Analysis of VA Electrics Updated Decommissioning Funding Plan for the Surry Independent Spent Fuel Storage Installation
ML26043A259
Person / Time
Site: Surry, 07200002, 07200055
Issue date: 02/10/2026
From: Christopher Markley
Office of Nuclear Material Safety and Safeguards
To: Lafrance J
Dominion Energy, Virginia Electric & Power Co (VEPCO)
Shared Package
ML26043A277 List:
References
EPID L-2017-FPR-0066, EPID L-2017-FPR-0004
Download: ML26043A259 (0)


Text

From:

Chris Markley To:

"Joshua.a.lafrance@dominionenergy.com" Cc:

Yoira Diaz Sanabria; Tilda Liu

Subject:

ANALYSIS OF VA ELECTRICS UPDATED DECOMMISSIONING FUNDING PLAN FOR THE SURRY INDEPENDENT SPENT FUEL STORAGE INSTALLATION Date:

Tuesday, February 10, 2026 11:52:00 AM Attachments:

image003.png image004.png image005.png image006.png image007.png image008.png

NOTE THAT THIS EMAIL WILL BE ENTERED INTO NRC ADAMS AS PUBLICLY AVAILABLE DOCUMENT.

TO: Joshua A. LaFrance - Manager of Licensing and Emergency Preparedness Virginia Electric and Power Company Glen Allen, VA 23060

SUBJECT:

ANALYSIS OF VA ELECTRICS UPDATED DECOMMISSIONING FUNDING PLAN FOR THE SURRY INDEPENDENT SPENT FUEL STORAGE INSTALLATION

By letter dated December 19, 2024 (ML24361A092), Virginia Electric and Power Company (VA Electric) submitted updated decommissioning funding plan (DFP) for the Surry Power Station (Surry) Independent Spent Fuel Storage Installation (ISFSI), for U.S. Nuclear Regulatory Commission (NRC) staff review. Pursuant to Title 10 of the Code of Federal Regulations (CFR) 72.30(c), at the time of license renewal and at intervals not to exceed three years, the initial DFP required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination in an updated DFP. The updated DFP must update the information submitted with the original or prior approved plan. In addition, the updated DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

The NRC staff reviewed VA Electrics 2024 updated DFP, including the updated decommissioning cost estimate (DCE) and the method of assuring funds for decommissioning, in accordance with 10 CFR 72.30(c) and NUREG-1757, Vol. 3, Rev. 1, Consolidated Decommissioning Guidance. Based on the review, the NRC staff finds that the updated DFP contains the information required by 10 CFR 72.30(c) and that VA Electric has provided reasonable assurance by which funds will be available to decommission the ISFSI at Surry. Therefore, the NRC staff finds that the DCE adequately estimated the cost, at this time, to carry out required ISFSI decommissioning activities prior to license termination, and that the DCE is reasonable.

If you have any questions regarding this matter, please contact me at (301) 415-6293 or via email at Christopher.Markley@nrc.gov.

Docket Nos:

Surry: 72-02, 72-55, 50-280, 50-281 EPID Nos.:

Surry: L-2017-FPR-0066, L-2017-FPR-0004

Thank you,

-Chris

Christopher T. MARKLEY PhD l Systems Performance Analyst l Office of Nuclear Materials Safety and Safeguards l Division of Fuel Management l Storage and Transportation Licensing Branch United States Nuclear Regulatory Commission l Washington, DC 20555-0001 l