MONTHYEARML21288A1732021-10-0808 October 2021 Submission of X Energy, LLC (X-energy) Xe-100 Licensing Topical Report: Transient and Safety Analysis Methodologies Framework Project stage: Request ML22119A1292022-05-0909 May 2022 X Energy LL Audit Plan for Transient and Safety Analysis Methodology Framework Topical Report Project stage: Other ML22277A8242022-10-0404 October 2022 Submittal of Terrapower, LLC Topical Report, Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces Project stage: Request ML22353A6422023-01-0505 January 2023 Terrapower - Audit Plan - Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces Project stage: Other ML23024A2812023-01-24024 January 2023 Submittal of Terrapower Topical Report, Principal Design Criteria for the Natrium Advanced Reactor Project stage: Request ML23080A0452023-03-20020 March 2023 Submittal of Terrapower Plume Exposure Pathway Emergency Planning Zone Methodology Topical Report Project stage: Request ML23156A5532023-06-0707 June 2023 Cover Letter - Terrapower - Fuel and Control Assembly Qualification Audit Plan TP-LIC-LET-0051 Project stage: Other ML23199A3172023-08-11011 August 2023 Terrapower - Audit Plan - Emergency Planning Zone (EPZ) Project stage: Other ML23248A1992023-09-0101 September 2023 Terrapower - Audit Plan - Volcanic Hazards -TP-LIC-LET-0070 Project stage: Other ML24089A2442024-03-27027 March 2024 X Energy, LLC (X-energy), Submittal of Xe-100 Licensing Topical Report: Xe-100 Training Programs Methodology Project stage: Request ML24163A3982024-06-11011 June 2024 SMR, LLC, Submittal of Holtec PSA Risk Significance Determination Methodology Licensing Topical Report Project stage: Request ML24194A0242024-07-19019 July 2024 Evinci Nuc Design Method 898-form.pdf Project stage: Other ML24194A0232024-07-19019 July 2024 PDC Acceptability Review Email Transmitting 898 Form Project stage: Other ML24192A2332024-07-23023 July 2024 Package for SMR-Holtec Risk Significance Methodology Topical Report Acceptance Review Project stage: Request ML24192A2342024-07-23023 July 2024 Form 898 SMR-Holtec Risk Significance Methodology Topical Report Acceptance Review Project stage: Acceptance Review ML24192A2522024-07-23023 July 2024 Acceptance Completeness Determination Transmittal Email for the SMR LLC (Holtec) Risk Significance Topical Report Project stage: Other ML24211A2262024-08-0606 August 2024 SMR Holtec Risk Significance Methodology Topical Report - Audit Plan Project stage: Other ML24236A7682024-08-29029 August 2024 NRC Audit Plan - X-energy Evaluation Methods Topical Reports Project stage: Other ML24297A1402024-10-24024 October 2024 Email - Terrapower, LLC - Audit Plan for Topical Report: Reactor Seismic Isolation System Qualification, Revision 0 (Cac/Epid No. 000431/L-2024-TOP-0005) Project stage: Other ML25190A6672025-08-21021 August 2025 Letter - Westinghouse Electric Co. Regulatory Audit Report Regarding TRISO Fuel Design Methodology for the Evinci Microreactor Topical Report Project stage: Other ML25230A0552025-08-21021 August 2025 Enclosure 2 - Westinghouse Electric Company - Audit Report for Evinci TRISO Fuel Design Methodology Topical Report - Non-proprietary Version Project stage: Other ML25245A1572025-12-0303 December 2025 Enclosure 2 Report for the Regulatory Audit Regarding Westinghouse Electric Companys Nuclear Design Methodology Topical Report- Nonproprietary Project stage: Other ML25184A3702025-12-0303 December 2025 Cover Letter - Report for the Regulatory Audit Regarding Westinghouse Electric Companys Nuclear Design Methodology Topical Report (Cac/Epid No. 00431/L-2024-TOP-0020) Project stage: Other 2023-09-01
[Table View] |
Text
From:
Manny Sayoc To:
Andrew Brenner Cc:
India Banks; Carolyn Lauron; Michelle Hayes; Clark Shurtleff
Subject:
NRC Form 898 - SMR-Holtec Risk Significance Methodology Topical Report Acceptance Review.
Date:
Tuesday, July 23, 2024 12:38:00 PM Attachments:
NRC 898 - Risk Significance TR V3 Final.pdf Importance:
High Mr. Andrew Brenner Director of Licensing, SMR, LLC
Mr. Brenner,
Attached to this email youll find the completed form for the U.S. Nuclear Regulatory Commission staff topical report completeness determination for the submittal of the SMR, LLC Submittal of Holtec PSA Risk Significance Determination Methodology Licensing Topical Report (Project No. 99902049). This form provides the determination, but also provides key milestone dates and an estimate of review hours. The review schedule assumes a 30-day response to RAIs. The dates and resource estimates could change due to several factors, such as the timeframe for resolution of technical issues, or other unanticipated factors.
If you have any questions, please let me know.
Docket No.: 99902049Thank You,
Thank You, Very Respectfully, Emmanuel Manny Sayoc Safety and Environmental Project Manager NRR/DNRL/NLIB 301-415-4084 emmanuel.sayoc@nrc.gov