Partial Site Release Amendment Issuance Letter
ML25241A167
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/18/2025
From: Allen C
Division of Decommissioning, Uranium Recovery and Waste Programs
To: Reid B
ADP CR3
Shared Package
ML25241A165 List:
References
EPID L-2025-LLA-0033
Download: ML25241A167 (0)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Billy Reid, Site Executive ADP CR3, LLC 157060 West Power Line Street Crystal River, FL 34428

SUBJECT:

APPROVAL OF CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT PARTIAL SITE RELEASE FOR FACILITY OPERATING LICENSE NO. DPR-72 (EPID NO. L-2025-LLA-0033)

Dear Billy Reid:

By letter dated February 10, 2025 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML25041A177), as supplemented on June 18, 2025 (ADAMS Accession No. ML25170A017), Accelerated Decommissioning Partners Crystal River Unit 3, LLC (ADP CR3) submitted a license amendment for Crystal River Unit 3. The proposed amendment would remove 618 acres of property, classified as either radiologically non-impacted or Multi-Agency Radiation Survey and Site Investigation Manual Class 3, associated with the Crystal River Unit 3 Operating License. In addition, the application requested the NRC to remove another 3,854 acres of property, classified as radiologically non-impacted, from the Crystal River Unit 3 Operating License as approved on January 2, 2020 (ADAMS Accession No. ML19339G509).

The application was submitted pursuant to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) Part 50.83. In accordance with 10 CFR 50.83, the NRC staff has completed its review of the CR3 partial site release and approves the proposed release of the 618 acres. The NRC has amended the enclosed license to reflect removal of both the 618 acres approved for release by this Phase II partial site release approved herein as well as the 3,854 acres approved for release by the prior Phase I partial site release.

Staff notes that 10 CFR Part 50.75(g) requires keeping records of information important to the safe and effective decommissioning of the facility, which includes the plant site, until the license is terminated by the Commission. Also, 10 CFR 50.75(g)(4)(iii) requires records of: the release and final disposition of any property recorded in § 50.75(g)(4)(i); the historical site assessment performed for the release; radiation surveys performed to support release of the property; submittals to the NRC made in accordance with § 50.83; and the methods employed to ensure that the property met the radiological criteria of 10 CFR Part 20, Subpart E, at the time the property was released. A copy of the Safety Evaluation Report is enclosed.

December 18, 2025

B. Reid 2

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs ADAMS.

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, Chris Allen, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No. 50-302 License No. DPR-72

Enclosure:

1.

Safety Evaluation Report 2.

Amended License cc: CR-3 Listserv Signed by Allen, William on 12/17/25

ML25241A165; Ltr ML25241A167 OFFICE NMSS/DUWP/RDB NMSS/DUWP

/RDB NMSS/DUWP/RDB NMSS/DUWP/RDB NAME KRobertson-DeMers WAllen RFedors MSutherland DATE Sep 22, 2025 Sep 15, 2025 Sep 24, 2025 Nov 19, 2025 OFFICE OGC/LHE/MFW*

NMSS/DUWP

/RDB NMSS/DUWP NAME KGeorgiev WAllen JMarshall SAnderson for DATE Dec 11, 2025 Dec 17, 2025 Dec 18, 2025