ML25038A007

From kanterella
Jump to navigation Jump to search

Orano Enrichment: Pre-Application Meeting - Environmental Report
ML25038A007
Person / Time
Site: 07007038
Issue date: 02/27/2025
From:
Orano Enrichment USA
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML25037A242 List:
References
OE-25-0003, EPID L-2024-NEW-0007
Download: ML25038A007 (1)


Text

Orano Enrichment USA IKE Enrichment Facility Pre-application Meeting - Environmental Report February 27, 2025 NRC Headquarters - Bethesda, MD OPI 0 UNRESTRICTED

01 INTRODUCTION 02 SITE DESCRIPTION 03 PROJECT OVERVIEW 04 SCHEDULE and STAKEHOLDERS 05

SUMMARY

Introduction 01

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Environmental Report 4

Meeting Overview

  • Orano requested a pre-application meeting related to the Environmental Report submittal for Project IKE in Oak Ridge Tennessee
  • Orano will be submitting a Part 70 License Application for an Enrichment Facility
  • Orano has requested an exemption to bifurcate the safety and environmental reviews 01

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Environmental Report 5

Meeting Objectives

  • Inform the NRC about scheduling plans
  • Provide an overview of the site
  • Discuss relevant proximate environmental investigations
  • Discuss unique features of the site
  • Discuss resource and time saving actions related to environmental reviews from nearby facilities 01

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Environmental Report 6

Meeting Takeaways

  • We will leverage existing, under review and reviewed, and approved documentation to the extent possible to reduce schedule, costs, and review time for the appropriate environmental resources such as:

o Meteorology o Noise o Cultural and Historical o Infrastructure o Transportation o Socioeconomic o Etc.

  • We would like to discuss the appropriate way to reference already approved documentation and documentation under review
  • We want to know if there can be consideration of assigning NRC staff who are familiar with previous, recent proximate reviews work on this review 01

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Environmental Report 7

Project Team / POC

  • Orano (Licensee) o Peter Vescovi, Licensing Lead o Lionel Antognelli, Principal Investigator o Matt Lucas, Project Manager o Remi Flageollet, Business Support
  • Boston Government Services (Environmental Report Development) o Lou Qualls, Principal Investigator o David Tiktinsky, Senior Licensing Advisor o Eric Patterson, Project Manager
  • Kiewit (Construction)
  • DOE (Current site owner)
  • United Cleanup Oak Ridge, LLC (UCOR - Site manager) 01

Site Description 02

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Environmental Report 9

Site Overview ORETTC Site is ~675 acres on the Oak Ridge Reservation denoted SSP-2

  • ORETTC Facility was built on 80+ acres adjacent to this site.
  • Site is mostly undeveloped, but one section was used as a holding site for radioactive components (White Wing Scrapyard)
  • Site is serviced by 2 major highways (57 and 95) both leading to Interstate I-40 02

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Environmental Report 10 Distances to Major Infrastructure

~2.5 miles to Oak Ridge National Laboratory which housed the High Flux Isotope Reactor and the Spallation Neutron Source 02

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Environmental Report 11 Distance TRISO X Fuel Fabrication Facility

~1.5 and across the street from TRISO-X Site 02

OPI 0 UNRESTRICTED l IKE Enrichment Facility - Pre-application Meeting - Environmental Report 12 TVA Clinch River Nuclear Site Emergency Planning Zone The site is well outside of TVAs 2-mile Emergency Planning Zone 02

Project Overview 03 Proprietary information withheld pursuing to 10 CFR 2.390

Schedule and Stakeholders 04 Proprietary information withheld pursuing to 10 CFR 2.390

Summary 05 Proprietary information withheld pursuing to 10 CFR 2.390