ML22278A871
Text
{{#Wiki_filter:i-=
- c VJ IJ) lI'l I
- .?:
H G F E D c B A 8 8031-M-56 SH. 1 OF 8 TURBINE SPEED Rt_ _di_ _clji ~I~~ L----e 7 I I I I LOW PUMP SUCTION PRESSURE _j r HIGH T=NE EXHAUST PRESS: -- -- M-56 -r--------1 ~ +-- --s REF l REACTOR VESSEL I I HIGH WATER LEVEL '4-- - --'j REF 2 AUTO ISOLATION SIGNAL 7 I I I I I I I I I I I I I I I I I I I L 6 2' HBB-115 'Y ORW 'Y ORW 6 0 li' z oS ~ 5 4 VENT TO HPCI COMPARTMENT ~ C847 t ' I 2 i 3 TURBINE HYDRAULIC CONTROL SYSTEM EGIA OUTPUT ~----~ I ~~RAMP r- -- -- -- -- -- E1557 GENERATOR l OUTPUT t l C201 C201 HS HS IO" EB8-l08 STEAM SUPPLY
- M-55
~ C647 I I I I I ~I ii2 C641 I_ --- - _[PIS]_*_ I~
w L
TURBINE CONTROL LOGIC REFERENCE 2 & REFERENCE 11 CSH,1 0,3) ~* C641 L-~ ~ L BiSl~ ---,-~- ')4* SB0-156 'SUCTION 'Y VENT m DRW L C618 -~ ~ C014 C014 l~i-~--. I' HBB-113 SUCTION VENT 'Y DRW BOOSTER PUMP HPCI PUMP 1 OP204* <NOTE 8> !COOi DRIVE SHAFT DRIVE SHAFT 12'* CBA~ CBA EBB,,EBB,~ SBD, 1' 1*1 1F099 1+06Z ~ I ID. 6 2!i 3J ~ 'Y ORW 'Y ORW C847 ~ f 1004 10'Xl4'
- 14' EBB-129
'Y 'Y ORW ORW 20' HBB-108 C618 ______ _J_ ___, ___ 1,:t --- C647 ~ ~ -L--SREF 2 Cf8,lfflB PSV IF050
- !l I'
~1---~-,--:J DRAIN I~ ~1W wr,IJ}<J-'ft-""1'.;.;HB;;;;B;;..-.;.;10;.;;8-Q-.L..;;.2'.;.;HBB=-.;.;10;.;;8-;~ I-! !_*[ LI& O~OOLER 1: ~ ~* DRAIN l::---fllf---1 1043 'Y DRW 'Y DRW ~ i Jlj* SB0-156 'Y DRW DRAIN 1' HBB-108 CASING DRAIN HPCI TURBINE 10S211
- 1C002 (NOTE 8 & 15)
(.') (,) r------t I I I I H'Scr I I 120 I I ___ l_ ____ I I pp I 2' 120 T I 1 O' 900* ANSI SG FLANGE 0 SEAT & VACUUM TANK C847 Bill ~ w CHEST DRAINS 1' HBB-108 1' HBB-108 1' HBB-108 I __ J C647 [HS'"'"] [ill] I I
- ')4*x 1Y.,-
2 'Y DRW IF048 I 1F052 1F058 LOCKED THROTTLED L
SREF 2 5
C647 ND S ~ -- -- -- _J~ C647 I~ HV-1F026CAS> 1S:;;sAB> ~ I
- 1 NE DC I
s-----:-1 ~_:_-{)~f'--#--...-i;~---;:::j~;;;:~<::~M~-TI1sC::;:;::: I HV-1F025CAS) CSH.34 B,8) I I l + G REF 2 DRW 4 HPCI VACUUM TANK CONDENSATE PUMP 10P215* ')4* SBD-156 'Y DAW TO REACTOR ENCLOSURE EQUIPMENT COMPARTMENT EXHAUST 3 HPCI BAROMETRIC CONDENSER VACUUM PUMP 10P2t6* 2 REF NO. REFERENCE DRAWINGS 1 NUCLEAR BOILER P&ID IA-41 BECHTEL No. HPCI FUNTIONAL CONTROL DIAGRAM 8031-M1-E41-1030-F HPCI PUMP /TURBINE P&ID M-56 GE No. 729E627AD r--r--~~~-~---r--~----~;------i PB.IO LEGEND M-00 CORE SPRAY PUD M-52 RCIC P&ID M-49 AUXILIARY STEAM P&ID M-21 MAIN STEAM P&ID M-01 CONDENSATE P&.ID IA-05 11 TURBINE CONTROLS DIAGRAM 8031-M1-E41-C002-K 12 HPCI SYSTEM P&ID 8031-M1-E41-1010-D 14 HPCI SYSTEM DESIGN SPEC 8031-M1-E41-4010-L 15 ~~~~ENT lNSTALLATION 8031_M_830 VPF 2763-92-1 761E230AD 22A3732 22A3021 NA
- 1.
HPCI IS A SEISMIC CATEGORY I SYSTEIA EXCEPT AS NOTED.
- 2.
AC POWER FOR HPCI INSTRUMENTS SHALL BE DERIVED FROM THE PLANT DC POWER SYSTEM. VIA AN INVERTER. THE DC SOURCE IS TO BE SEPARATE FROM THAT WHICH SUPPLIES THE RCIC SYSTEM.
- 3.
THE GE MPL NUMBER FOR THIS SYSTEM IS E-41,
- 4.
THE BAROMETRIC CONDENSER AND VACUUM TAI<< SHALL BE LOCATED SO THAT ITS WATER LEVEL IS BELOW THE BOTTOM OF THE TURBINE EXHAUST.
- 5.
ALL INSTRUMENT PIPING AND TUBING SHALL BE INSTALLED IN ACCORDANCE WITH REFERENCE 13. FOR DEVIATIONS TD SLOPE CRITERIA SEE REF. 15.
- 6.
ALL STEAM LINES SHALL BE SLOPED WHERE PRACTICAL.
- 7.
NON-Q DRAIN ANO VENT LINES AND CAPPED ENOS EXTENDING FROM SEISMIC CATEGORY I PIPING ARE SEISMIC CATEGORY IIA DOWNSTREAM OF THE LAST ISOLATION VALVE.
- 8.
THIS EQUIPMENT CF.3-5) IS BEING MONITORED BY THE VIBRATION MONITORING SYTEM CVMS). FOR THE TYPE OF SENSORS BEING USED, SEE VMS l/O
SUMMARY
, VP owe 8031-M-247-108.
- 9.
PORTION OF THE HBB-110 SUCTION LINE FROIA THE PUMP TO THE FLANGE MAY BE TESTED AT THE SAME PRESSURE AS GBB-125. CF,6l
- 10.
DELETED. 11 ~~~ ~~l'i:~"f~fi~.A1IW~~ IA~Wrrn1J["~~'r~~s. PROCUREMENT, ERECTION AND TESTING FOR ALL PIPING DOWNSTREAM OF THE LAST ISOLATION VALVE MAY 8E IN ACCORDANCE WITH DESIGN CODE 'D'.
- 12.
DELETED.
- 13.
FOR ALL SEISMIC CATEGORY llA HBB-113 PIPING DOWNSTREAM OF F0-10011 AND PSE-10004: DESIGN, FABRICATION. MATERIAL PROCUREMENT, ERECTION AND TESTING MAY BE IN ACCORDANCE WITH PIPING CLASS DESIGNATION, DESIGN CODE 'D' CH,4).
- 14.
REMOVE VALVE INTERNALS FROM BAROMETRIC CONDENSER VACUUM PUMP DISCHARGE LINE CHECK VALVE !F081 IA,3), PER MOCP-614.
- 15.
PERMANENT REMOVAL OF ONE 'ACTIVE' CARBON RING PER HPCI TURBINE GLAND IS ACCEPTABLE PER LC ECR 05-00126.
- 16.
POINT CONNECTIONS SHOWN ON DRAWING H12-P614-E-008 SHT.1,
- 17.
POINT CONNECTIONS SHOWN ON OllAWING H12-P614-E-002 SHT.1. INCORP. ECR LG 05-00126 R/O PER W/O C0213086. ADDED NOTE 15 ANO A REFERENCE TO IT AT F,3. RE-INCORP. ECR LG 02-00152 RIO PER W/O COl92545. REPLACED PUMP 10-P215, CHANGED DISCHARGE TO 1 ~* AND ADDED REDUCER. CB.3J. DESCRIPTION TABLE OF ADDITIONS & CHANGES USE ONLY PRINTS SHOWING LA TEST DATE MECHANICAL P&ID HPCI PUMP/TURBINE H G F E D c <UNIT 1) t-----L-l-ME-R-IC_K_G_E_NER-AT-IN-G~ST-A-TI_O_N-~---tA EXELON NUCLEAR CORP. SCALE DRAWN !GOS CHECKED INSPECTED APPROVED DATE NONE BECHTEL BECHTEL BECHTEL BECHTEL BECH BECH 01/31'91 APPROVED BECHTEL APPROVED---------! SHEET OF 8031-M-56 42 I CA TE GORY A 1 _J}}