ML25157A059

From kanterella
Jump to navigation Jump to search

NRC Response to Epri’S Request to Reconsider the Conditions in the Draft Safety Evaluation for EPRI Report BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2
ML25157A059
Person / Time
Site: Electric Power Research Institute
Issue date: 06/06/2025
From: Lois James
Licensing Processes Branch
To: Bradley Davis, Palm N
Electric Power Research Institute
References
BWRVIP-138, Rev 2, EPID L-2023-TOP-0020 (Pre-app), EPID L-2023-TOP-0053 pre fee exem, EPID L-2023-NTR-0007 post fee exem
Download: ML25157A059 (1)


Text

ML25154A235), EPRI submitted their slides for the meeting.

The NRC staff reviewed EPRIs slides and decided to remove the conditions in question.

Please let us know if you would still like to have the public meeting on June 13, 2025 (ADAMS Accession No. ML25153A586).

If you have any questions, please feel free to contact me at lois.james@nrc.gov.

Lois James, Senior Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 99902016 EPID: L-2023-NTR-0007 ADAMS Accession Nos.: ML25157A059

^via eConcurrence *via email NRR-106 OFFICE DORL/LLPB/PM DNRL/NVIB/BC DORL/LLPB/BC DORL/LLPB/PM NAME LJames*

ABuford*

JRankin*

LJames DATE 06/06/2025 06/04/2025 06/06/2025 06/06/2025