ML26043A253

From kanterella
Jump to navigation Jump to search

Analysis of PSEG Nuclear LLCs Updated Decommissioning Funding Plans for the Hope Creek, Salem, and Peach Bottom Independent Spent Fuel Storage Installations
ML26043A253
Person / Time
Site: Peach Bottom, Salem, Hope Creek  
Issue date: 02/10/2026
From: Christopher Markley
Office of Nuclear Material Safety and Safeguards
To: David Mannai, Sailaja Mokkapati
Exelon Nuclear, Public Service Enterprise Group
Shared Package
ML26043A277 List:
References
EPID L-2017-FPR-0033, EPID L-2017-FPR-0052
Download: ML26043A253 (0)


Text

From:

Chris Markley To:

"Licensing@pseg.com"; "sailaja.mokkapati@constellation.com" Cc:

Yoira Diaz Sanabria; Tilda Liu

Subject:

ANALYSIS OF PSEG NUCLEAR LLCS UPDATED DECOMMISSIONING FUNDING PLANS FOR THE HOPE CREEK, SALEM, AND PEACH BOTTOM INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS Date:

Tuesday, February 10, 2026 12:01:00 PM Attachments:

image003.png image004.png image005.png image006.png image007.png image008.png

NOTE THAT THIS EMAIL WILL BE ENTERED INTO NRC ADAMS AS PUBLICLY AVAILABLE DOCUMENT.

TO: David Mannai - Executive Director - Regulatory Affairs & Nuclear Oversight PSEG Nuclear, LLC, Hancocks Bridge, NJ

Sailaja Mokkapati - Director, Licensing Exelon Nuclear, Delta, PA

SUBJECT:

ANALYSIS OF PSEG NUCLEAR LLCS UPDATED DECOMMISSIONING FUNDING PLANS FOR THE HOPE CREEK, SALEM, AND PEACH BOTTOM INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS

By letter dated March 26, 2025 (ML25085A298), PSEG Nuclear LLC (PSEG) submitted an updated decommissioning funding plan (DFP) for Hope Creek Generating Station, Salem Generating Station, Units 1 and 2 and Peach Bottom Atomic Power Station, Units 2 and 3 Independent Spent Fuel Storage Installations (ISFSI), for U.S. Nuclear Regulatory Commission (NRC) staff review. Pursuant to Title 10 of the Code of Federal Register (CFR) 72.30(c), at the time of license renewal and at intervals not to exceed three years, the initial DFP required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination in an updated DFP. The updated DFP must update the information submitted with the original or prior approved plan. In addition, the updated DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

The NRC staff reviewed PSEGs 2025 updated DFP, including the updated decommissioning cost estimate (DCE) and the method of assuring funds for decommissioning, in accordance with 10 CFR 72.30(c) and NUREG-1757, Vol. 3, Rev. 1, Consolidated Decommissioning Guidance. Based on the review, the NRC staff finds that the updated DFP contains the information required by 10 CFR 72.30(c) and that PSEG has provided reasonable assurance by which funds will be available to decommission the ISFSI at Hope Creek, Salem, and Peach Bottom. Therefore, the NRC staff finds that the DCEs adequately estimated the cost, at this time, to carry out required ISFSI decommissioning

activities prior to license termination, and that the DCEs are reasonable.

If you have any questions regarding this matter, please contact me at (301) 415-6293 or via email at Christopher.Markley@nrc.gov.

Docket Nos:

Hope Creek & Salem: 72-48, 50-272, 50-311, 50-354 Peach Bottom: 72-23, 50-277, 50-278 EPID Nos.:

Hope Creek & Salem: L-2017-FPR-0033 Peach Bottom: L-2017-FPR-0052

Thank you,

-Chris

Christopher T. MARKLEY PhD l Systems Performance Analyst l Office of Nuclear Materials Safety and Safeguards l Division of Fuel Management l Storage and Transportation Licensing Branch United States Nuclear Regulatory Commission l Washington, DC 20555-0001 l

(: christopher.markley@nrc.gov l (: (301) 415-6293 l (: (301) 415-0020 l