ML23200A231

From kanterella
Jump to navigation Jump to search
Form 3.2-1 Admin JPMs Outline RO & SRO Final
ML23200A231
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/28/2023
From:
NRC/RGN-III
To:
DTE Energy
Bryan Bergeon
Shared Package
ML22007A059 List:
References
Download: ML23200A231 (1)


Text

Form 3.2-1 Administrative Topics Outline Facility: Fermi 2 Date of Examination: June 2023 Examination Level: RO SRO Operating Test Number: 2023-1 Administrative Topic (Step 1)

Activity and Associated K/A (Step 2)

Type Code (Step 3)

Conduct of Operations Determine Stay Time for work in Hot and/or Cold Environments JP-OP-802-4101-231 G2.1.25, Ability to interpret reference materials, such as graphs, curves, and tables (reference potential). IR 3.9.

S/R, N Conduct of Operations Verify Offsite Electrical Lineup JP-OP-802-802-4101-421 G2.1.31 Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup. IR 4.6.

S, D Equipment Control Obtain and Interpret Electrical Drawings JP-OP-802-4101-192 G2.2.41 Ability to obtain and interpret station electrical and mechanical drawings (reference potential). IR 3.5.

S/R, D Radiation Control Notify Hospital of Contaminated, Injured Worker JP-OP-802-4101-435R G2.3.12 Knowledge of radiological safety principles and procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, or alignment of filters. IR 3.2 S/R, D Emergency Plan N/A N/A

Instructions for completing Form 3.2-1, Administrative Topics Outline

1. For each license level, determine the number of administrative job performance measures (JPMs) and topic areas as follows:

Topic Number of JPMs RO*

SRO and RO Retakes Conduct of Operations 1 (or 2) 2 Equipment Control 1 (or 0) 1 Radiation Control 1 (or 0) 1 Emergency Plan 1 (or 0) 1 Total 4

5

2. Enter the associated knowledge and abilities (K/A) statement and summarize the administrative activities for each JPM.
3. For each JPM, specify the type codes for location and source as follows:

Location:

(C)ontrol room, (S)imulator, or Class(R)oom Source and Source Criteria:

(P)revious two NRC exams (no more than one JPM that is randomly selected from last two NRC exams)

(D)irect from bank (no more than three for ROs, no more than four for SROs and RO retakes)

(N)ew or Significantly (M)odified from bank (no fewer than one)

  • Reactor operator (RO) applicants do not need to be evaluated on every topic (i.e., Equipment Control, Radiation Control, or Emergency Plan can be omitted by doubling up on Conduct of Operations), unless the applicant is taking only the administrative topics portion of the operating test (with a waiver or excusal of the other portions).

Form 3.2-1 Administrative Topics Outline Facility: Fermi 2 Date of Examination: June 2023 Examination Level: RO SRO Operating Test Number: 2023-1 Administrative Topic (Step 1)

Activity and Associated K/A (Step 2)

Type Code (Step 3)

Conduct of Operations Determine Fire Brigade Minimum Manning and Compensatory Actions JP-OP-802-4101-232 K/A 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement or overtime limitations (reference potential). IR 3.9 S/R, M Conduct of Operations Perform Plant-Wide Announcement for Imminent Aircraft Threat JP-OP-802-4101-233 K/A 2.1.14 Knowledge of criteria or conditions that require plantwide announcements, such as pump starts, reactor trips, and mode changes. IR 3.1 S, M Equipment Control Determine RCIC Operability and Apply Technical Specifications JP-OP-804-0001-231 K/A 2.2.37 Ability to determine operability or availability of safety related equipment (SRO Only) IR 4.6 S/R, M Radiation Control Notify Hospital of Contaminated, Injured Worker JP-OP-802-4101-435S K/A 2.3.12 Knowledge of radiological safety principles and procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, or alignment of filters. IR 3.7 S/R, D Emergency Plan Event Classification IAW EP-101 (CA2.1)

JP-OP-832-0001-231 K/A 2.4.41 Knowledge of emergency action level thresholds and classifications (SRO Only) IR 4.6 S,M

Instructions for completing Form 3.2-1, Administrative Topics Outline

1. For each license level, determine the number of administrative job performance measures (JPMs) and topic areas as follows:

Topic Number of JPMs RO*

SRO and RO Retakes Conduct of Operations 1 (or 2) 2 Equipment Control 1 (or 0) 1 Radiation Control 1 (or 0) 1 Emergency Plan 1 (or 0) 1 Total 4

5

2. Enter the associated knowledge and abilities (K/A) statement and summarize the administrative activities for each JPM.
3. For each JPM, specify the type codes for location and source as follows:

Location:

(C)ontrol room, (S)imulator, or Class(R)oom Source and Source Criteria:

(P)revious two NRC exams (no more than one JPM that is randomly selected from last two NRC exams)

(D)irect from bank (no more than three for ROs, no more than four for SROs and RO retakes)

(N)ew or Significantly (M)odified from bank (no fewer than one)

  • Reactor operator (RO) applicants do not need to be evaluated on every topic (i.e., Equipment Control, Radiation Control, or Emergency Plan can be omitted by doubling up on Conduct of Operations), unless the applicant is taking only the administrative topics portion of the operating test (with a waiver or excusal of the other portions).