MONTHYEARML23045A2582023-02-24024 February 2023 U. S. Nuclear Regulatory Commission Withholding Determination Form 897 for the Slides for Technical Exchange Closed Meeting with Electric Power Research Institute on the Update to BWRVIP-100, Updated Assessment of the Fracture Toughness of Project stage: Request ML23045A2642023-02-24024 February 2023 E-Mail - NRC Withholding Determination Form 897 for the Slides for Closed Meeting with Electric Power Research Institute on BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shroud Project stage: Meeting ML23045A2652023-02-24024 February 2023 NRC Withholding Determination Form 897 for the Slides for Closed Meeting with Electric Power Research Institute on BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shroud (EPID Project stage: Meeting ML23198A3332023-05-31031 May 2023, 11 July 2023 Submittal of BWRVIP-100, Rev. 2, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components Project stage: Request ML23198A3342023-07-11011 July 2023 Submittal of BWRVIP-100, Rev. 2, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components Project stage: Request ML23198A2342023-07-17017 July 2023 (52-025; 52-026), Single Positive Test Form Collected on 05/10/2023 Project stage: Request ML23214A0722023-09-14014 September 2023 BWRVIP-100, Rev 2, Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds - NRC 897, Topical Report Withholding Determination Project stage: Other ML23214A0692023-09-14014 September 2023 BWRVIP-100, Rev 2, Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds - NRC 898,Topical Report Completeness Determination Project stage: Other ML23214A0532023-09-14014 September 2023 E-mail - NRC Completion Determination Form 898 and Proprietary Determination Form 898 for BWRVIP-100, Revision 2, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel Project stage: Other ML23060A0972023-10-30030 October 2023 February 27, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (EPID L-2023-TOP-0018) - Enclosure 3 - at Project stage: Meeting ML23011A3422023-10-30030 October 2023 February 27, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (EPID L-2023-TOP-0018) - Memo Project stage: Meeting ML24036A0052024-02-12012 February 2024 E-Mail - Final Request for Additional Information - BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for Boiling Water Reactor (BWR) Internal Components Project stage: RAI ML24036A0072024-02-12012 February 2024 Redacted - Enclosure 2 - Final Request for Additional Information - BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for Boiling Water Reactor (BWR) Internal Components (EPID L-2023-NTR-0005 Project stage: RAI ML24219A0532024-09-12012 September 2024 Summary of August 2024 Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components Project stage: RAI ML24219A0802024-09-12012 September 2024 Attendees List for August 2024 Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components Project stage: RAI ML24219A0762024-09-12012 September 2024 August 2024 Summary of Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components Project stage: RAI ML24255A0022024-09-23023 September 2024 Change in Estimated Review Schedule for BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components Project stage: Other ML25023A0922025-03-21021 March 2025 E-mail - Draft Safety Evaluation Associated with EPRI Technical Report BWRVIP-100, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components, Revision 2 Project stage: Draft Approval ML25202A1192025-12-12012 December 2025 E-mail - Transmittal: NRC Forms 896, -A Topical Report Verification, for BWRVIP-100, Rev 2, Updated Assessment of the Fracture Toughness of Irradiated SS for BWR Internal Comps Project stage: Other ML25202A1222025-12-12012 December 2025 BWRVIP-100, Revision 2 - NRC Form 896, - a Topical Report Verification Project stage: Other 2023-09-14
[Table View] |
Text
From:
Lois James To:
martin.bonifanti@constellation.com; Palm, Nathan Cc:
RidsNrrOd Resource; RidsNrrDnrl Resource; RidsNrrLADHarrison Resource; RidsNrrDorl Resource; RidsNrrDorlLlpb Resource; RidsACRS_MailCTR Resource; Lois James; Gerond George; Angie Buford; Scott Krepel; David Rudland; Michael Benson; John Tsao; Steven Levitus; Joseph Messina; wmcgruder@epri.com; npalm@epri.com; Carter, Bob
Subject:
Final Request for Additional Information - BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for Boiling Water Reactor (BWR) Internal Components (EPID L-2023-NTR-0005)
Date:
Monday, February 12, 2024 3:16:51 PM Martin Bonifanti, Constellation, BWRVIP Chairman Nathan Palm, EPRI, BWRVIP Program Manager Electric Power Research Institute 1300 West W.T. Harris Blvd Charlotte, NC 28262-8550
Mr. Bonifanti and Mr. Palm:
By letter dated July 11, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No.ML23198A333), Electric Power Research Institute (EPRI) submitted BWRVIP-100, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components, Revision 2, to the U.S. Nuclear Regulatory Commission (NRC) for review and approval. Revision 2 of BWRVIP-100 incorporations newly acquired test data from harvested reactor internals materials which may indicated a potential non-conservatism in BWRVIP-100, Rev. 1-A and reassess the relationship between fracture toughness and fluence. The staff reviewed and accepted the technical report on September 14, 2023 (ADAMS Accession No.ML23214A047).
The NRC staff in the Vessels Internal Branch (NVIB) in the Division of New and Renewed Licenses (DNRL) and in the Nuclear Methods and Fuel Analysis Branch (SFNB) in the Division of Safety Systems (DSS) is in the process of reviewing your application. Based on our review, the NRC staff has identified the attached final requests for additional information (RAIs).
The staffs request contains some proprietary materials. The proprietary contents are identified using a ((yellow highlighted, bolded, double bracketed)) text format. Consistent with the Commission proprietary withholding criteria in Section2.390 of Title10 of the Code of Federal Regulations (10CFR), the staff is protecting the identified proprietary material from public disclosure.
contains the proprietary version of the RAIs, and Enclosure 2 contains the redacted version of the RAIs. A copy of both Enclosures has been placed in the box.com folder. Nathan Palm and Wynter McGruder have been given access to the folder. This email and Enclosure 2 have been placed in ADAMS and will be publicly available on February 16, 2024.
These requests for additional information were discussed with Wynter McGruder, and a mutually agreeable date for the response is within 90 days from the date of this email.
If you have any questions, please contact me by e-mail Lois.James@nrc.gov.
Sincerely,
ML24036A003 (pkg); ML24036A005 (email); ML24036A006 (Enclosure 1 -
proprietary); ML24036A007 (Enclosure 2) +via RAI App *via email NRR-106 OFFICENRR/DORL/LLPB/PMNRR/DSS/SFNB/BCNRR/DNRL/NVIB/BCNRR/DORL/LLPB/BC NAME LJames SKrepel+
ABuford JTsao for*
GGeorge+
DATE 02/05/2024 01/19/2024 02/01/2024 02/05/2024 OFFICENRR/DORL/LLPB/PM
NAME LJames
DATE 02/12/2024