NRR E-mail Capture - Robinson, Unit 2 - Acceptance of License Amendment Request to Adopt TSTF-258-A, Revision 4, for Changes to Technical Specification 5.7, High Radiation Area
ML23297A237
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/24/2023
From: Luke Haeg
Plant Licensing Branch II
To: Treadway R
Duke Energy Progress
References
L-2023-LLA-0140
Download: ML23297A237 (3)


Text

From:

Luke Haeg Sent:

Tuesday, October 24, 2023 2:26 PM To:

Ryan.Treadway@duke-energy.com Cc:

Duc, Joshua Brian; David Wrona

Subject:

Robinson, Unit 2 - Acceptance of License Amendment Request to Adopt TSTF-258-A, Revision 4, for Changes to Technical Specification 5.7, "High Radiation Area" (EPID L-2023-LLA-0140)

Dear Mr. Treadway,

By letter dated October 5, 2023 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML23278A247), Duke Energy Progress, LLC (Duke Energy, the licensee), submitted a license amendment request (LAR) for H. B. Robinson Steam Electric Plant, Unit No. 2 (Robinson). The proposed amendment would revise Technical Specification (TS) Section 5.7, High Radiation Area, consistent with NRC-approved TS Task Force (TSTF) traveler 258 (TSTF-258-A), Revision 4, Changes to Section 5.0, Administrative Controls.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine whether the scope and depth of the technical information was sufficient to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify within the submittal any readily apparent information insufficiencies in the characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications.

The NRC staff has reviewed Duke Energys submittal and concluded that it did provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in Duke Energys submittal, the NRC staff has estimated that this licensing request will take approximately 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> to complete and that the review can be completed within 12 months of acceptance of the LAR (i.e., by October 24, 2024). If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during routine interactions between Duke Energy and the NRC project manager. These estimates are based on the NRC staffs initial review of the LAR submittal, and they could change due to several factors, including requests for additional information and unanticipated addition of scope to the review.

If you have any questions, please contact me at (301) 415-0272 or lucas.haeg@nrc.gov.

Luke Haeg Project Manager NRR/DORL/LPL2-2 U.S. Nuclear Regulatory Commission 301-415-0272

Hearing Identifier:

NRR_DRMA Email Number:

2285 Mail Envelope Properties (DM8PR09MB640755EA1C111CA1C29CAE9A98DFA)

Subject:

Robinson, Unit 2 - Acceptance of License Amendment Request to Adopt TSTF-258-A, Revision 4, for Changes to Technical Specification 5.7, High Radiation Area (EPID L-2023-LLA-0140)

Sent Date:

10/24/2023 2:25:52 PM Received Date:

10/24/2023 2:25:00 PM From:

Luke Haeg Created By:

Lucas.Haeg@nrc.gov Recipients:

"Duc, Joshua Brian" <Joshua.Duc@duke-energy.com>

Tracking Status: None "David Wrona" <David.Wrona@nrc.gov>

Tracking Status: None "Ryan.Treadway@duke-energy.com" <Ryan.Treadway@duke-energy.com>

Tracking Status: None Post Office:

DM8PR09MB6407.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3218 10/24/2023 2:25:00 PM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: