 psig meter 3 > 2222.1 psig computer 4 > 2215.8 psig computer 3 > 2217.5 psig
3. RCS Total Flow Rate > 390,000 gpm*
  • Note: The RCS minimum coolant flow rate assumed in the licensing analyses for the MIC18 core is 388,000 gpm. However, the flow is set at 390,000 gpm, which is conservative I