MONTHYEARML23045A2582023-02-24024 February 2023 U. S. Nuclear Regulatory Commission Withholding Determination Form 897 for the Slides for Technical Exchange Closed Meeting with Electric Power Research Institute on the Update to BWRVIP-100, Updated Assessment of the Fracture Toughness of Project stage: Request ML23045A2642023-02-24024 February 2023 E-Mail - NRC Withholding Determination Form 897 for the Slides for Closed Meeting with Electric Power Research Institute on BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shroud Project stage: Meeting ML23045A2652023-02-24024 February 2023 NRC Withholding Determination Form 897 for the Slides for Closed Meeting with Electric Power Research Institute on BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shroud (EPID Project stage: Meeting ML23198A3332023-05-31031 May 2023, 11 July 2023 Submittal of BWRVIP-100, Rev. 2, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components Project stage: Request ML23214A0722023-09-14014 September 2023 BWRVIP-100, Rev 2, Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds - NRC 897, Topical Report Withholding Determination Project stage: Other ML23214A0692023-09-14014 September 2023 BWRVIP-100, Rev 2, Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds - NRC 898,Topical Report Completeness Determination Project stage: Other ML23214A0532023-09-14014 September 2023 E-mail - NRC Completion Determination Form 898 and Proprietary Determination Form 898 for BWRVIP-100, Revision 2, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel Project stage: Other ML23011A3422023-10-30030 October 2023 February 27, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (EPID L-2023-TOP-0018) - Memo Project stage: Meeting ML23060A0972023-10-30030 October 2023 February 27, 2023, Meeting Summary: Pre-application Meeting for Submittal of a Revision to BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (EPID L-2023-TOP-0018) - Enclosure 3 - at Project stage: Meeting ML24036A0072024-02-12012 February 2024 Redacted - Enclosure 2 - Final Request for Additional Information - BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for Boiling Water Reactor (BWR) Internal Components (EPID L-2023-NTR-0005 Project stage: RAI ML24036A0052024-02-12012 February 2024 E-Mail - Final Request for Additional Information - BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for Boiling Water Reactor (BWR) Internal Components Project stage: RAI ML24219A0532024-09-12012 September 2024 Summary of August 2024 Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components Project stage: RAI ML24219A0802024-09-12012 September 2024 Attendees List for August 2024 Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components Project stage: RAI ML24219A0762024-09-12012 September 2024 August 2024 Summary of Meetings Responses to RAIs for Technical Report BWRVIP 100, Rev 2: Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internals Components Project stage: RAI ML24255A0022024-09-23023 September 2024 Change in Estimated Review Schedule for BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components Project stage: Other ML25023A0922025-03-21021 March 2025 E-mail - Draft Safety Evaluation Associated with EPRI Technical Report BWRVIP-100, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components, Revision 2 Project stage: Draft Approval ML25202A1222025-12-12012 December 2025 BWRVIP-100, Revision 2 - NRC Form 896, - a Topical Report Verification Project stage: Other ML25202A1192025-12-12012 December 2025 E-mail - Transmittal: NRC Forms 896, -A Topical Report Verification, for BWRVIP-100, Rev 2, Updated Assessment of the Fracture Toughness of Irradiated SS for BWR Internal Comps Project stage: Other 2024-02-12
[Table View] |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION October 30, 2023 MEMORANDUM TO:
Gerond A. George, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Lois M. James, Senior Project Manager /RA/
Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FEBRUARY 27, 2023, MEETING
SUMMARY
PRE-APPLICATION MEETING FOR SUBMITTAL OF A REVISION TO BWRVIP-100, UPDATED ASSESSMENT OF THE FRACTURE TOUGHNESS OF IRRADIATED STAINLESS STEEL FOR BWR CORE SHROUDS (EPID L-2023-TOP-0018)
On February 27, 2023, the U.S. Nuclear Commission (NRC) staff met with Electric Power Research Institute representatives to discuss the submittal of a revision to BWRVIP-100, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR [Boiling Water Reactor] Core Shrouds. The proprietary meeting summary is Enclosure 1, a nonproprietary version of the meeting summary is Enclosure 2, and the list of attendees is.
If you have any questions or comments, please contact me via e-mail at Lois.James@nrc.gov.
Docket No. 9990201
Enclosures:
- 1. Proprietary Meeting Summary
- 2. Nonproprietary Meeting Summary
- 3. List of Attendees CONTACT: Lois M. James, NRR/DORL/LLPB 301-415-3306 NOTICE: Enclosure 1 to this transmittal letter has proprietary information; once separated, this memorandum, Enclosure 2, and Enclosure 3 are decontrolled.
ML23011A341 (Package);
ML23011A342 (Memo - public);
ML23060A091 (Enclosure 1 - prop summary - nonpublic);
ML23060A094 (Enclosure 2 - nonprop summary - public);
ML23060A097 (Enclosure 3 - List of Attendees - public)
(NRC and EPRI slides are listed in summary)
^via eConcurrence
- via email NRR-106 OFFICE DORL/LLPB/PM DORL/LLPB/LA DNRL/NVIB DORL/LLPB/BC NAME LJames^
DHarrison^