ML23080A045
From kanterella
Jump to navigation
Jump to search
Letter Sequence Request | |
|---|---|
CAC:00431, (Open) EPID:L-2023-TOP-0024, Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) (Approved, Closed) | |
Initiation Administration Questions
Results
Other: ML22119A129, ML22353A642, ML23156A553, ML23199A317, ML23248A199, ML24192A252, ML24236A768, ML24256A100, ML24297A140, ML25017A240, ML25022A004, ML25190A667, ML25230A055 | |
MONTHYEARML21288A1732021-10-0808 October 2021
[Table View]Submission of X Energy, LLC (X-energy) Xe-100 Licensing Topical Report: Transient and Safety Analysis Methodologies Framework Project stage: Request ML22119A1292022-05-0909 May 2022 X Energy LL Audit Plan for Transient and Safety Analysis Methodology Framework Topical Report Project stage: Other ML22277A8242022-10-0404 October 2022 Submittal of Terrapower, LLC Topical Report, Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces Project stage: Request ML22353A6422023-01-0505 January 2023 Terrapower - Audit Plan - Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces Project stage: Other ML23024A2812023-01-24024 January 2023 Submittal of Terrapower Topical Report, Principal Design Criteria for the Natrium Advanced Reactor Project stage: Request ML24325A3772023-03-20020 March 2023 Revised Draft SE Natrium EPZ TR Project stage: Draft Approval ML23080A0452023-03-20020 March 2023 Submittal of Terrapower Plume Exposure Pathway Emergency Planning Zone Methodology Topical Report Project stage: Request ML23156A5532023-06-0707 June 2023 Cover Letter - Terrapower - Fuel and Control Assembly Qualification Audit Plan TP-LIC-LET-0051 Project stage: Other ML23158A2002023-06-12012 June 2023 NRC 898 -Topical Report Completeness Determination for Terrapower, LLC Plume Exposure Pathway Emergency Planning Zone Methodology Topical Report Project stage: Other ML23158A2032023-06-12012 June 2023 Email Transmitting NRC Form 898 for Terrapower, LLC TR Plume Exposure Pathway Emergency Planning Zone Project stage: Other ML23199A3172023-08-11011 August 2023 Terrapower - Audit Plan - Emergency Planning Zone (EPZ) Project stage: Other ML23248A1992023-09-0101 September 2023 Terrapower - Audit Plan - Volcanic Hazards -TP-LIC-LET-0070 Project stage: Other ML24008A0622024-01-0808 January 2024 Enclosure - Audit Report - Terrapower - Emergency Planning Zone (EPZ) Sizing Project stage: Other ML24008A0612024-01-0808 January 2024 Audit Report Letter - Terrapower - Emergency Planning Zone (EPZ) Sizing Project stage: Other ML24242A1012024-03-20020 March 2024 Terrapower, LLC – Draft Safety Evaluation of Natrium Topical Report Nat-3056, Plume Exposure Pathway Emergency Planning Zone Sizing Methodology, Revision 1 (EPID L-2023-TOP-0024/CAC 000431) Project stage: Draft Approval ML24192A2522024-07-23023 July 2024 Acceptance Completeness Determination Transmittal Email for the SMR LLC (Holtec) Risk Significance Topical Report Project stage: Other ML24208A1812024-07-26026 July 2024 Transmittal of Terrapower, LLC, Radiological Release Consequences Methodology Topical Report, NAT-9391 Revision 0 Project stage: Request ML24236A7682024-08-29029 August 2024 NRC Audit Plan - X-energy Evaluation Methods Topical Reports Project stage: Other ML24256A0992024-09-12012 September 2024 Evinci TRISO Fuel Qualification Methodology TR Acceptance Review Form 898 Project stage: Acceptance Review ML24256A1002024-09-13013 September 2024 Evinci TRISO Fuel Method TR Acceptability Transmittal Email Project stage: Other ML24297A1402024-10-24024 October 2024 Email - Terrapower, LLC - Audit Plan for Topical Report: Reactor Seismic Isolation System Qualification, Revision 0 (Cac/Epid No. 000431/L-2024-TOP-0005) Project stage: Other ML25017A2402025-01-21021 January 2025 E-mail Transmitting WEC Evinci PDC TR -A Verification Project stage: Other ML25022A0042025-01-28028 January 2025 Transmittal Email Containing Audit Plan for Evinci TRISO Fuel Qualification Methodology Topical Report Project stage: Other ML25076A6572025-03-28028 March 2025 Letter - Final SE EPZ Project stage: Approval ML25065A2502025-03-28028 March 2025 Final SE Natrium EPZ TR Project stage: Approval ML25136A3422025-08-0808 August 2025 Terrapower, LLC (Terrapower) Natrium Topical Report: Plume Exposure Pathway Emergency Planning Zone Methodology -A 896 Project stage: Other ML25190A6672025-08-21021 August 2025 Letter - Westinghouse Electric Co. Regulatory Audit Report Regarding TRISO Fuel Design Methodology for the Evinci Microreactor Topical Report Project stage: Other ML25230A0552025-08-21021 August 2025 Enclosure 2 - Westinghouse Electric Company - Audit Report for Evinci TRISO Fuel Design Methodology Topical Report - Non-proprietary Version Project stage: Other 2024-10-24 |
| ML23080A045 | |
| Person / Time | |
|---|---|
| Site: | 99902100 |
| Issue date: | 03/20/2023 |
| From: | Sprengel R TerraPower |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| TP-LIC-LET-0060 | |
| Download: ML23080A045 (1) | |
Similar Documents at 99902100 | |
|---|---|
Retrieved from "https://kanterella.com/w/index.php?title=ML23080A045&oldid=5528438"