Cover Letter - Report for the Regulatory Audit Regarding Westinghouse Electric Companys Nuclear Design Methodology Topical Report (Cac/Epid No. 00431/L-2024-TOP-0020)
ML25184A370
Person / Time
Site: 99902079
Issue date: 12/03/2025
From: Vechioli-Feliciano L
NRC/NRR/DANU/UAL2
To: Schoedel A
Westinghouse
Vechioli-Feliciano L
Shared Package
ML25184A372 List:
References
EPID L-2024-TOP-0020, CAC 00431
Download: ML25184A370 (0)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION Mr. Anthony Schoedel, Director eVinci Licensing & Regulatory Affairs Westinghouse Electric Company, LLC.

51 Bridge Street Pittsburgh, PA 15223

SUBJECT:

REPORT FOR THE REGULATORY AUDIT REGARDING WESTINGHOUSE ELECTRIC COMPANY LLCS NUCLEAR DESIGN METHODOLOGY TOPICAL REPORT (CAC/EPID NO. 00431/L-2024-TOP-0020)

Dear Mr. Schoedel,

By letter dated May 15, 2024, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24137A244), Westinghouse Electric Company, LLC (Westinghouse) submitted Revision 0 of Topical Report EVR-LIC-RL-002-P/NP, Nuclear Design Methodology Topical Report, for the U.S. Nuclear Regulatory Commission (NRC) staffs review.

The NRC staff conducted this regulatory audit as part of its review to gain an understanding and to seek clarification of the information provided in the topical report that required having access to the supporting information. In preparation for the audit, the NRC staff shared the draft audit plan via the electronic reading room with Westinghouse and later sent the audit plan by e-mail on December 4, 2024, (ML24324A382). The audit kick-off meeting was held on November 22, 2024, (ML24324A380) and the audit was conducted from November 22, 2024, through April 23, 2025. The NRC staffs report for the regulatory audit conducted in connection with its review of the TR is provided as an enclosure.

The Enclosure to this letter contains proprietary information. When separated from the Enclosure, this letter is DECONTROLLED.

December 3, 2025

OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION If you have any questions regarding this audit, please contact me at (301) 415-6035 or via email at Lucieann.VechioliFeliciano@nrc.gov.

Sincerely, Lucieann Vechioli Feliciano, Project Manager Advanced Reactors Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 99902079

Enclosure:

As stated.

cc: schoedaj@westinghouse.com spaldiaj@westinghouse.com Signed by Vechioli, Lucieann on 12/03/25

Package: ML25184A372 Letter: ML25184A370 : ML25184A371 (Proprietary) : ML25245A157 (Nonproprietary)

NRR-106 OFFICE NRR/DANU/UAL2:PM NRR/DANU/UAL2:LA NRR//DANU/UATB3:BC NAME LVechioli CSmith GOberson DATE 07/09/2025 07/22/2025 7/23/2025 OFFICE NRR/DANU/UAL2:BC(A)

NRR/DANU/UAL2:PM NAME SPhilpott LVechioli DATE 8/1/2025 12/3/2025