ML22298A009

From kanterella
Jump to navigation Jump to search
NEI Example of Us Apwr CCF in Public Meeting October 20, 2022
ML22298A009
Person / Time
Issue date: 10/25/2022
From: Bhagwat Jain
NRC/NRR/DORL/LPL4
To:
References
Download: ML22298A009 (1)


Text

Gen IV Light Water Reactor Example SECY Point 4 Manual IEEE Reqd IEEE Reqd SECY Points 1-3 (D3 Analysis) SECY Point 4 Action Credited in D3 Protection System Function Automatic Function Manual Function Diverse Automatic Function Diverse Manual Function Analysis?

Reactor Trip RPS 1 switch/train DAS (Note 3) 1 switch Yes (Note 4)

Containment Isolation Phase A ESF 2 switches - 1 switch Yes Containment Isolation Phase B ESF Note 1 - - -

Containment Purge Isolation ESF Note 2 - - -

Containment Spray Actuation ESF 2 switches/train - - -

CVCS Isolation ESF 2 switches - - -

Emergency Core Cooling System (ECCS) ESF 1 switch/train DAS 1 switch -

Emergency Feedwater (EFW) Actuation ESF 1 switch/train DAS 1 switch -

Emergency Feedwater (EFW) Isolation ESF 2 switches/train - 1 switch/SG Yes Main Feedwater Isolation ESF 2 switches - - -

Main Steam Line Isolation ESF 2 switches - 1 switch/SG Yes MCR Isolation ESF 1 switch/train - - -

Main Steam Depressurization Valve - - - 1 switch/SG Yes Safety Depressurization Valve - - - 1 switch Yes Note 1: Initiated upon Manual Core Spray actuation Note 2: Initiated upon Manual Core Spray or Manual Containment Isolation Phase A actuation Note 3: Also includes Turbine Trip and Main Feedwater Isolation Note 4: Manual trip required for Steam Generator Tube Rupture. Other scenarios credit DAS automatic signal.

©2022 Nuclear Energy Institute 15