SECY-23-0060: Weekly Information Report Week Ending July 7, 2023ML23193A367 |
Person / Time |
---|
Issue date: |
07/17/2023 |
---|
From: |
NRC/EDO |
---|
To: |
|
---|
References |
---|
Download: ML23193A367 (8) |
|
|
---|
Category:Commission SECY Paper
MONTHYEARSECY-24-0076, Integrated Regulatory Review Service Mission Scoping Results and Recommendation2024-09-12012 September 2024 SECY-24-0076: Integrated Regulatory Review Service Mission Scoping Results and Recommendation SECY-24-0075, Staffs Statement in Support of the Uncontested Hearing for Issuance of Construction Permits for the Kairos Hermes 2 Test Reactor Facility2024-09-0505 September 2024 SECY-24-0075: Staffs Statement in Support of the Uncontested Hearing for Issuance of Construction Permits for the Kairos Hermes 2 Test Reactor Facility SECY-24-0073, Site-Specific Considerations for Review of Requests to Complete Power Reactor Decommissioning Beyond 60 Years from Permanent Cessation of Operations2024-09-0303 September 2024 SECY-24-0073: Site-Specific Considerations for Review of Requests to Complete Power Reactor Decommissioning Beyond 60 Years from Permanent Cessation of Operations SECY-24-0067, Proposed Rule: Reporting Nuclear Medicine Injection Extravasations as Medical Events (Rin 3150-AK91; NRC- 2022-0218)2024-08-14014 August 2024 SECY-24-0067: Proposed Rule: Reporting Nuclear Medicine Injection Extravasations as Medical Events (Rin 3150-AK91; NRC- 2022-0218) SECY-24-0058, Rulemaking Plan on Drug and Alcohol Testing: Technical Issues and Editorial Changes2024-07-0909 July 2024 SECY-24-0058: Rulemaking Plan on Drug and Alcohol Testing: Technical Issues and Editorial Changes SECY-24-0049, Proposed Rule - Reporting Requirements for Nonemergency Events at Nuclear Power Plants2024-06-10010 June 2024 SECY-24-0049: Proposed Rule - Reporting Requirements for Nonemergency Events at Nuclear Power Plants SECY-24-0045, Proposed Rule - Integrated Low-Level Radioactive Waste Disposal (Rin 3150-AI92; NRC-2011-0012)2024-05-29029 May 2024 SECY-24-0045: Proposed Rule - Integrated Low-Level Radioactive Waste Disposal (Rin 3150-AI92; NRC-2011-0012) SECY-24-0035, Enclosure 1 - Summary of Outreach Activities and Education2024-04-25025 April 2024 SECY-24-0035: Enclosure 1 - Summary of Outreach Activities and Education SECY-24-0024, Rulemaking Plan for Freedom of Information Act Regulations, 10 CFR Part 9, Subpart a2024-03-20020 March 2024 SECY-24-0024: Rulemaking Plan for Freedom of Information Act Regulations, 10 CFR Part 9, Subpart a SECY-24-0018, Report to Congress on Abnormal Occurrences: Fiscal Year 20232024-02-23023 February 2024 SECY-24-0018: Report to Congress on Abnormal Occurrences: Fiscal Year 2023 SECY-24-0014, Enclosure 2 - Regulatory Analysis Final Rule- Alternatives to the Use of Credit Ratings2024-02-0909 February 2024 SECY-24-0014: Enclosure 2 - Regulatory Analysis Final Rule- Alternatives to the Use of Credit Ratings SECY-24-0008, Enclosure 1 - Technical, Licensing, and Policy Considerations for Factory-Fabricated Micro-Reactors2024-01-24024 January 2024 SECY-24-0008: Enclosure 1 - Technical, Licensing, and Policy Considerations for Factory-Fabricated Micro-Reactors SECY-24-0006, Denial of Request 11 in PRM 72-6 as Part of Notice Discontinuing Independent Spent Fuel Storage Installation Security Requirements Rulemaking2024-01-22022 January 2024 SECY-24-0006: Denial of Request 11 in PRM 72-6 as Part of Notice Discontinuing Independent Spent Fuel Storage Installation Security Requirements Rulemaking ML23320A1482023-11-16016 November 2023 SECY-94-017: Options with Regard to Revising 10 CFR Part 100, Reactor Site Criteria SECY-23-0092, Annual Update on Activities to Modernize the U.S. Nuclear Regulatory Commissions Digital Instrumentation and Controls Regulatory Infrastructure and License Amendment Requests2023-11-0101 November 2023 SECY-23-0092: Annual Update on Activities to Modernize the U.S. Nuclear Regulatory Commissions Digital Instrumentation and Controls Regulatory Infrastructure and License Amendment Requests SECY-23-0080, Environmental Review Approach for the Kairos Power, LLC Hermes 2 Construction Permit Application2023-09-13013 September 2023 SECY-23-0080: Environmental Review Approach for the Kairos Power, LLC Hermes 2 Construction Permit Application SECY-23-0061, Clarification of the Staff’S Position on Certain American Society of Mechanical Engineers Code Alternatives for More than One 10-Year Inservice Inspection Interval Under Title 10 of the Code of Federal Regulations 50.55a2023-07-24024 July 2023 SECY-23-0061: Clarification of the Staff’S Position on Certain American Society of Mechanical Engineers Code Alternatives for More than One 10-Year Inservice Inspection Interval Under Title 10 of the Code of Federal Regulations 50.55a SECY-23-0060, Weekly Information Report Week Ending July 7, 20232023-07-17017 July 2023 SECY-23-0060: Weekly Information Report Week Ending July 7, 2023 ML22306A1062023-04-10010 April 2023 SECY-23-0033: Interim Enforcement Policy for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Radioactive Material at Power Reactor Facilities SECY-23-0032, Enclosure 1 - Calendar Year 2022 Reactor Oversight Process Program Area Evaluations2023-04-0707 April 2023 SECY-23-0032: Enclosure 1 - Calendar Year 2022 Reactor Oversight Process Program Area Evaluations SECY-23-0008, Agency-Level Objectives and Key Results for Calendar Year 20232023-01-30030 January 2023 SECY-23-0008: Agency-Level Objectives and Key Results for Calendar Year 2023 SECY-22-0101, Enclosure 2 - Status of Taskings Items2022-11-14014 November 2022 SECY-22-0101: Enclosure 2 - Status of Taskings Items SECY-22-0095, Annual Update on Activities to Modernize the U.S. Nuclear Regulatory Commissions Digital Instrumentation and Controls Regulatory Infrastructure and License Amendment Requests2022-10-25025 October 2022 SECY-22-0095: Annual Update on Activities to Modernize the U.S. Nuclear Regulatory Commissions Digital Instrumentation and Controls Regulatory Infrastructure and License Amendment Requests SECY-22-0090, Enclosure 1 - Commission-Approved Emergency Operations Facilities Located More than 25 Miles from Respective Nuclear Power Reactor Site(S)2022-09-22022 September 2022 SECY-22-0090: Enclosure 1 - Commission-Approved Emergency Operations Facilities Located More than 25 Miles from Respective Nuclear Power Reactor Site(S) SECY-22-0087, Recommendation for Problem Identification and Resolution Team Inspection Frequency Paper2022-09-20020 September 2022 SECY-22-0087: Recommendation for Problem Identification and Resolution Team Inspection Frequency Paper SECY-22-0076, Expansion of Current Policy on Potential Common-Cause Failures in Digital Instrumentation and Control Systems2022-08-10010 August 2022 SECY-22-0076: Expansion of Current Policy on Potential Common-Cause Failures in Digital Instrumentation and Control Systems SECY-22-0075, Staff Requirements-SECY-21-0029 Inservice Testing and Inservice Inspection Program Rulemakings Update (NRC-2018-0291/3150-AK23)2022-08-10010 August 2022 SECY-22-0075: Staff Requirements-SECY-21-0029 Inservice Testing and Inservice Inspection Program Rulemakings Update (NRC-2018-0291/3150-AK23) ML22193A2932022-08-10010 August 2022 SECY-22-0076: Enclosure 1 - Relevant Text from the Staff Requirement Memorandum to SECY-93-087, Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light-Water Reactor (Alwr) Designs SECY-22-0065, Evaluation of the U.S. Nuclear Regulatory Commissions General License Program for Devices Containing Radioactive Materials in Response to SRM-SECY-17-00832022-07-0808 July 2022 SECY-22-0065: Evaluation of the U.S. Nuclear Regulatory Commissions General License Program for Devices Containing Radioactive Materials in Response to SRM-SECY-17-0083 SECY-22-0059, Enclosure 1 - Denial of PRM-34-6 - Industrial Radiographic Operations and Training2022-06-17017 June 2022 SECY-22-0059: Enclosure 1 - Denial of PRM-34-6 - Industrial Radiographic Operations and Training SECY-22-0053, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections Periodicity2022-06-0707 June 2022 SECY-22-0053: Recommendations for Modifying the Reactor Oversight Process Engineering Inspections Periodicity SECY-22-0036, Rulemaking Plan for Renewing Nuclear Power Operating Licenses - Future 10-year Regulatory Update Cycle2022-05-0505 May 2022 SECY-22-0036: Rulemaking Plan for Renewing Nuclear Power Operating Licenses - Future 10-year Regulatory Update Cycle SECY-22-0029, Enclosure 1 - Calendar Year 2021 Reactor Oversight Process Program Area Evaluations2022-04-0808 April 2022 SECY-22-0029: Enclosure 1 - Calendar Year 2021 Reactor Oversight Process Program Area Evaluations SECY-22-0027, Enclosure 2 - 2022 Agency-Level Objectives and Key Results2022-04-0101 April 2022 SECY-22-0027: Enclosure 2 - 2022 Agency-Level Objectives and Key Results SECY-22-0014, Enclosure 2 - FY21 Letter to Congress on Abnormal Occurrences.Docx2022-02-24024 February 2022 SECY-22-0014: Enclosure 2 - FY21 Letter to Congress on Abnormal Occurrences.Docx SECY-21-0110, Enclosure 2 - Proposed Rulemaking on Revision of Administrative Requirements - Rulemaking Plan 22021-12-20020 December 2021 SECY-21-0110: Enclosure 2 - Proposed Rulemaking on Revision of Administrative Requirements - Rulemaking Plan 2 SECY-21-0056, SECY-21-0110: Rulemaking Plans to Implement the Results of the Retrospective Review of Administrative Requirements Evaluation2021-12-20020 December 2021 SECY-21-0110: Rulemaking Plans to Implement the Results of the Retrospective Review of Administrative Requirements Evaluation SECY-21-0101, U.S. Nuclear Regulatory Commissions Regulatory Readiness for Oversight of Large Scale Commercial Transportation of Spent Nuclear Fuel2021-12-0202 December 2021 SECY-21-0101: U.S. Nuclear Regulatory Commissions Regulatory Readiness for Oversight of Large Scale Commercial Transportation of Spent Nuclear Fuel SECY-21-0091, Annual Update on Activities to Modernize the U.S. Nuclear Regulatory Commission Digital Instrumentation and Control Regulatory Infrastructure2021-10-25025 October 2021 SECY-21-0091: Annual Update on Activities to Modernize the U.S. Nuclear Regulatory Commission Digital Instrumentation and Control Regulatory Infrastructure SECY-21-0078, Enclosure 1 - Annual Report of the Committee to Review Generic Requirements2021-08-31031 August 2021 SECY-21-0078: Enclosure 1 - Annual Report of the Committee to Review Generic Requirements ML21016A0002021-06-0101 June 2021 Secy 21-0056: Evaluation of Stakeholder Input on Retrospective Review of Administrative Requirements SECY-21-0018, Enclosure 2 - 2021 Agency Objectives and Key Results2021-02-22022 February 2021 SECY-21-0018: Enclosure 2 - 2021 Agency Objectives and Key Results SECY-20-0100, Annual Update on the Integrated Strategy to Modernize the U.S. Nuclear Regulatory Commission'S Digital Instrumentation and Control Regulatory Infrastructure2020-10-23023 October 2020 SECY-20-0100: Annual Update on the Integrated Strategy to Modernize the U.S. Nuclear Regulatory Commission'S Digital Instrumentation and Control Regulatory Infrastructure SECY-20-0093, Enclosure 2 Possible Near-Term Licensing Approaches for Micro-Reactors2020-10-0606 October 2020 SECY-20-0093: Enclosure 2 Possible Near-Term Licensing Approaches for Micro-Reactors SECY-20-0050, Enclosure 3 - Inspection of Regulatory Treatment of Non-safety System Components2020-06-0202 June 2020 SECY-20-0050: Enclosure 3 - Inspection of Regulatory Treatment of Non-safety System Components ML19158A2692019-10-28028 October 2019 SECY-19-0107: U.S. Nuclear Regulatory Commission Memorandum of Understanding with the Defense Nuclear Facility Safety Board SECY-19-0089, Enclosure 2 - Status of Tasking Items2019-09-16016 September 2019 SECY-19-0089: Enclosure 2 - Status of Tasking Items ML19107A4552019-08-16016 August 2019 SECY-19-0079: Staff Approach to Evaluate Accident Source Terms for the Nuscale Power Design Certification Application SECY-19-0079, Staff Approach to Evaluate Accident Source Terms for the Nuscale Power Design Certification Application2019-08-16016 August 2019 SECY-19-0079: Staff Approach to Evaluate Accident Source Terms for the Nuscale Power Design Certification Application ML18347A7192019-08-0909 August 2019 SECY-19-0078: Enclosure 2 Evaluation of Request by Entergy Nuclear Operations, Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station 2024-09-05
[Table view]Some use of "" in your query was not closed by a matching "". Category:Weekly Information Report
MONTHYEARSECY-23-0060, Weekly Information Report Week Ending July 7, 20232023-07-17017 July 2023 SECY-23-0060: Weekly Information Report Week Ending July 7, 2023 SECY-19-0027, Weekly Information Report - Week Ending March 8, 20192019-03-13013 March 2019 SECY-19-0027: Weekly Information Report - Week Ending March 8, 2019 SECY-18-0059, - Weekly Information Report - Week Ending May 18, 20182018-05-24024 May 2018 SECY-18-0059 - Weekly Information Report - Week Ending May 18, 2018 SECY-18-0054, Weekly Information Report - Week Ending April 27, 20182018-05-0101 May 2018 SECY-18-0054: Weekly Information Report - Week Ending April 27, 2018 SECY-18-0043, - Weekly Information Report - Week Ending March 30, 20182018-04-0404 April 2018 SECY-18-0043 - Weekly Information Report - Week Ending March 30, 2018 SECY-18-0040, Weekly Information Report - Week Ending March 16, 20182018-03-22022 March 2018 SECY-18-0040: Weekly Information Report - Week Ending March 16, 2018 SECY-18-0033, Weekly Information Report - Week Ending March 2, 20182018-03-0707 March 2018 SECY-18-0033: Weekly Information Report - Week Ending March 2, 2018 2023-07-17
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
_____________________
INFORMATION REPORT JULY 17, 2023 SECY-23-0060 FOR: The Commissioners FROM: Marissa G. Bailey Assistant for Operations Office of the Executive Director for Operations
SUBJECT:
WEEKLY INFORMATION REPORT - WEEK ENDING JULY 7, 2023 CONTENTS Enclosure Office of the Chief Human Capital Officer A Office of the Chief Information Officer B Office of Nuclear Reactor Regulation C Office of Nuclear Material Safety and Safeguards D Office of Administration E Office of the Secretary F Matthew Meyer for Marissa G. Bailey Assistant for Operations, OEDO CONTACT: John R. Jolicoeur, OEDO 301-415-1642 Meyer, Matthew signing on behalf of Bailey, Marissa on 07/17/23
ML23193A367 OFFICE OEDO OEDO/AO
NAME JJolicoeur MMeyer for MBailey
DATE 7/13/2023 7/17/2023 Office of the Chief Human Capital Officer Items of Interest Week Ending July 7, 2023
ARRIVALS
NONE
RETIREMENTS
NONE
DEPARTURES
NONE
JULY 17, 2023 ENCLOSURE A Office of the Chief Information Officer Items of Interest Week Ending July 7, 2023
Freedom of Information Act (FOIA) and Privacy Act (PA) Requests and Appeals Received During the Period of July03 - July 07, as submitted by requester
Tracking Requesters Requesters Request Description Received Number Name Organization Date FOIA-Doberschuetz, Muller Safe We request Regulatory Guides 07/03/2023 2023-Pawel (RG) 5.69 Rev. 1 and 5.76 Rev. 1.
000158 FOIA-Cloy, Jon - Requester is seeking a list of all 07/05/2023 2023-industrial plants in the USA that 000159 use nuclear sources to measure real time density concentrations.
Users of radioactive sources (not nuclear power plants) must report to the NRC on a regular basis.
FOIA-Lagura, Envirosite Requester is seeking the updated 07/05/2023 2023-Jordan Corporation electronic list and details for sites 000160 in possession/use of radioactive materials regulated by NRC.
Previously requester received these fields: License Number, Date Org Lic., License Date, Expiration Date, Licensee, Licensee Line 2, License Contact Street 1, License Contact Street 2, License Contact Street 3, License Contact, City, State, License Contact Zip, Contact Full Name, Contact Phone, Status, Agency Code. Requester would like this in electronic format.
JULY 17, 2023 ENCLOSURE B Office of Nuclear Reactor Regulation Items of Interest Week Ending July 7, 2023
NRC Finalizes the Accident Tolerant Fuel Roadmap to Readiness Graphic
On June 28, 2023, the U.S. Nuclear Regulatory Commission finalized the Accident Tolerant Fuel (ATF) Roadmap to Readiness graphic (Agencywide Documents Access and Management System Accession No. ML23158A288). The graphic complements the ATF project plan (ML21243A298), providing: a graphical representation of the project timeline; project efficiency and reliability; regulatory certainty of licensing near-term ATF, increased enrichment, and higher burnup technologies; and a visual of critical milestones anticipated to maintain a mid-to-late 2020s batch loading deployment timeline for the entire suite of near-term ATF, increased enrichment, and higher burnup.
JULY 17, 2023 ENCLOSURE C Office of Nuclear Material Safety and Safeguards Items of Interest Week Ending July 7, 2023
List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Cask System; Certificate of Compliance No. 1014, Renewal of Initial Certificate and Amendments 1 through 15; 10 CFR Part 73 [NRC-2022-0109; RIN 3150-AK86]
On July 3, 2023, the U.S. Nuclear Regulatory Commission (NRC) published a notice in the Federal Register (86 FR 42587) announcing the effective date of August 2, 2023, for the direct final rule published on February 13, 2023 (86 FR 9195). The direct final rule renews the initial certificate (Amendment 0) and Amendment Nos. 1 through 15 of the Holtec International 100 Certificate of Compliance 1014 for 40 years.
Rubidium-82 Generators, Emerging Technologies, and Other Medical Use of Byproduct Material: Regulatory Basis and Notice of Public Meeting; 10 CFR Part 35 [NRC-2018-0297; RIN 3150-AK80]
On July 3, 2023, the NRC published a notice in the Federal Register (88 FR 42654) to announce that it is conducting rulemaking to add requirements for calibration and dosage measurement for certain generator systems and establish performance-based requirements for existing and future emerging medical technologies. The rulemaking will affect medical licensees who use these technologies and evaluate the current training and experience requirements for emerging medical technologies. The NRC is requesting comments from the public by October 31, 2023, on the regulatory basis and will hold one or more public meetings during the comment period.
NMSS Staff Issued Exemption to Arizona Public Service Company
On July 5, 2023, staff issued an exemption to Arizona Public Service Company (Agencywide Documents Access and Management System Accession No. ML23166B082). The exemption authorizes the licensee to deviate from the requirements in Certificate of Compliance No. 1031 for the MAGNASTOR storage cask, by using cask lids that were not fabricated in accordance with the requirements of two American Concrete Institute (ACI) codes. This exemption is to support a spent fuel loading campaign scheduled for July at the Palo Verde Generating Station.
The staff determined that the more limited set of requirements proposed in the Technical Specifications for the concrete in the cask lid, in lieu of the requirements of ACI 349 and ACI 318, are suitable to ensure that the lid can adequately perform its required shielding safety function.
NMSS Staff Issued Revision to Certificate of Compliance to TN Americas LLC On July 7, 2023, staff issued to TN Americas LLC, Revision 8 of Certificate of Compliance No.
9358 for the Model TN-LC Package (ML23180A203). This packaging was designed for the exclusive transport of irradiated test, research, and commercial reactor fuels from the Material Test Reactors, Training Research and Isotope General Atomics Reactors, Boiling Water Reactors, and Pressurized Water Reactors (PWR). The amendment request allows the use of top and bottom damaged fuel end caps for shipment of damaged PWR fuel assemblies for post irradiation examination.
JULY 17, 2023 ENCLOSURE D Office of Administration Items of Interest Week Ending July 7, 2023
ANSYS, FLUENT, LS-DYNA Software Services, Licenses, and Support
On July 3, 2023, contract number NNG15SC79B/31310023F0075 was awarded to Integration Technologies Group, Inc. in Falls Church, VA. The purpose of this contract is to procure a renewal of ANSYS software services, licenses, and support. The period of performance is from July 1, 2023, through June 30, 2024, with no option periods. The total potential value of the contract can be up to $591,106.07.
Purchase of Palo Alto Networks Software for Perimeter Security, Threat Prevention, and Analysis/Reporting Capabilities
On June 30, 2023, contract number NNG15SD00B/31310023F0081 was awarded to Blue Tech, Inc. in La Jolla, CA. The purpose of this contract is to acquire Palo Alto Networks software for perimeter security, threat prevention, and analysis/reporting capabilities. The period of performance is from August 18, 2023, through August 29, 2026, with no option periods. The total potential value of the contract can be up to $1,433,016.53.
JULY 17, 2023 ENCLOSURE E Office of the Secretary Items of Interest Week Ending July 7, 2023
Document Released to Public Date of Subject Document
Decision Documents
- 1. None
Information
- 1. SECY-23-0055 06/28/23 Options for Licensing Emerging Technologies Used for Remediation of Mine Waste
- 2. SECY-23-0057 07/06/23 Weekly Information Report Week Ending June 23, 2023 Memoranda
- 1. None
Commission Correspondence
- 1. Letter to the Honorable Kay Granger and Patty Murray, submits the NRC's plan regarding the continued operation of Diablo Canyon Power Plant Units 1 and 2.
- 2. Letter to the Honorable Gary C. Peters, et al., submits the NRC's annual report related to the protection of whistleblowers required by the "National Defense Authorization Act for Fiscal Year 2018."
- 3. Letter to the Honorable James Comer, et al., responds to letter requesting information regarding the NRC's telework and remote work policies and practices.
- 4. Letter to the Honorable Thomas R. Carper, et al., submits the NRC's Report to Congress on the Security Programs for Operating Commercial Nuclear Power Plants and CAT 1 Fuel Cycle Facilities: Results and Status Update Calendar Year 2022.
- 5. Letter to the Honorable Cathy McMorris Rodgers, et al., submits the May 2023 monthly status report on the NRC activities and use of unobligated carryover funds appropriated from the Nuclear Waste Fund.
Federal Register Notices Issued
- 1. Nuclear Regulatory Commission Seeks Qualified Candidates for Appointment to the Advisory Committee on Reactor Safeguards, Request for resumes.
JULY 17, 2023 ENCLOSURE F