Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23110A17610 April 20239 to Updated Final Safety Analysis Report, Appendix E, Figures
ML23173A05810 April 20239 to Updated Final Safety Analysis Report, Chapter 10, Figures - Redacted
ML23173A05210 April 20239 to Updated Final Safety Analysis Report, Appendix J, Figures - Redacted
ML23173A02910 April 20239 to Updated Final Safety Analysis Report, Chapter 8, Figures - Redacted
ML23173A01610 April 20239 to Updated Final Safety Analysis Report, Chapter 5, Figures - Redacted Rev1
ML23172A28110 April 20239 to Updated Final Safety Analysis Report, Appendix C, Figures - RedactedEarthquake
ML23172A26210 April 20239 to Updated Final Safety Analysis Report, Chapter 7, Figures - RedactedScram Discharge Volume
ML23110A26010 April 20239 to Updated Final Safety Analysis Report, Chapter 3, Figures
ML23110A24110 April 20239 to Updated Final Safety Analysis Report, Appendix Q, Figure
ML23110A22110 April 20239 to Updated Final Safety Analysis Report, Chapter 1, Figures
ML23172A28010 April 20239 to Updated Final Safety Analysis Report, Chapter 9, Figures - Redacted
ML21109A0698 April 20218 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2.1 Through 1.6.3
ML21109A1108 April 20218 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.3-1 Through 3.8-5
ML21109A0918 April 20218 to Updated Final Safety Analysis Report, Appendix Q, Figure Q.5.1, Revision 24, Clamps Installed on the Replacement Core Spray Sparger Pipes Structurally Replacing Welds at Each of the Four
ML21109A0598 April 20218 to Updated Final Safety Analysis Report, Chapter 11, Figures 11.2-1 Through 11.8-3
ML21109A0288 April 20218 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.4-1 Through 14.10-14Safe Shutdown
Abnormal operational transient
ML21109A0308 April 20218 to Updated Final Safety Analysis Report, Appendix E, Figures E.1.1 Through E.2.5
ML21109A0408 April 20218 to Updated Final Safety Analysis Report, Appendix D, Figures D.7.1 Through D.10.1
ML21109A0748 April 20218 to Updated Final Safety Analysis Report, Chapter 13, Figures 13.2.1 Through 13.5.2
ML21109A1018 April 20218 to Updated Final Safety Analysis Report, Chapter 6, Figures 6.3.1 Through 6.7.20
ML19114A1418 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Figures
ML19114A1258 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 1.0, Figure 1.2.1 Through Figure 1.6.3
ML19114A1328 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1 Through Figure 3.8.5
ML19114A1578 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Figures
ML19281A0528 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix a, Figures
ML19281A0518 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix M Figures
ML19281A0508 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Figures
ML19281A0498 April 2019Redacted - Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 12, Figures
ML19281A0478 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figures
ML19281A0468 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figures
ML19281A0458 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figures
ML19281A0438 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figures
ML19114A2208 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix Q, Figure - Part 3 of 3
ML19114A1668 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 14, FiguresSafe Shutdown
Abnormal operational transient
ML19114A1638 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Figures
ML19007A3307 January 2019Final Report PBAPS Thermal Study
ML19007A3357 January 2019Map of Conowingo Pond Showing Location of Stations in Trawl Zones 405, 406 and 408 - Figures
ML18354B06620 December 2018Summary of Monitoring Well Installation DetailsGrab sample
Offsite Dose Calculation Manual
Zebra Mussel
FLEX
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Biofouling
ML18275A02328 September 2018License Amendment Request to Reduce High Pressure Service Water System Design Pressure and Revise Technical Specifications 3.6.2.3, 3.6.2.4, 3.6.2.5, and 3.7.1 for Temporary Extension of ...Safe Shutdown
Offsite Dose Calculation Manual
Hydrostatic
Probabilistic Risk Assessment
FLEX
Abnormal operational transient
Annual Radiological Effluent Release Report
Time Critical Operator Action
Earthquake
Fire Protection Program
ML17130A2166 April 2017Revision 26 to Updated Final Safety Analysis Report, Section 2.0 Site Characteristics, Figures, Part 2 of 2Earthquake
ML17233A2826 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 21 to Fire Protection Program, Appendix B, Figures B-1 Through B-31Fire Protection Program
ML17233A2776 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Appendix M, Containment Report, Figures M.1.1 Through M.3.5
ML17130A3216 April 2017Revision 26 to Updated Final Safety Analysis Report, Appendix M, Containment Report, Figures M.1.1 Through M.3.5
ML17130A2336 April 2017Revision 26 to Updated Final Safety Analysis Report, Section 6.0, Core Standby Cooling Systems, Figures, Part 2 of 2
ML17130A3326 April 2017Revision 26 to Updated Final Safety Analysis Report, Appendix Q, License Renewal Aging Management UFSAR Supplement, Figure Q.5.1Aging Management
ML17130A2246 April 2017Revision 26 to Updated Final Safety Analysis Report, Section 4.0, Reactor Coolant System, Figures, Part 2 of 2
ML17233A2526 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Section 7.0, Control and Instrumentation, Figures, Part 2 of 2
ML03101028621 March 2003Drawing, Erosion and Sediment Control Plan of Units 2 and 3 Intake Basin Sediment Removal, Rev 4
ML03101029521 March 2003Drawing, North Substation Option Erosion and Sediment Control Plan of Units 2 and 3 Intake Basin Sedment Removal, Rev 4