Analysis of Nextera Energy Duane Arnolds Updated Decommissioning Funding Plans for the Duane Arnold Energy Center Independent Spent Fuel Storage Installation
ML26042A347
Person / Time
Site: Duane Arnold  
Issue date: 02/10/2026
From: Christopher Markley
Office of Nuclear Material Safety and Safeguards
To: Jennifer Davis, Hansen P
Florida Power & Light Co, NextEra Energy Duane Arnold
Shared Package
ML26043A277 List:
References
EPID L-2017-RPR-0023
Download: ML26042A347 (0)


Text

From:

Chris Markley To:

"James.Davis@nexteraenergy.com"; "Paul.hansen@fpl.com" Cc:

Yoira Diaz Sanabria; Tilda Liu

Subject:

ANALYSIS OF NEXTERA ENERGY DUANE ARNOLDS UPDATED DECOMMISSIONING FUNDING PLANS FOR THE DUANE ARNOLD ENERGY CENTER INDEPENDENT SPENT FUEL STORAGE INSTALLATION Date:

Tuesday, February 10, 2026 12:05:00 PM Attachments:

image003.png image004.png image005.png image006.png image007.png image008.png

NOTE THAT THIS EMAIL WILL BE ENTERED INTO NRC ADAMS AS PUBLICLY AVAILABLE DOCUMENT.

TO: James (Mike) Davis, Licensing Projects Manager Paul Hansen, Engineering Director Nuclear Management Co., LLC Palo, Iowa

SUBJECT:

ANALYSIS OF NEXTERA ENERGY DUANE ARNOLDS UPDATED DECOMMISSIONING FUNDING PLANS FOR THE DUANE ARNOLD ENERGY CENTER INDEPENDENT SPENT FUEL STORAGE INSTALLATION

By letter dated March 17, 2025 (ML25084A051), NextEra Energy Duane Arnold (NEDA) submitted an updated decommissioning funding plan (DFP) for the Duane Arnold Energy Center (DAEC) Independent Spent Fuel Storage Installation (ISFSI), for U.S. Nuclear Regulatory Commission (NRC) staff review. Pursuant to Title 10 of the Code of Federal Regulations CFR 72.30(c), at the time of license renewal and at intervals not to exceed three years, the initial DFP required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination in an updated DFP. The updated DFP must update the information submitted with the original or prior approved plan. In addition, the updated DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

The NRC staff reviewed NEDAs 2025 updated DFP, including the updated decommissioning cost estimate (DCE) and the method of assuring funds for decommissioning, in accordance with 10 CFR 72.30(c) and NUREG-1757, Vol. 3, Rev. 1, Consolidated Decommissioning Guidance. Based on the review, the NRC staff finds that the updated DFP contains the information required by 10 CFR 72.30(c) and that NEDA has provided reasonable assurance by which funds will be available to decommission the ISFSI at DAEC. Therefore, the NRC staff finds that the DCE adequately estimated the cost, at this time, to carry out required ISFSI decommissioning activities prior to license termination, and that the DCE is reasonable.

If you have any questions regarding this matter, please contact me at (301) 415-6293 or via

email at Christopher.Markley@nrc.gov.

Docket Nos:

72-32, 50-331 EPID No.:

L-2017-FPR-0023

Thank you,

-Chris

Christopher T. MARKLEY PhD l Systems Performance Analyst l Office of Nuclear Materials Safety and Safeguards l Division of Fuel Management l Storage and Transportation Licensing Branch United States Nuclear Regulatory Commission l Washington, DC 20555-0001 l

(: christopher.markley@nrc.gov l (: (301) 415-6293 l (: (301) 415-0020 l