MONTHYEARML21288A1732021-10-0808 October 2021 Submission of X Energy, LLC (X-energy) Xe-100 Licensing Topical Report: Transient and Safety Analysis Methodologies Framework Project stage: Request ML22119A1292022-05-0909 May 2022 X Energy LL Audit Plan for Transient and Safety Analysis Methodology Framework Topical Report Project stage: Other ML22277A8242022-10-0404 October 2022 Submittal of Terrapower, LLC Topical Report, Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces Project stage: Request ML22353A6422023-01-0505 January 2023 Terrapower - Audit Plan - Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces Project stage: Other ML23024A2812023-01-24024 January 2023 Submittal of Terrapower Topical Report, Principal Design Criteria for the Natrium Advanced Reactor Project stage: Request ML23080A0452023-03-20020 March 2023 Submittal of Terrapower Plume Exposure Pathway Emergency Planning Zone Methodology Topical Report Project stage: Request ML23156A5532023-06-0707 June 2023 Cover Letter - Terrapower - Fuel and Control Assembly Qualification Audit Plan TP-LIC-LET-0051 Project stage: Other ML23199A3172023-08-11011 August 2023 Terrapower - Audit Plan - Emergency Planning Zone (EPZ) Project stage: Other ML23248A1992023-09-0101 September 2023 Terrapower - Audit Plan - Volcanic Hazards -TP-LIC-LET-0070 Project stage: Other ML24089A2442024-03-27027 March 2024 X Energy, LLC (X-energy), Submittal of Xe-100 Licensing Topical Report: Xe-100 Training Programs Methodology Project stage: Request ML24194A0232024-07-19019 July 2024 PDC Acceptability Review Email Transmitting 898 Form Project stage: Other ML24194A0242024-07-19019 July 2024 Evinci Nuc Design Method 898-form.pdf Project stage: Other ML24192A2522024-07-23023 July 2024 Acceptance Completeness Determination Transmittal Email for the SMR LLC (Holtec) Risk Significance Topical Report Project stage: Other ML24236A7682024-08-29029 August 2024 NRC Audit Plan - X-energy Evaluation Methods Topical Reports Project stage: Other ML24297A1402024-10-24024 October 2024 Email - Terrapower, LLC - Audit Plan for Topical Report: Reactor Seismic Isolation System Qualification, Revision 0 (Cac/Epid No. 000431/L-2024-TOP-0005) Project stage: Other ML24324A3802024-12-0404 December 2024 Westinghouse Electric Company, LLC, Audit Plan for Topical Report on the Nuclear Design Methodology of the Evincitm Microreactor Project stage: Other ML24324A3812024-12-0606 December 2024 Email-WEC Audit Plan for NDM TR Project stage: Other ML25190A6672025-08-21021 August 2025 Letter - Westinghouse Electric Co. Regulatory Audit Report Regarding TRISO Fuel Design Methodology for the Evinci Microreactor Topical Report Project stage: Other ML25230A0552025-08-21021 August 2025 Enclosure 2 - Westinghouse Electric Company - Audit Report for Evinci TRISO Fuel Design Methodology Topical Report - Non-proprietary Version Project stage: Other ML25245A1572025-12-0303 December 2025 Enclosure 2 Report for the Regulatory Audit Regarding Westinghouse Electric Companys Nuclear Design Methodology Topical Report- Nonproprietary Project stage: Other ML25184A3702025-12-0303 December 2025 Cover Letter - Report for the Regulatory Audit Regarding Westinghouse Electric Companys Nuclear Design Methodology Topical Report (Cac/Epid No. 00431/L-2024-TOP-0020) Project stage: Other 2023-09-01
[Table View] |
Text
From:
To:
Cc:
Subject:
Date:
Attachments:
Patrick Boyle Schoedel, Anthony J Stephen Philpott; Greg Oberson (He/Him); Michelle Vega Rodriguez (She/Her)
Westinghouse - Form 898 Completeness Determination for eVinci Microreactor Nuclear Design Methodology Topical Report Friday, July 19, 2024 12:31:00 PM Mr. Schoedel:
Attached is the U.S. Nuclear Regulatory Commission (NRC) staff completeness determination for Westinghouse eVinci Nuclear Design Methodology Topical Report (EVR_LIC_RL_002-P/NP).
Based on a preliminary review of the report, the NRC staff determined that it provides sufficient information for the NRC staff to begin a detailed technical review.
The NRC staff plans to issue the Draft Safety Evaluation by May 31, 2025, and the Final Safety Evaluation by July 30, 2025. If the NRC staff determines that a regulatory audit may be beneficial to review related design information, an audit plan will be developed by November 18, 2024. If necessary, the NRC staff will issue requests for additional information (RAIs) by December 30, 2024. The NRC staff estimates a level of effort of 390 hours0.00451 days <br />0.108 hours <br />6.448413e-4 weeks <br />1.48395e-4 months <br /> will be needed to complete the technical review, present to the Advisory Committee for Reactors Safeguards (ACRS) and issue the Final Safety Evaluation. The schedule and level of effort could change due to several factors such as the need for additional rounds of RAIs, unanticipated changes to the scope of the review, vendor delays, unsolicited supplements to the topical report, unexpected ACRS involvement, etc. The NRC staff will communicate any changes to the review schedule or estimated NRC staff hours including the reason(s) for the changes.
If you have any questions, please feel free to contact me at 301-415-3936 or by email at Patrick.Boyle@nrc.gov.
Project No.: 99902079 EPID: L-2024-TOP-0020 Patrick G. Boyle Project Manager NRR/DANU/UAL2 Phone: 301-415-3936