PNP 2025-052, Superseding Notice of Documentary Evidence of Commitments in Application for Order Consenting to Transfer of Control of Licensed Authority
| ML25197A526 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/16/2025 |
| From: | Fleming J Holtec Palisades |
| To: | Office of Nuclear Material Safety and Safeguards, Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML25197A525 | List: |
| References | |
| PNP 2025-052 | |
| Download: ML25197A526 (1) | |
Text
27780 Blue Star Highway, Covert, MI 49043 1
PNP 2025-052 July 16, 2025 10 CFR 50.80 10 CFR 50.90 10 CFR 72.50 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 Palisades Nuclear Plant Docket Nos. 50-255 and 72-007 Renewed Facility Operating License No. DPR-20
Subject:
Superseding Notice of Documentary Evidence of Commitments in Application for Order Consenting to Transfer of Control of Licensed Authority to Palisades Energy, LLC Holtec Palisades hereby provides documentary evidence to satisfy the commitments set forth in Attachment E to Enclosure 1 of the pending license transfer application (Reference 1). This notice supersedes the notice provided via letter dated July 9, 2025 (Reference 2).
Commitment 1: notice of the planned closing date for proposed transaction and transfer of operating authority so that NRC can issue the license amendment.
The planned date for the transfer of operational authority from Holtec Decommissioning International (HDI) to Palisades Energy is July 24, 2025.
Commitment 2: proof that on-site property damage insurance coverage and off-site nuclear liability coverage, as required by NRC, has been obtained and that coverage will be in place on the effective date of the transfer. includes documentary evidence of the on-site property damage insurance coverage and off-site nuclear liability coverage required by 10 CFR 140.11(a)(4) and 10 CFR 50.54(w)(1) has been obtained and will be in place on the effective date of the transfer. Holtec Palisades requests that NRC issue the conforming amendment to the Price-Anderson indemnity agreement for PNPto add Palisades Energy as a licensee for the facility and name Palisades Energy as an indemnified entityon the same date NRC issues the conforming amendments to the RFOL reflecting the transfer of operational authority to Palisades Energy. a Contains Non-Public Information Withhold in Accordance with 10 CFR 2.390 HOLTEC PALISADES
2 Commitment 3: evidence that Holtec Palisades has provided sufficient financial assurance for decommissioning to satisfy the requirements applicable to an operating reactor pursuant to 10 CFR 50.75 and 72.30.
In Reference 3, HDI submitted its annual decommissioning funding report, which provided the formula amount for PNP under 10 CFR 50.75(c) and the estimated ISFSI decommissioning costs under 10 CFR 72.30both in 2024 dollars. Enclosure 2 provides an updated calculation of the minimum funding amount required by 10 CFR 50.75(c) and an escalated ISFSI decommissioning cost estimate through May 31, 2025, along with documentary evidence showing that the PNP decommissioning trust fund is sufficiently funded to cover both amounts.
Commitment 4: evidence that the Palisades organization meets the staffing and qualification requirements set forth in the power operations Technical Specifications, Physical Security Plan, Emergency Plan, Quality Assurance Program Manual, and Updated Final Safety Analysis Report. provides evidence that the PNP organization meets the referenced staffing and qualification requirements. Certain information contained in this evidence constitutes personally identifiable information, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy. Holtec has redacted such personally identifiable information from Enclosure 3. A non-public version of Enclosure 3 is provided as a. Holtec requests that the NRC withhold Enclosure 3a from public disclosure pursuant to 10 CFR 2.390(a)(6).
This letter contains no new commitments.
Holtec Palisades will notify the NRC of any developments that impact the schedule for consummating the transfer of these licenses.
If you have any questions regarding this submittal, please contact Frank Sienczak, Regulatory Assurance Manager, at (269) 764-2263.
I declare under penalty of perjury that the foregoing and the information included in the Enclosures to this letter is true and correct. Executed on July 9, 2025.
Sincerely, Jean A. Fleming Vice President of Licensing and Regulatory Affairs Holtec International
References:
- 1. Holtec Decommissioning International, LLC letter to U.S. Nuclear Regulatory Commission, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, dated Dec. 6, 2023 (ADAMS Accession No. ML23340A161)
Digitally signed by Jean A. Fleming DN: cn=Jean A. Fleming, o=Holtec Decommissioning International, LLC, ou=Regulatory and Environmental Affairs, email=J.Fleming@Holtec.com Date: 2025.07.16 07:40:42 -04'00' Jean A.
Fleming
3
- 2. Holtec Palisades, LLC letter to U.S. Nuclear Regulatory Commission, Documentary Evidence of Commitments in Application for Order Consenting to Transfer of Control of Licensed Authority to Palisades Energy, LLC, dated July 9, 2025 (ADAMS Accession No. ML25191A014)
- 3. Holtec Decommissioning International, LLC letter to U.S. Nuclear Regulatory Commission, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec Decommissioning International, LLC (HDI), dated Mar. 31, 2025 (ADAMS Accession No. ML25090A172)
Enclosures:
- Evidence of Required Insurance Coverages - Evidence of Decommissioning Funding Assurance - Evidence of PNP Staffing and Qualifications (public) a - Evidence of PNP Staffing and Qualifications (non-public) cc: (w/enclosures)
NRC Region III Regional Administrator NRC Senior Resident Inspector - Palisades Nuclear Plant NRC Project Manager - Palisades Nuclear Plant Designated Michigan State Official
27780 Blue Star Highway, Covert, MI 49043 - Evidence of Required Insurance Coverages HOLTEC PALISADES
NEIL Services, Inc.
1 Righter Parkway, Suite 210 Wilmington, DE 19803 USA June 26, 2025 ATTN: Document Control Desk Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re.: Entergy Nuclear Operations, Inc., Entergy Nuclear Palisades, LLC - License Transfer to Holtec Palisades, LLC and Holtec Decommissioning International, LLC To whom it may concern:
This letter confirms that Nuclear Electric Insurance Limited is willing to write a Nuclear Liability and Decontamination Liability Policy for Holtec Palisades, LLC as 100% owner and Palisades Energy, LLC as licensee of the Palisades Nuclear Plant, subject to the payment of premium. A Nuclear Liability and Decontamination Insurance Policy will be effective upon modification of the facility license.
The limits on the above-referenced policy will satisfy the NRC minimum required insurance limit of $1.06 billion for this site.
This commitment to write a Nuclear Liability and Decontamination Insurance Policy for Holtec Palisades, LLC and Palisades Energy, LLC for a twelve-month period remains valid through June 28, 2026.
Sincerely, Jon Levis Jon Levis, CPCU, AU-M, ARM, Are Manager - Underwriting (Nuclear) cc:
Everett Hansen (Marsh USA)
Stephen Woods (NEIL Overseas dac)
Scott Lauchlan (NEIL Services)
Ken Manne (NEIL Services)
Peter Cavanaugh (NEIL Services)
Services
Emily McFarlin Senior Underwriter American Nuclear Insurers 95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 emcfarlin@nuclearinsurance.com Voice: (860) 682-1350 Fax: (860) 659-0002 June 27, 2025 Attn: Document Control Director, Office of Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re: Holtec Palisades, LLC and Palisades Energy, LLC NRC Operating License Transfer for Palisades Nuclear Plant - Letter of Insurability To Whom It May Concern, This letter confirms that American Nuclear Insurers will write nuclear liability insurance for the Palisades Nuclear Plant, located in the town of Covert Township, Van Buren County, MI, upon the transfer of the NRC operating license from Holtec Palisades, LLC and Holtec Decommissioning International, LLC to Holtec Palisades, LLC and Palisades Energy, LLC.
As of the date of the license transfer, which is expected to be on or before August 25, 2025, we will amend the policy and certificates for the Palisades Nuclear Plant as follows:
- a. Facility Form Policy No. NF -0179: ANI will amend the named insured to Holtec Palisades, LLC and Palisades Energy, LLC in lieu of Holtec Palisades, LLC and Holtec Decommissioning International, LLC. The operator of the facility will also change to Palisades Energy, LLC.
- b. Master Worker Certificate No. NW -0566: ANI will amend the named insureds to Holtec Palisades, LLC and Palisades Energy, LLC in lieu of Holtec Palisades, LLC and Holtec Decommissioning International, LLC. The operator of the facility will also change to Palisades Energy, LLC.
c.
SFP Certificate No. N -0020: ANI will amend the named insureds to Holtec Palisades, LLC and Palisades Energy, LLC in lieu of Holtec Palisades, LLC and Holtec Decommissioning International, LLC.
- d. SFP Certificate No. N -0020: ANI will add Palisades Energy, LLC to the Bond for payment of retrospective premiums. Palisades Energy, LLC is assuming all past and future liabilities of Holtec Decommissioning International, LLC for the payment of retrospective premiums.
Attn: Document Control June 27, 2025 Page 2 American Nuclear Insurers 95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 emcfarlin@nuclearinsurance.com Voice: (860) 682-1350 Fax: (860) 659-0002 The commitment to write insurance for Holtec Palisades, LLC and Palisades Energy, LLC for the Palisades Nuclear Plant remains valid through October 31, 2025. In the event the license transfer occurs after this date, ANI will review the existing circumstances prior to reinstating our commitment to provide insurance.
Please feel free to contact me with any questions or comments.
Best Regards, Emily McFarlin Senior Underwriter
27780 Blue Star Highway, Covert, MI 49043 - Evidence of Decommissioning Funding Assurance HOLTEC PALISADES
This Attachment provides the methodology used to calculate the formula cost per 10 CFR 50.75(c) for Palisades.
The labor, energy and burial indexes used are consistent with those described in NUREG-1307, Revision 20, issued February 2025. The current labor cost indexes used are obtained from the Employment Cost Index published by the U.S. Department of Labor, Bureau of Labor Statistics (BLS). Specifically, the Employment Cost Index for total compensation for private industry workers in the Midwest regions. The labor adjustment factors were calculated according to Section 3.2 of NUREG-1307, Revision 20 using first quarter 2025 data. Table 1 shows the data used for this calculation.
Table 1: Labor Adjustment Factors Applicable Site Series ID 1Q2025 Index Number Labor Adjustment Factor (Lx)
Palisades CIU2010000000230I 166 3.4528 The current energy cost indexes used are obtained from Producer Price Indexes (PPI) -
Commodities, published by the U.S. Department of Labor, BLS. Specifically, the PPI for industrial electric power (WPU0543) and light fuel oils (WPU0573). The energy adjustment factors were calculated according to Section 3.3 of NUREG-1307, Revision 20, using May 2025 data. Table 2 shows the data used for this calculation.
Table 2: Energy Adjustment Factor WPU0543 - January 1986 (base value) 114.2 WPU0573 - January 1986 (base value) 82.0 WPU0543 - May 2025 (preliminary value) 304.44 WPU0573 - May 2025 (preliminary value) 274.104 Industrial Electric Power Adjustment Factor - (PX) 2.587 Light Fuel oil Adjustment Factor - (FX) 3.3427 Energy Adjustment Factor - (PWR) 2.9501 The waste burial adjustment factors are taken from Table 2-1 of NUREG-1307, Revision 20.
The adjustment factors assume non-compact waste disposal facilities. Table 3 shows the data used for this calculation.
Table 3: Waste Burial Adjustment Factor LLW Burial Site Reactor Type Site Combination of Compact-Affiliated and Non-Compact Disposal Facilities Waste Adjustment Factor -
(BX)
Generators Located in Unaffiliated States
- (BX)
Generic LLW PWR Palisades N/A 12.405
The calculation methodology used for all adjustment factors and displayed in Table 4 is consistent with NUREG-1307, Revision 20.
Table 4: Escalation Factors and Calculated Adjustments for HDI Sites Site Escalation Factors -
(Lx), (Ex), (Bx)
Escalation Factor Formula 10 CFR 50.75(c)(2)
Escalation Factor 1986 Base Year $
Escalated Palisades (Midwest PWR)
(Lx) 3.4528 0.65(L)+0.13(E)+0.22(B) 5.357
$522,706,030 (Ex) 2.9501 (Bx) 12.405
Table 4-1 Palisades ISFSI Decommissioning Cost Estimate (thousands of 2025 dollars)
Palisades Activities WBS PSDAR License Termination Spent Fuel Site Restoration Total Costs ISFSI Demolition Non-Radiological 10.03.02.03 4,804 4,804 ISFSI Final Site Survey 10.03.01.01 113 113 ISFSI NRC Confirmatory Suvey 10.03.01.01 11 11 ISFSI Demolition Radiological 10.03.01.01 559 559 ISFSI Radiological Waste 10.03.02.03 1,953 1,953 NRC License Termination Support 10.03.01.01 Security and O&M 10.03.02.02 1,110 1,110 Property Tax 10.03.02.02 15 15 Insurance 10.03.02.02 380 380 NRC Regulatory Fees 10.03.02.02 1,560 1,560 Totals 682 3,065 6,757 10,504
My Report Library Account number PLSADE 31 May 25 HOLTEC PALISADES Page 7 of?
Asset Summary Accrued Unrealized gain/loss Market values Descrielion income/expense Market value Cost Market Translation Total incl. accruals Adjustments To Cash Pending trade sales Pending trade sales 0.00 7,550,816.09 7,550,373.93 0.00 442.16 442.16 7,550,816.09 1.335%
Total pending trade sales 0.00 7,550,816.09 7,550,373.93 0.00 442.16 442.16 7,550,816.09 1.335%
Total adjustments to cash 0.00
-1,944,512.83
-1,945,275.53 0.00 762.70 762.70
-1,944,512.83
-0.344%
Total Unrealized Gains 176,659,348.28 Total Unrealized Losses
-4,857,292.21 Total 1,325,031.10 564,487,061.52 392,685,005.45 171,144,143.50 657,912.57 171,802,056.07 565,812,092.62 100.000%
Total Cost incl. Accruals 394,010,036.55 Although this report has been prepared using information believed to be reliable, it may contain information provided by third parties or derived from third party information, and/or information that may have been obtained from, categorized or otherwise reported based upon client direction. The Northern Trust Company does not guarantee the accuracy, timeliness or completeness of any such information. The information included in this report is intended to assist clients with their financial reporting needs, but you must consult with your accountants, auditors and/or legal counsel to ensure your accounting and financial reporting complies with applicable laws, regulations and accounting guidance. The Northern Trust Company and its affiliates shall have no responsibility for the consequences of investment decisions made in reliance on information contained in this report.
- Generated by Northern Trust from reviewed periodic data on 20 Jun 25 8002
27780 Blue Star Highway, Covert, MI 49043 - Evidence of PNP Staffing and Qualifications (public)
HOLTEC PALISADES
1 Technical Speci"cations - Personnel listed are currently in role, or fully quali"ed and awaiting implementation of Power Ops Technical Speci"cations General Manager, Plant Operations Radiation Protection Manager Shift Manager Shift Engineer Licensed Operators Name License #
Docket #
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
[
]
2 Physical Security Plan 109 fully quali"ed officers Emergency Plan - Positions listed have personnel fully quali"ed and awaiting implementation of Power Ops Emergency Plan EOF o Emergency Director o Technical Advisor o Offsite Communicator o Radiological Assessment Coordinator o Dose Assessor o Offsite Team Coordinator o Lead Offsite Liaison o Offsite Liaison - State of Michigan o Offsite Liaison - Van Buren County o Offsite Liaison - Allegan County o Offsite Liaison - Berrien County o Administrative & Logistics Coordinator o Log Keeper o IT Specialist Joint Information Center o Company Spokesperson o JIC Manager o Media Liaison o Technical Advisor o Rumor Control o Security Officer Operations Support Center o OSC Manager o Rad/Chem Coordinator o Mechanical Coordinator o Electrical/I&C Coordinator o Work Control Coordinator o Operations Support o Repair Technicians o Radio Communicator o Log Keeper
3 o Administrative Support Technical Support Center o Emergency Plant Manager o Operations Coordinator o Engineering Coordinator o Maintenance Coordinator o Reactor Engineer o Electrical/I&C Engineer o Mechanical Engineer o Offsite Communicator o ENS Communicator o Radiological Coordinator o Security Liaison o Log Keeper o IT Specialist Quality Assurance Program Manual - listed personnel and functions are currently in place and being executed Holtec President Chief Nuclear Officer Site Vice President Nuclear Safety Review Board Vice President, Licensing & Regulatory Assurance Quality Assurance Manager Onsite Safety Review Committee Management responsible for o Overall plant operations o Emergency planning o Training o Corrective action o Security o Records management o Materials o Purchasing and contracts o Procurement o Services, receipt, storage, and issue of materials, parts, and components o Engineering
4 o Development and maintenance of engineering programs, o Plant design bases, policies, and procedures and for providing engineering services o Regulatory assurance Updated Final Safety Analysis Report - Listed personnel and functional areas are currently in place and executing roles and responsibilities UFSAR Chapter 12 o Site Vice President o General Manager, Plant Operations o Director, Regulatory and Site Strategies o Operations o Maintenance o Projects and Outage o Radiation Protection o Production o Chemistry o Training o Emergency Preparedness o Performance Improvement o Security
HOLTEC Palisades Nuclear Plant Holtec Palisades C-Suite I
I CHIEF NUCLEAR OFFICER Richard Burroni SITE VICE PRESIDENT PALISADES Michael Mlynarek HOLTEC PALISADES Site Organization RESTARTED ORGANIZATION CHART CEO & EXECUTIVE CHAIRMAN Dr. Kris P. Singh PRESIDENT HOLTEC INTERNATIONAL Kelly Trice 1
VP, LICENSING, REG ASSURANCE & PSA Jean Fleming HOLTEC PALISADES Quality Assurance &
Employee Concern Program 07-07-2025
INPO II I
HOLTEC OVERVIEW I
I Palisades Nuclear Plant RESTARTED ORGANIZATION CHART VP, SITE Michael Mlynarek (676)
I LOANEE ASSISTANT, DIR, REGULATORY &
MGR, ORGANIZATIONAL EFFECTIVENESS Tiffany Rydwelski GM, PLANT OPS I
EXEC Jeff Borah
~ -
=
SR MGR, OPERATIONS ASSTGMPO Adam Eastridge Steven Vonk SR MGR, SR MGR II PROJECTS MAINTENANCE Nathan DeMaster Vacant
- MGR, MGR, RP OUTAGES Steven Thilmony Gerald Wright
~
- MGR, MGR, PRODUCTION CHEMISTRY Doug Albee Michael Lee II ADMIN GMPO SUPV, SAFETY Vacant
~
Scott McAbee COORD, SAFETY II Ray Cogdell I
DIR, ENGINEERING Joseph Jerz
~
- MGR, PROCUREMENT,_
John Kasishke MGR,DESIGN I
DESIGN/PROJ ENG,_
Katherine Chenier
- MGR, SYSTEMS ENG -----
Stephanie Liska ADMIN,SR 2
SITE STRATEGIES II Michael Schultheis MGR, REG ASSUR Frank Sienczak MGR, EP Kami Miller -
I COORD, ORGANI ZATIONAL ss EFFECTIVE NE COORD,HUM AN CE PE RF ORMAN -
MGR, PERFOR MANCE MGR, TRAINING Michael Bailey -
IMPROVEM ENT
- MGR, SECURITY -
Scott Summers II Lynn Summ ers I
PERFORMA NCE COORD IMPROVE,NT 07-07-2025
HOLTEC VP, SITE (INDIRECTS)
MGR,QA Kevin Block Reports to VP, Lie, Reg Assurance &
PSA MGR, ECP Eric Madsen Reports to VP, Lie, Reg Assurance
&PSA MGR,IT Reports to Dir, IT Rod Glitz Palisades Nuclear Plant RESTARTED ORGANIZATION CHART VP, SITE Michael Mlynarek SRMGR,GOVT AFFAIRS/COMMUNICATIONS Nicholas Culp Reports to Director, Govt Affairs/Communications MGR, COMMUNICATIONS Valary Gent MGR, FINANCE Chad Burton Reports to HDI CFO 3
HR ASSISTANT MGR,HR Carrie Jackson (Staff: 5)
Reports to Director, HR TALENT ACQUISITION GENERALIST, HR 111111111111111 -
07-07-2025
HOLTEC ENGINEERING/PROCUREMENT DPIC, ENGINEERING Vacant SUPV, BOP SYSTEMS ELEC BOP ENG MECH BOP ENG (3) -
PM,ENG -
MGR, SYSTEMS Vacant SUPV, NSSS SYSTEMS ELEC NSSS ENG (3)
MR/MSPI/NEIL ENG (2)
SUPVI COMPONENTS COMPONENT ENG Palisades Nuclear Plant RESTARTED ORGANIZATION CHART DIR, ENGINEERING Joseph Jerz (Staff: 105)
(Including Procurement)
MGR, PROGRAMS Stephanie Liska CHIEF ENGINEER Steven Overway MGR, DESIGN & ANALYSIS Katherine Chenier EQUIPMENT RELIABILITY COORD SUPVI PROGRAMS SUPV, ELEC/l&C DESIGN SUPV, MECH/CIVIL DESIGN PROGRAM ENGINEER (6)
NDE LEVEL II -
4 RX/NUC FUELS ENG (5)
(3)
FIRE PROTECTION ENG (2)
DIGITAL/l&C DES ENG ELEC DES ENG (4)._.
EEQ ENGINEER DESIGNER SUPERVISOR, EFIN MECHANICAL EFIN ENG (3)
ELEC EFIN ENG (4) -----
CIVIL EFIN ENG (2)
MECH DES ENG (5).-.
CIVIL DES ENG (3)
DESIGNER (2) 07-07-2025
HOLTEC ENGINEERING/PROCUREMENT (Continued)
SUPV, MATERIALS STOCKKEEPER Palisades Nuclear Plant RESTARTED ORGANIZATION CHART RECEIPT INSPECTOR MGR, SUPPLY CHAIN John Kasishke (Staff: 18)
Receipt Inspector NBU -
SUPV, PROCUREMENT PROCUREMENT SPECIALIST (4)
PROCUREMENT ENG (2)
HOLTEC OPERATIONS FIELD SUPV, (SRO)
(5)
ASST OPS MGR - SHIFT MGR,SHIFT SUPV, CONTROL ROOM (5)
SE/STA (5)
- SUPV, CONTROL ROOM
- Final placementTBD as CRS, Field Supv, SE/STA Palisades Nuclear Plant RESTARTED ORGANIZATION CHART SR MGR, OPERATIONS (Staff: 88)
Adam Eastridge ASST OPS MGR -
TRAINING -
ADMIN ASSISTANT SUPV, wee (SRO)
(4)
SPECIALIST, OPS (2)
FIRE/FLEX MARSHAL NCO WORK SUPPORT(NPO)
(1) 6
- March 2025 Approved Additions (10)
Title isTBD 07-07-2025
HOLTEC MAINTENANCE Palisades Nuclear Plant RESTARTED ORGANIZATION CHART SR MGR, MAINTENANCE Vacant (Staff:104)
(Including Production)
DPIC, MTNCE SUPT, MECHANICAL MTNCE SUPT, ELECTRICAL SUPT, I &C COORDINATORS, DEPT SUPT, FIN TEAM SUPERVISOR, FIN TEAM TOOLKEEPER COORililiiliNLINE MAINTENANCE SPECIALIST (2)
SUPERVISORS, MECH MTNCE (4)
LEADS, MECHANICAL MAINTENANCE SPECIALIST SUPERVISORS, ELECT MTNCE (4)
LEADS, ELECTRICIAN 7
C01ililii'LINE MAINTENANCE SPECIALIST (2)
SUPERVISORS, l&C MTNCE (4) l&CTECH 07-07-2025
HOLTEC PRODUCTION SUPV, PLANNING PLANNERS ADMIN ASSISTANT Palisades Nuclear Plant RESTARTED ORGANIZATION CHART MGR, PRODUCTION Doug Albee (Staff: 21) 8 SUPV, WORK CONTROL (4
COORD, PROD OUTAGE (3) 07-07-2025
HOLTEC CHEMISTRY I
SUPV, CHEMISTRY RADIOCHEMISTRY TECH (11)
Palisades Nuclear Plant RESTARTED ORGANIZATION CHART
- MGR, CHEMISTRY Michael Lee
( Staff: 20) 9 SUPV, CHEMISTRY (Tech)
CHEMICAL SPECIALIST 07-07-2025
HOLTEC Palisades Nuclear Plant Radiation Protection SUPV, RAD OPERATIONS RP TECHNICIAN (8)
SUPT, RAD OPERATIONS SUPV, RAD OPERATIONS RP TECHNICIAN RESTARTED ORGANIZATION CHART MGR, RAD PRO Gerald Wright (Staff: 41)
SUPV, RAD SUPPORT ADMIN ASSISTANT SHIPPING SPECIALIST RP TECHNICIAN 2
RADWASTE HANDLER 10 SUPT, RAD TECHNICAL HP SPECIALIST RP TECHNICIAN ALARA SPECIALIST 07-07-2025
HOLTEC EMERGENCY PREPAREDNESS l I
Instruct or, EP Palisades Nuclear Plant RESTARTED ORGANIZATION CHART MGR, EP Kami Miller (STAFF:5)
II EPOPS (R)
II 11
~
EPPla nner (2) 07-07-2025
HOLTEC Projects COORDINATOR, PROJECT CONTROLS PROJECT MGR, RX SERVICES -
Palisades Nuclear Plant SUPT, PROJECTS RESTARTED ORGANIZATION CHART SR MGR, PROJECTS Nate Demaster (Staff: 28)
(Including Outage)
MGR,OUTAGE -
SUPT, MAINT SERVICES ADMIN ASSISTANT PROJECT MGR, TURBINE LEAD BUILDINGS UTILITY WORKER SUPV, FACILITES -
1----i---.l BUILDING UTILITY WORKER 1-----1------1 UPV, MODIFICATION (5)
PROJECT MGR, STEAM GEN 1----------1 PROJECT MANAGER (3)
SUPV, CONSTRUCTION/
FIELD ENGINEER (2) 12 07-07-2025
HOLTEC OUTAGE I
LEAD OUTAGE SCHEDULER OUTAGE SCHEDULER (2)
Palisades Nuclear Plant RESTARTED ORGANIZATION CHART MGR, OUTAGES Vacant (Staff: 6) 13 OUTAGE SRO (Rotate)
OUTAGE STAFF OPERATIONS (Rotate) 07-07-2025
HOLTEC Regulatory Assurance ADMINASST -
INSPECTION COORDINATOR (1) -
I Palisades Nuclear Plant RESTARTED ORGANIZATION CHART MGR, REG ASSUR Frank Sienczak (Staff: 11)
SUPV, REGULATORY ASSURANCE/RECORDS SPECIALIST, COMPLIANCE (1)
LEAD RECORDS COORDINATOR 14 ENGINEER, LICENSING (2)
RECORDS SPECIALIST (3) 07-07-2025
HOLTEC Security SUPV, ACCESS AUTHORIZATION ACCESS COORDINATOR (4)
SOSA TEAM sss (6)
OFFICERS (36)
Palisades Nuclear Plant RESTARTED ORGANIZATION CHART
- MGR, SECURITY Scott Summers (Staff: 183)
SUPERINTENDENT ASST,ADMIN SOSBTEAM sss (6)
OFFICERS (36)
SOSCTEAM sss (5)
OFFICERS (36) 15 SOSDTEAM sss (5)
OFFICERS (33)
SR SUPERVISOR, TRAINING SUPV, SEC TRAINING (4)
SR SUPERVl~gR, SECURITY 07-07-2025
HOLTEC TRAINING Palisades Nuclear Plant RESTARTED ORGANIZATION CHART MGR, TRAINING Michael Bailey (Staff: 37)
INSTRUCTOR, GET SUPT, OPS TRAINING (2)
SUPT, MTNCE/TECH TRNG INSTRUCTOR, MECHANICAL1------1 INSTRUCTOR, ELECTRICAL 1------1 INSTRUCTOR, l&C INSTRUCTOR, RP INSTRUCTOR, CHEMISTRY 1------1 INSTRUCTOR, ENG SUP 1-------1 INSTRUCTIONAL TECHNOLOGIST Coty Dover 16 SUPV, OPS TRAINING (2)
INSTRUCTORS, LEAD (2)
INSTRUCTORS, OPS (14)
EXAM WRITERS (2)
LMS COORDINATOR COORDINATORS, TRAINING (2) 07-07-2025
HOLTEC FINANCE Palisades Nuclear Plant ANALYST, O&M -
ANALYST, OUTAGE RESTARTED ORGANIZATION CHART MGR, FINANCE Chad Burton Reports to HDI CFO (Staff: 7) 17 ANALYST, CAPITAL ANALYST, FINANCE 07-07-2025
HOLTEC Palisades Nuclear Plant QA Organization & ECP Supplier Surveillance Inspector AUDITOR (3)
(Staff: 12)
SUPERVISOR, QA INSPECTOR, QC (2)
RESTARTED ORGANIZATION CHART VP, LICENSING, REG ASSURANCE & PSA Jean Fleming (Staff: 14)
SUPERVISOR, QA SUPPLIER AUDITOR (3) 18 MGR, ECP 07-07-2025
HOLTEC IT CYBER SECURITY ENGINEER I
Palisades Nuclear Plant RESTARTED ORGANIZATION CHART
- MGR, IT Rod Glitz (Staff: 11)
CONSULTANTS, IT (4)
- ORACLE DATABASE ADMINISTRATOR
- LINUX ADMINISTRATOR
- Report to
& are located in Camden 19 SPECIALISTS, IT (5) 07-07-2025