MONTHYEARML23073A0652023-03-21021 March 2023 E-mail - NRC Withholding Determination Form 897 for the Slides for March 23, 2023, Closed Meeting with the NRC to Discuss BWRVIP-138, Rev 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Project stage: Meeting ML23073A0692023-03-21021 March 2023 Form 897 - NRC Withholding Determination Form 897 for the Slides for March 23, 2023, Closed Meeting with the NRC to Discuss BWRVIP-138, Rev 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Project stage: Meeting ML23061A1892023-03-23023 March 2023 NRC Slides - March 23, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-138, Updated Jet Pump Beam Inspection and Evaluation Guidelines Project stage: Meeting ML23061A1882023-04-20020 April 2023 Summary of Discussion Between the U.S. Nuclear Regulatory Commission and Electric Power Research Institute Regarding Submittal of BWRVIP-138, Updated Jet Pump Beam Inspection and Evaluation Guidelines, Revision 2 Project stage: Other ML23298A0782023-10-25025 October 2023 EPRI, BWRVIP-138, Revision 2: BWR Vessel and Internals Project, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines Project stage: Request ML23299A2952023-12-13013 December 2023 BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 - NRC 898, Completeness Review Project stage: Other ML23299A2932024-01-0303 January 2024 E-Mail - U. S. Nuclear Regulatory Commission Completion Determination Form 898 and Withholding Determination Form 897 for BWRVIP-138, Revision 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Project stage: Other ML23299A2962024-01-0303 January 2024 BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 - NRC 897, Withholding Determination Project stage: Other ML24051A0302024-01-30030 January 2024 Enclosure - Terrapower - Audit Summary Report - Principal Design Criteria Project stage: Other ML24051A0312024-01-30030 January 2024 Terrapower - Audit Summary Report Letter - Principal Design Criteria Project stage: Other ML24023A6902024-02-29029 February 2024 Electric Power Research Institute Regulatory Audit in Support of Review of BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Approval ML24183A0642024-07-11011 July 2024 Nonproprietary- EPRI Report 3002023754, BWRVIP-138, BWR Vessel and Internals Project, Updated Jet Pump Bean Inspection and Flaw Evaluation Guidelines, Revision 2, Final RAIs Project stage: Other ML24183A0392024-07-11011 July 2024 E-mail - Final Request for Additional Information - BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: RAI ML24261B9502024-09-17017 September 2024 EPRI Informs the NRC Staff of a Delay in Submitting the RAI Responses from October 9, 2024, to November 15, 2024 Project stage: Other ML24261B9572024-09-20020 September 2024 Change in Estimated Review Schedule for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Other ML24060A0942024-10-0101 October 2024 Report Regarding March 4-29, 2024, Regulatory Audit for Electric Power Research Institute Technical Report Boiling Water Reactor Vessel Internals Program (BWRVIP)-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revisio Project stage: Other ML24240A1232024-10-0101 October 2024 Non-Proprietary - Enclosure 2 - Report Regarding March 4 -29, 2024, Regulatory Audit for EPRI Technical Report BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 (EPID L-2023-NTR-0007) - Non-Proprietary Project stage: Other ML24295A2122024-10-16016 October 2024 Transmittal of MRP-392: Materials Reliability Program: Zorita Internals Research Project: Radiation and Temperature Analysis of Zorita Baffle Plate and Core Barrel Weld Material for Information Only Project stage: Request ML24295A2142024-10-16016 October 2024 EPRI - Request for Withholding of the the Following Commercial Document: MRP-392: Materials Reliability Program: Zorita Internals Research Project: Radiation and Temperature Analysis of Zorita Baffle Plate and Core Weld Material, EPRI Id 30 Project stage: Request ML24323A1112024-11-15015 November 2024 BWRVIP-138 Revision 2 RAIs - Short Delay Project stage: Other ML24338A0012024-11-18018 November 2024 NRC Staff Request Status of EPRIs RAI Response Regarding Submission of MRP-392 Which Is Covered by 10CFR2.309 Project stage: RAI ML24338A0022024-11-18018 November 2024 EPRIs Status of EPRIs RAI Response Regarding Submission of MRP-392 Which Is Covered by 10CFR2.309 Project stage: Other ML25028A1032025-02-28028 February 2025 E-Mail: Draft Safety Evaluation Associated for EPRI Report BWRVIP 138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines Revision 2 Project stage: Draft Approval PMNS20250708, Draft SE Public Meeting for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 22025-06-0202 June 2025 Draft SE Public Meeting for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Draft Approval ML25160A0132025-06-0606 June 2025 EPRIs Acceptance of Changes in and Indication of No Meeting Needed for Safety Evaluation for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Meeting ML25157A0592025-06-0606 June 2025 NRC Response to Epri’S Request to Reconsider the Conditions in the Draft Safety Evaluation for EPRI Report BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Draft Approval 2024-10-16
[Table View] |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION TECHNICAL REPORT 3002023754 BWRVIP-138, REVISION 2 BWR VESSEL AND INTERNALS PROJECT, UPDATED JET PUMP BEAM INSPECTION AND FLAW EVALUATION GUIDELINES REQUESTS FOR ADDITIONAL INFORMATION (RAIS) \\
DOCKET NO. 99902016 PROPRIETARY
==
Introduction:==
By letter dated October 25, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23298A078), Electric Power Research Institute (EPRI) submitted for U.S. Nuclear Regulatory Commission (NRC) review and approval topical report (TR),
BWRVIP-138, Revision 2: BWR Vessel and Internals Project, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, EPRI Report 3002023754. This report updates the inspection and flaw evaluation guidelines of jet pump holdown beams in boiling water reactors (BWRs) as part of the BWR Vessel and Internals Project (BWRVIP).
As part of its review, the NRC staff participated in an audit of the TR and associated background documents with the EPRI and BWRVIP personnel in Spring 2024. The audit plan is shown in ADAMS Accession No. ML24023A690. Based on the audit, the NRC staff concluded that additional information is needed to complete the review. Accordingly, the NRC staff requests for additional information (RAI) as shown below. Many of the RAI questions are based on the staffs questions raised during the audit.
Regulatory Basis:
The BWRVIP guidance regarding jet pump beam (JPB) inspections is a voluntary program pursued by industry in order to address past failures in BWR units. These failures could cause damage to surrounding internal components. If a failure occurs, existing jet pump operability surveillance procedures required by plant technical specifications will detect a beam failure and require a reactor shut down. The purpose of this inspection guideline is to avoid mid-cycle failures and possible damage to reactor internals. The creation of the BWRVIP was, at least in part, motivated by a desire to demonstrate that no increased specificity in NRC regulation for BWR internals aging management would be necessary.
The NRC has approved initial license renewal applications for many domestic nuclear power plants in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 54. Some of the nuclear plants have entered the period of extended operation. As such, the regulation in 10 CFR 54.21(a)(3) requires that, for each structure and component determined to be subject to an aging management review, a BWR licensee must demonstrate that the effects of aging of the reactor vessel internal components such as JPBs will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis (CLB) for the relevant period of extended operation.