MONTHYEARML23045A2642023-02-24024 February 2023 E-Mail - NRC Withholding Determination Form 897 for the Slides for Closed Meeting with Electric Power Research Institute on BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shroud Project stage: Meeting ML23045A2652023-02-24024 February 2023 NRC Withholding Determination Form 897 for the Slides for Closed Meeting with Electric Power Research Institute on BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shroud (EPID Project stage: Meeting ML23214A0532023-09-14014 September 2023 E-mail - NRC Completion Determination Form 898 and Proprietary Determination Form 898 for BWRVIP-100, Revision 2, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel Project stage: Other ML23214A0692023-09-14014 September 2023 BWRVIP-100, Rev 2, Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds - NRC 898,Topical Report Completeness Determination Project stage: Other ML23214A0722023-09-14014 September 2023 BWRVIP-100, Rev 2, Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds - NRC 897, Topical Report Withholding Determination Project stage: Other ML23011A3422023-10-30030 October 2023 February 27, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (EPID L-2023-TOP-0018) - Memo Project stage: Meeting ML23060A0972023-10-30030 October 2023 February 27, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (EPID L-2023-TOP-0018) - Enclosure 3 - at Project stage: Meeting ML24036A0052024-02-12012 February 2024 E-Mail - Final Request for Additional Information - BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for Boiling Water Reactor (BWR) Internal Components Project stage: RAI ML24036A0072024-02-12012 February 2024 Redacted - Enclosure 2 - Final Request for Additional Information - BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for Boiling Water Reactor (BWR) Internal Components (EPID L-2023-NTR-0005 Project stage: RAI ML24219A0532024-09-12012 September 2024 Summary of August 2024 Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components Project stage: RAI ML24219A0802024-09-12012 September 2024 Attendees List for August 2024 Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components Project stage: RAI ML24219A0762024-09-12012 September 2024 August 2024 Summary of Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components Project stage: RAI ML24255A0022024-09-23023 September 2024 Change in Estimated Review Schedule for BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components Project stage: Other ML25023A0922025-03-21021 March 2025 E-mail - Draft Safety Evaluation Associated with EPRI Technical Report BWRVIP-100, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components, Revision 2 Project stage: Draft Approval 2024-02-12
[Table View] |
Text
September 12, 2024 MEMORANDUM TO:
Gerond A. George, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Demetrius Murray, Project Manager
/RA/
Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF AUGUST 2024, MEETINGS TO DISCUSS RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION FOR TECHNICAL REPORT BWRVIP-100, REVISION 2, UPDATED ASSESSMENT OF THE FRACTURE TOUGHNESS OF IRRADIATED STAINLESS STEEL FOR BWR INTERNALS COMPONENTS (EPID L-2023-NTR-0005)
In an August 7, 2024, closed meeting and an August 21, 2024, observation meeting, the U.S.
Nuclear Regulatory Commission (NRC) staff met with representatives of the Electric Power Research Institute (EPRI) to discuss EPRIs responses (ADAMS Accession No. ML24131A043) to the NRC staffs requests for additional information (ADAMS Accession No. ML24036A003) regarding EPRI Technical Report BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components. The meeting summary is Enclosure 1, and the list of attendees is Enclosure 2.
If you have any questions or comments, please contact me via e-mail at demetrius.murray@nrc.gov.
Docket No. 9902016
Enclosures:
- 1. Meeting Summary
- 2. List of Attendees CONTACT: Demetrius Murray, NRR/DORL/LLPB 301-415-7646
ML24219A053
^via eConcurrence NRR-106 OFFICE DORL/LLPB/PM DORL/LLPB/LA DSS/SNFB/BC DNRL/NVIB/BC NAME DMurray^
DHarrison^
SKrepel^
ABuford^
DATE 08/29/2024 09/11/2024 09/11/2024 09/11/2024 OFFICE DORL/LLPB/BC DORL/LLPB/PM NAME GGeorge^
DMurray^