Letter Sequence RAI |
|---|
|
Results
Other: ML23061A188, ML23299A293, ML23299A295, ML23299A296, ML24051A030, ML24051A031, ML24060A094, ML24183A064, ML24240A123, ML24261B950, ML24261B957, ML24323A111, ML24338A002
|
MONTHYEARML23073A0652023-03-21021 March 2023 E-mail - NRC Withholding Determination Form 897 for the Slides for March 23, 2023, Closed Meeting with the NRC to Discuss BWRVIP-138, Rev 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Project stage: Meeting ML23073A0692023-03-21021 March 2023 Form 897 - NRC Withholding Determination Form 897 for the Slides for March 23, 2023, Closed Meeting with the NRC to Discuss BWRVIP-138, Rev 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Project stage: Meeting ML23061A1892023-03-23023 March 2023 NRC Slides - March 23, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-138, Updated Jet Pump Beam Inspection and Evaluation Guidelines Project stage: Meeting ML23061A1882023-04-20020 April 2023 Summary of Discussion Between the U.S. Nuclear Regulatory Commission and Electric Power Research Institute Regarding Submittal of BWRVIP-138, Updated Jet Pump Beam Inspection and Evaluation Guidelines, Revision 2 Project stage: Other ML23298A0782023-10-25025 October 2023 EPRI, BWRVIP-138, Revision 2: BWR Vessel and Internals Project, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines Project stage: Request ML23299A2952023-12-13013 December 2023 BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 - NRC 898, Completeness Review Project stage: Other ML23299A2932024-01-0303 January 2024 E-Mail - U. S. Nuclear Regulatory Commission Completion Determination Form 898 and Withholding Determination Form 897 for BWRVIP-138, Revision 2, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Project stage: Other ML23299A2962024-01-0303 January 2024 BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 - NRC 897, Withholding Determination Project stage: Other ML24051A0302024-01-30030 January 2024 Enclosure - Terrapower - Audit Summary Report - Principal Design Criteria Project stage: Other ML24051A0312024-01-30030 January 2024 Terrapower - Audit Summary Report Letter - Principal Design Criteria Project stage: Other ML24023A6902024-02-29029 February 2024 Electric Power Research Institute Regulatory Audit in Support of Review of BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Approval ML24183A0642024-07-11011 July 2024 Nonproprietary- EPRI Report 3002023754, BWRVIP-138, BWR Vessel and Internals Project, Updated Jet Pump Bean Inspection and Flaw Evaluation Guidelines, Revision 2, Final RAIs Project stage: Other ML24183A0392024-07-11011 July 2024 E-mail - Final Request for Additional Information - BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: RAI ML24261B9502024-09-17017 September 2024 EPRI Informs the NRC Staff of a Delay in Submitting the RAI Responses from October 9, 2024, to November 15, 2024 Project stage: Other ML24261B9572024-09-20020 September 2024 Change in Estimated Review Schedule for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Other ML24060A0942024-10-0101 October 2024 Report Regarding March 4-29, 2024, Regulatory Audit for Electric Power Research Institute Technical Report Boiling Water Reactor Vessel Internals Program (BWRVIP)-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revisio Project stage: Other ML24240A1232024-10-0101 October 2024 Non-Proprietary - Enclosure 2 - Report Regarding March 4 -29, 2024, Regulatory Audit for EPRI Technical Report BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 (EPID L-2023-NTR-0007) - Non-Proprietary Project stage: Other ML24295A2122024-10-16016 October 2024 Transmittal of MRP-392: Materials Reliability Program: Zorita Internals Research Project: Radiation and Temperature Analysis of Zorita Baffle Plate and Core Barrel Weld Material for Information Only Project stage: Request ML24295A2142024-10-16016 October 2024 EPRI - Request for Withholding of the the Following Commercial Document: MRP-392: Materials Reliability Program: Zorita Internals Research Project: Radiation and Temperature Analysis of Zorita Baffle Plate and Core Weld Material, EPRI Id 30 Project stage: Request ML24323A1112024-11-15015 November 2024 BWRVIP-138 Revision 2 RAIs - Short Delay Project stage: Other ML24338A0012024-11-18018 November 2024 NRC Staff Request Status of EPRIs RAI Response Regarding Submission of MRP-392 Which Is Covered by 10CFR2.309 Project stage: RAI ML24338A0022024-11-18018 November 2024 EPRIs Status of EPRIs RAI Response Regarding Submission of MRP-392 Which Is Covered by 10CFR2.309 Project stage: Other ML25028A1032025-02-28028 February 2025 E-Mail: Draft Safety Evaluation Associated for EPRI Report BWRVIP 138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines Revision 2 Project stage: Draft Approval PMNS20250708, Draft SE Public Meeting for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 22025-06-0202 June 2025 Draft SE Public Meeting for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Draft Approval ML25160A0132025-06-0606 June 2025 EPRIs Acceptance of Changes in and Indication of No Meeting Needed for Safety Evaluation for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Meeting ML25157A0592025-06-0606 June 2025 NRC Response to Epri’S Request to Reconsider the Conditions in the Draft Safety Evaluation for EPRI Report BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 Project stage: Draft Approval 2024-10-16
[Table View] |
Text
1 Lois James From:
Lois James Sent:
Thursday, July 11, 2024 9:47 AM To:
martin.bonifanti@constellation.com; Palm, Nathan Cc:
RidsNrrOd Resource; RidsNrrDnrl Resource; RidsNrrLADHarrison Resource; RidsNrrDorl Resource; RidsNrrDorlLlpb Resource; RidsACRS_MailCTR Resource; Lois James; Gerond George; Angie Buford; John Wise; David Rudland; John Tsao; Michael Benson; wmcgruder@epri.com; npalm@epri.com; drouse@epri.com; npalm@epri.com; mwalter@epri.com; Demetrius Murray
Subject:
Final Request for Additional Information - EPRI Report BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2 (EPID No. L-2023-NTR-0007)
Martin Bonifanti, Constellation, BWRVIP Chairman Nathan Palm, EPRI, BWRVIP Program Manager 1300 West W.T. Harris Blvd Charlotte, NC 28262-8550 Martin Bonifanti and Nathan Palm:
By letter dated October 25, 2023 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML23298A077), Electric Power Research Institute (EPRI) submitted Boiling Water Reactor Vessel Internals Program (BWRVIP)-138, Revision 2, BWR Vessel and Internals Project, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, for U.S. Nuclear Regulatory Commission (NRC) review.
BWRVIP-138 incorporates new crack growth and crack initiation data from BWRVIP-291, Revision 1, BWR Vessel and Internals Project, Microstructure, SCC, and J-R Fracture Resistance of Alloy X-750 and XM-19:
Final Report 2017, and updated operating experience.
By email dated January 3, 2024 (ADAMS Accession No. ML23299A287), the NRC staff accepted the BWRVIP-138, Revision 2 for review.
Based on our review, the NRC staff in the Division of New and Renewed Licenses (DNRL), Vessels Internals Branch (NVIB) has identified Requests for Additional information (RAIs). The nonproprietary version of the RAIs is available in ADAMS at Accession No. ML24183A064. The proprietary version of the RAIs were placed in NRC BOX and shared with Wynter McGruder and Nathan Palm of your staff.
The staffs request contains some proprietary materials. The proprietary contents are identified using a
(( yellow highlighted, bolded, double bracketed )) text format. Consistent with the Commission proprietary withholding criteria in 10 CFR 2.390, the staff is protecting the identified proprietary material from public disclosure. For the redacted version, publicly available version of the RAI, the protected material will be deleted from the bolded brackets (i.e., designated by a blank (( )) bracketed format).
These requests for additional information were discussed with Wynter McGruder of your staff, and a mutually agreeable date for the response is within 90 days from the date of this email.
If you have any questions, please contact me by e-mail Lois.James@nrc.gov.
Sincerely, Lois M. James, Senior Project Manger Office of Nuclear Reactor Regulation (NRR)
ML24183A037 (pkg); ML24183A039 (email);
ML24183A040 (proprietary RAIs); ML24183A064 (nonproprietary RAIs)
- via email NRR-106 OFFICE NRR/DORL/LLPB/PM NRR/DNRL/NVIB/BC DORL/LLPB/BC DORL/LLPB/PM NAME LJames ABuford*
GGeorge* LFields for LJames DATE 07/09/2024 07/03/2024 07/02/2024 07/09/2024