1 to Updated Safety Analysis Report, Drawing 4260, Penetration Schedule, Sheet 2B
ML23129A423
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/20/2023
From:
Nebraska Public Power District (NPPD)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23129A261 List: ... further results
References
NLS2023022
Download: ML23129A423 (1)


Text

.....I CONTAINMENT PENETRATION LOCATION LINE TYPE "B" TYPE "C" TESTABLE ISOLATION VALVES CONTAINMENT PENETRATION LOCATION LINE TYPE "B" TYPE "C" TESTABLE ISOLATION VALVES PENETRATION QTY. LINE DESCRIPTION REMARKS TESTABLE PENETR. (INBOARD, OUTBOARD) QTY. LINE DESCRIPTION REMARKS (INBOARD, OUTBOARD)

SIZE ELEVATION AZIMUTH SIZE PENETRATION SIZE ELEVATION AZIMUTH SIZE TESTABLE PENETR.

X-200A 4'-0" I.D. 893'-o" 8' -6" FROM 45' - 1 ACCESS HATCH DOUBLE 0-RING X-212 12" 677'-7 1/2' 5' FROM 112'30' 12* 1 RCIC TURBINE EXHAUST RCIC-37, RCIC-15CV X-200B 4'-0" l.D. 893'-0" 8'-6" FROM 225' - 1 ACCESS HATCH DOUBLE 0-RING X-213A 8" 62'-4 1/2' 67'30' 8" 1 TORUS DRAIN FLANGED (SEE NOTE 2) DOUBLE 0-RING X-201A 5' -11" 885'-10* 22*30* 5'-11 11 1 VENT LINE TYPE "A" TESTED X-201B 5' -11" 885'-10* 6T30' s*-11" 1 VENT LINE TYPE "A" TESTED X-213B 8" 662'-4 1/2' 247'30' 8" 1 TORUS DRAIN FLANGED (SEE NOTE 2) DOUBLE 0-RING X-201C 5' -11" 885'-10" 112*30* 5'-11" 1 VENT LINE TYPE "A" TESTED X-214 24" 77'-7 1/2' 340* 24" 1 HPCI TURBINE EXHAUST (SEE NOTE 5) DOUBLE 0-RING HPCl-44, HPCl-15CV FOR HPCI TURBINE X-2010 5' -11" 885'-10" 157"30' 5'-11" 1 VENT LINE TYPE "A" TESTED APPLICABLE ONLY EXHAUST: RHR-M0167A. RHR-M0166A FOR X-201E 5'-11" 885'-10" 202*30* 5'-11" 1 VENT LINE TYPE "A" TESTED FOR RHR-FLG RHR HX A VENT; RHR-M0167B, RHR-X-201F 5' -11" 885'-10" 247'30' 5'-11" 1 VENT LINE TYPE "A" TESTED -18, 19, M0-166B FOR RHR HX B VENT; HPCI-A070, X-201G 5'-11" 885'-10" 292'30' 5'-11" 1 VENT LINE TYPE "A" TESTED 20RV & 21 RV HPCI-A071 FOR HPCI TURBINE EXHAUST X-201H 5' -11" 885'-10" 337'30' s*-11" 1 VENT LINE TYPE "A" TESTED DRIP LEG DRAIN; RHR-RV-20RV FOR RHR X-202A 18" ~80'-10 1/2 22'30' 18" 1 VACUUM BREAKER TYPE "A" TESTED HX A SHELL SIDE RV DISCHARGE; X-202B 18" 80'-10 1/2 22*30' 18" 1 VACUUM BREAKER TYPE "A" TESTED RHR-RV-21 RV FOR RHR HX B SHELL SIDE X-202C 18" ~80'-10 1/2 6T30' 18" 1 VACUUM BREAKER TYPE "A" TESTED RV DISCHARGE X-2020 18" ~80'-10 1/2 6T30' 18" 1 VACUUM BREAKER TYPE "A" TESTED X-202E 1B" 80'-10 1/2 157"30' 18" 1 VACUUM BREAKER TYPE "A" TESTED X-202F 18" ~80'-10 1/2 157'30' 18" 1 VACUUM BREAKER TYPE "A" TESTED X-215 1* 882'-8" 135' 1" 1 ATMOSPHERIC PRESSURE INSTRUMENTATION (SEE NOTE 5)

X-202G 18" ~80'-10 1/2 202'30' 18" 1 VACUUM BREAKER TYPE "A" TESTED X-216 4* 888'-11" 6' -5" FROM O' 4" 1 SPARE TYPE "A" TESTED X-202H 18" 80'-10 1/2 202'30' 18" 1 VACUUM BREAKER TYPE "A" TESTED X-217 4" 888'-11* 6' -5" FROM O' 4" 1 SPARE TYPE "A" TESTED X-202J 18" ~80'-10 1/2 247'30' 18" 1 VACUUM BREAKER TYPE "A" TESTED X-218 2* 883'-4" 6' -5" FROM 112'30' 2" 1 SPARE TYPE "A" TESTED X-202K 1a* ~80'-10 1/2 247'30' 18" 1 VACUUM BREAKER TYPE "A" TESTED X-219 10" 863'-4" 6'-s" FROM 270' 1o* 1 SPARE TYPE "A" TESTED X-202L 18" ,80'-10 1/2 337'30' 18" 1 VACUUM BREAKER TYPE "A" TESTED X-220 16" 90'-10 1/2' 6'-6" FROM 135' 16" 1 VENT PURGE OUTLET TOP REF. LEG OF PC-3B-2 0-30' TORUS LEVEL DOUBLE 0-RING PC-230MV, PC-245AV FOR PURGE & VENT X-202M 18" 80'-10 1/2 337'30' 18" 1 VACUUM BREAKER TYPE "A" TESTED (SEE NOTE 5) FOR INBOARD EXHAUST; PC-305MV, PC-1308MV FOR X-203A 1. 882'-8" 6' FROM 112'30' 1. 1 HYDROGEN/OXYGEN ANALYZER TYPE "A" TESTED (SEE NOTE 5) IF MODIFIED FLANGE ON PC-230 BYPASS TO PC-230MV X-203B 1. 882'-8" 9' FROM 135' 1. 1 HYDROGEN/OXYGEN ANALYZER TYPE "A" TESTED (SEE NOTE 5) IF MODIFIED X-221 2" B7B'-2 1/2' 9' FROM 112'30' 2" 1 RCIC VACUUM PUMP DISCHARGE (SEE NOTE 2) RCIC-16CV, RCIC-12CV X-205 20" 590'-10 1/2 292'30' 20" 1 VACUUM RELIEF FROM BLDG. VENT PURGE INLET FOR REF. LEG OF PC-3B-1 0-30' TORUS LEVEL DOUBLE 0-RING PC-233MV, PC-237MV FOR PURGE & VENT X-222 2" B78'-2 1/2' 6' FROM 337' 30' 2" 1 HPCI TURBINE DRAIN TO TORUS (SEE NOTE 2) HPCl-50, HPCl-16CV FOR INBOARD PC-243AV, PC-13CV FOR VACUUM RELIEF X-223A 10" B77'-7 1/2' 8' FROM 157'30' 1o* 1 CORE SPRAY PUMP A TEST LINE (SEE NOTE 2) DOUBLE 0-RING CS-M026A FOR CS A TEST LINE; CS-M05A FLANGE ON PC-244AV, PC-14CV FOR VACUUM RELIEF APPLICABLE ONLY FOR CS A MIN. FLOW; CS-RV-11 RV FOR VALVES PC-233, PC-1304MV, PC-1303MV DILUTION SUPPLY FOR CS-FLG-11 RV CS PUMP A RV DISCHARGE 243 & 244 FOR LOOP A FROM SBNI X-223B 10" B77'-7 1/2' 8' FROM 202"30' 1o* 1 CORE SPRAY PUMP B TEST LINE (SEE NOTE 2) DOUBLE 0-RING CS-M026B FOR CS B TEST LINE; CS-M05B X-206A 1. B82'-B" B' FROM 135' 1. 1 LIQUID LEVEL INDICATOR TYPE "A" TESTED (SEE NOTE 5) APPLICABLE ONLY FOR CS B MIN. FLOW; CS-RV-13RV FOR X-206B 1. B70'-7" B' FROM 135' 1* 1 LIQUID LEVEL INDICATOR TYPE "A" TESTED (SEE NOTE 5) FOR CS-FLG-13RV CS PUMP B RV DISCHARGE X-206C 1. 882'-8" 7'-6" FROM 225" 1. 1 LIQUID LEVEL INDICATOR TYPE "A" TESTED (SEE NOTE 5) X-224 6" B64'-2 1/2' 9' -6" FROM 112"30' 6" 1 RCIC PUMP SUCTION (SEE NOTE 2) RCIC-M041 X-2060 1. B70'-7" 7'-6" FROM 225' 1* 1 LIQUID LEVEL INDICATOR TYPE "A" TESTED (SEE NOTE 5) X-225A 20* B64'-2 1/2' 3'-6" FROM 45' 20* 1 RHR SYSTEM PUMP 1-A SUCTION (SEE NOTE 2) DOUBLE 0-RING RHR-M013A; RHR-RV-10RV FOR RHR PUMP X-207A 1. a1a'-o" 22'30' 1. 1 VENT LINE DRAIN LOCATED AT LOW POINT OF EACH VENT LINE APPLICABLE ONLY 1-A RV DISCHARGE X-207B 1. B7B'-0" 6T30' 1" 1 VENT LINE DRAIN LOCATED AT LOW POINT OF EACH VENT LINE FOR RHR-FLG-10RV X-207C 1. a1a'-o" 112'30' 1. 1 VENT LINE DRAIN LOCATED AT LOW POINT OF EACH VENT LINE X-225B 20" B64'-2 1/2' 8'-7 3/4" FROM 45' 20" 1 RHR SYSTEM PUMP 1-C SUCTION (SEE NOTE 2) DOUBLE 0-RING RHR-M013C; RHR-RV-12RV FOR RHR PUMP X-2070 1. a1a'-o" 157'30' 1. 1 VENT LINE DRAIN LOCATED AT LOW POINT OF EACH VENT LINE APPLICABLE ONLY 1-C RV DISCHARGE X-207E 1. B78'-0" 202'30' 1. 1 VENT LINE DRAIN LOCATED AT LOW POINT OF EACH VENT LINE FOR RHR-FLG-12RV X-207F 1. B7B'-0" 247'30' 1* 1 VENT LINE DRAIN LOCATED AT LOW POINT OF EACH VENT LINE X-225C 20* 664'-2 1/2' 8'-7 3/4" FROM 315' 20* 1 RHR SYSTEM PUMP 1-B SUCTION (SEE NOTE 2) DOUBLE 0-RING RHR-M013B; RHR-RV-11RV FOR RHR PUMP X-207G 1. a1a'-o" 292'30' 1. 1 VENT LINE DRAIN LOCATED AT LOW POINT OF EACH VENT LINE APPLICABLE ONLY 1-B RV DISCHARGE X-207H 1. 878'-o" 337'30' 1* 1 VENT LINE DRAIN LOCATED AT LOW POINT OF EACH VENT LINE FOR RHR-FLG-1 lRV X-208A 1o* ~79'-11 1/2 22'30' 10" 1 RELIEF VALVE DISCHARGE FROM MAIN STEAM HEADER X-2250 20* 664'-2 1/2' 3'-6" FROM 315' 20* 1 RHR SYSTEM PUMP 1-0 SUCTION (SEE NOTE 2) DOUBLE 0-RING RHR-M0130; RHR-RV-13RV FOR RHR PUMP X-208B 1O" l79'-11 1/2 22'30' 10" 1 RELIEF VALVE DISCHARGE FROM MAIN STEAM HEADER APPLICABLE ONLY 1-0 RV DISCHARGE X-208C 1o* 79'-11 1/2 157'30' 10* 1 RELIEF VALVE DISCHARGE FROM MAIN STEAM HEADER FOR RHR-FLG-13RV X-206D 1o* 579'-11 1/2 157'30' 10" 1 RELIEF VALVE DISCHARGE FROM MAIN STEAM HEADER X-226 16" 864'-2 1/2' 4' FROM 292'30' 16" 1 HPCI PUMP SUCTION (SEE NOTE 2) HPCI-M05B X-20BE 1o* ~79'-11 1/2 202*30* 10" 1 RELIEF VALVE DISCHARGE FROM MAIN STEAM HEADER X-227A 16" 664'-2 1/2' 8' -9 3/ 4" FROM 135' 16" 1 CORE SPRAY PUMP SUCTION (SEE NOTE 2) DOUBLE 0-RING CS-M07A; CS-RV-10RV FOR CS PUMP A X-20BF 1o* 79'-11 1/2 202'30' 10" 1 RELIEF VALVE DISCHARGE FROM MAIN STEAM HEADER APPLICABLE ONLY SUPPLY RV DISCHARGE X-20BG 1o* ~79'-11 1/2 337'30' 10" 1 RELIEF VALVE DISCHARGE FROM MAIN STEAM HEADER FOR CS-FLG-lORV X-208H 1o* ~79'-11 1/2 337'30' 10" 1 RELIEF VALVE DISCHARGE FROM MAIN STEAM HEADER X-227B 16" B64'-2 1/2' B' -9 3/ 4" FROM 225' 16" 1 CORE SPRAY PUMP SUCTION (SEE NOTE 2) DOUBLE 0-RING CS-M07B; CS-RV-12RV FOR CS PUMP B X-209A 1. ss2'-s" 1. FROM 135' 1" 1 AIR TEMPERATURE DOUBLE 0-RING APPLICABLE ONLY SUPPLY RV DISCHARGE

& TEMP. ELEMENT FOR CS-FLG-12RV

  • +-

X-209B 1. 882'-8" 2* FROM 135' 1. 1 SPARE TYPE "A" TESTED X-228 10" 883'-4" 9' FROM 90' 1a* 1 SPARE TYPE "A" TESTED X-209C 1. B82'-B" 1* FROM 225' 1* 1 AIR TEMPERATURE DOUBLE 0-RING X-229A 1* 77'-7 1/2' 6" FROM 22'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-569, PC-570 FOR PC-AO-NRV21

& TEMP. ELEMENT X-229B 1" 677'-7 1/2' 6" FROM 22'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-571, PC-572 FOR PC-AO-NRV20 X-2090 1. 882'-8" 2' FROM 225' 1* 1 SPARE TYPE "A" TESTED X-229C 1* B77'-7 1/2' 6" FROM 67'30' 1" 1 VACUUM BREAKER ACTIVATING AIR PC-573, PC-574 FOR PC-AO-NRV23 X-210A 1a* 883'-4" 3' FROM 90' 18" 1 RHR LOOP A SYSTEM PUMP TEST LINE DOUBLE 0-RING RCIC-M027, RCIC-13CV FOR RCIC MIN. X-229D 1" B77'-7 1/2' 6" FROM 67'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-575, PC-576 FOR PC-AO-NRV22 APPLICABLE ONLY FLOW (SEE NOTE 2); RHR-M021A FOR X-229E 1* B77'-7 1/2' 6" FROM 157'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-577, PC-578 FOR PC-AO-NRV25 FOR RHR-FLG RHR HX A DRAIN (SEE NOTE 2); X-229F 1" B77'-7 1/2' 6" FROM 157'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-579, PC-580 FOR PC-AO-NRV24

-14RV AND 17RV RHR-M016A FOR RHR PUMP MIN. FLOW X-229G 1" 77'-7 1/2' 6" FROM 202'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-5B1, PC-5B2 FOR PC-AO-NRV27 (SEE NOTE 2) (SEE NOTE 2); RHR-M057, RHR-M067 X-229H 1" B77'-7 1/2' 6" FROM 202'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-583, PC-584 FOR PC-AO-NRV26 FOR DISCHARGE TO RADWASTE (SEE NOTE 3); X-229J 1* 677'-7 1/2' 6" FROM 247'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-585, PC-586 FOR PC-AO-NRV29 X-229K 1. 77'-7 1/2' 6" FROM 247'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-5B7, PC-58B FOR PC-AO-NRV2B X-229L 1* B77'-7 1/2' 337'30' 1* 1 VACUUM BREAKER ACTIVATING AIR PC-589, PC-590 FOR PC-AO-NRV30 &

RHR-RV-14RV FOR RHR LOOP A SUPPLY PC-AO-NRV31 RV DISCHARGE (SEE NOTE 2); RHR-RV-17RV X-229M 1* B77'-7 1/2' 1* FROM 337'30' 1* 1 SPARE TYPE "A" TESTED FOR RHR SHUTDOWN COOLING SUPPLY X-230 12" B85'-7 1/2' 8' FROM 112'30' 12* 1 LOW VOLTAGE POWER TO TORUS ELEC. PENETR.

RV DISCHARGE (SEE NOTE 2) X-300A 1 1/4" 669'-B 1/2' 4'-3" FROM 22'30' 1 1/4" 1 TORUS TEMP. MONITORING X-210B 18" 883'-4" 3' FROM 270' 18" 1 RHR LOOP B SYSTEM PUMP TEST LINE DOUBLE 0-RING RHR-M0-57, RHR-M067 FOR DISCHARGE X-300B 1 1/4" B69'-8 1/2' 5' -3" FROM 22'30' 1 1/4" 1 TORUS TEMP. MONITORING APPLICABLE ONLY TO RADWASTE (SEE NOTE 3); HPCI-M025, X-300C 1 1/4" 669'-8 1/2' 4' -3" FROM 67'30' 1 1/4" 1 TORUS TEMP. MONITORING FOR RHR-FLG-15RV HPCI-17CV FOR HPCI MIN. FLOW (SEE NOTE X-300D 1 1/4" 669'-B 1/2' 5' -3" FROM 67'30' 1 1/4" 1 TORUS TEMP. MONITORING (SEE NOTE 2) 2): RHR-M021 B FOR RHR HX B DRAIN X-300E 1 1/4" B69'-8 1/2' 4'-3" FROM 112'30' 1 1/4" 1 TORUS TEMP. MONITORING (SEE NOTE 2); RHR-M016B FOR RHR X-300F 1 1/4" 669'-B 1/2' 5'-3" FROM 112'30' 1 1/4" 1 TORUS TEMP. MONITORING PUMP MIN. FLOW (SEE NOTE 2); X-300G 1 1/4" B69'-8 1/2' 4'-3" FROM 157'30' 1 1/4" 1 TORUS TEMP. MONITORING X-300H 1 1/4" B69'-8 1/2' 5'-3" FROM 157'30' 1 1/4" 1 TORUS TEMP. MONITORING X-300! 1 1/4" B69'-8 1/2' 4'-3" FROM 202'30' 1 1/4" 1 TORUS TEMP. MONITORING RHR-RV-15RV FOR RHR LOOP B SUPPLY X-300J 1 1/4" B69'-8 1/2' 5'-3" FROM 202'30' 1 1/4" 1 TORUS TEMP. MONITORING RV DISCHARGE (SEE NOTE 2) X-300K 1 1/4" B69'-8 1/2' 4' -3" FROM 247'30' 1 1/4" 1 TORUS TEMP. MONITORING X-300L 1 1/4" 69'-B 1/2' 5'-3" FROM 247'30' 1 1/4" 1 TORUS TEMP. MONITORING X-300M 1 1/4" B69'-8 1/2' 4'-3" FROM 292'30' 1 1/4" 1 TORUS TEMP. MONITORING X-21 lA 6" B89'-11" 90' 6" 1 CONTAINMENT COOLING (SEE NOTE 6) RHR-M038A X-300N 1 1/4" 669'-B 1/2' 5'-3" FROM 292'30' 1 1/4" 1 TORUS TEMP. MONITORING FOR RHR LOOP A SUPPRESSION POOL SPRAY X-3000 1 1/4" 69'-8 1/2' 4'-3" FROM 337'30' 1 1/4" 1 TORUS TEMP. MONITORING X-211 B 6" 889'-11* 270' 6" 1 CONTAINMENT COOLING (SEE NOTE 6) RHR-M038B X-300P 1 1/4" B69'-8 1/2' 5'-3" FROM 337'30' 1 1/4" 1 TORUS TEMP. MONITORING FOR RHR LOOP B SUPPRESSION POOL SPRAY PC-1302MV, PC-1301MV DILUTION SUPPLY FOR LOOP B FROM SBNI GENERAL NOTES:

1 . BOTH ISOLATION VALVES ARE OUTSIDE OF TORUS CONTAINMENT.

2. THESE VALVES AND/OR FLANGES ARE NOT SUBJECT TO TESTING UNDER 1 OCFR50, APPENDIX J TYPE "B" OR "C" REQUIREMENTS DUE TO WATER SEAL.
3. THESE VALVES MUST BE LEAK TESTED. HOWEVER, SINCE THEY ARE DOWNSTREAM OF THE OUTBOARD CONTAINMENT AS BUILT ISOLATION VALVE THE LEAKAGE FROM THESE VALVES NEED NOT BE ADDED TO 0.6 LA REQUIREMENT.

453243228

4. ALL PENETRATION LOCATIONS SHOWN IN THE SCHEDULE ARE APPROXIMATE.
5. INSTRUMENT PORTION IS AN EXTENSION OF CONTAINMENT.
  • THIS DRAWING GENERATED BY NPPD SIGNIFJCANT DRAWN I DATE NUMBER SPB 3/22/96
6. CLOSED LOOP PROVIDES THE SECOND BARRIER.

(/)

z 0 REVISIONS BY N.P.P.D.

GROUP 1 2 J 5 6 CHECKED I DATE

  • BURNS & ROE 0

CX) ui

~ NO. REVISIONS OFT CKD APP DATE CONTAINMENT SUPRESSION CHAMBER JEH APPROVED 1/31/97 I DATE

~

0 N

"' NOO N01 CR96-0160 <DCN97-0098l UCR BINDER 22A !DCN 00-0644)

SPB DLR JEH RGA JRF KG 1-31-9 8-2-00 PEN ET RATION SCHEDULE JRF 1/31/97 0

0 N02 CED 6005621 DCN 01-1504 KG DLR RGA 12 18 01 "J 0 C:

SHEET 28 4260 N03 CED 6029200 DCN 09-0527 KG KG EMN 10 17 09 FILt.tED REVISION NOS C

ci z

N04 CED 6029200 DCN 09-1485 KG KPB DLR 10 23 09 [l N05 EE 10-073 IOCN 11-0098\ KZ KZ DJB 2 9 12

~