ML22278A685
| ML22278A685 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 09/19/2022 |
| From: | Constellation Energy Generation |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22278A223 | List:
|
| References | |
| Download: ML22278A685 (1) | |
Text
H G
F E
D c
B N
~ A
- c
!D 0
ID
~
8031-M*-60 SH. 2 OF TABLE 1 IDELETEDl 7
.li!ILU.
PENETRATION ASSEllBLIFS PENETRATION INSTRUMENT ELEVATION NO.
TAC NC.
294'-3'
.. 315*
294'-3' N45*
258'-o' 2u;*
265'-0" 55*
2*~* "'410*
263'-0' -...
263'-0'
-270" Z63'-0'
... 90" 265'-0' 228" 268'-6' 31" 301*-o*
.... 345*
295'-6' 226" 304'-6'
... 345*
292'--0' 226" 294'-3' 294'-3'
,..45..
263"-o'
""'270" 263'-0" 294""3' 315*
251'-6' 234*
2&5"-0" 31' 268'-6' 31' 221'-0" 221'--0" 225" 14' SS SEISMIC TUBING NOTE 14 Pl'*
225-1 (TYPICAL OF 24)
Sf£ TABLE 2 SEE NOTE 10
~ ~:~ ~~~~
7 pp 204 6
202
~
TYPICAL ELECTRICAL ~
PEPETRA TION ASSEMBLY SEE TABLE 2 5
SEE: NOTES 4,6 & 23 r--------------
~-r----~~----
I
(;E\
SEE NOTE 2 I
&-~-----0------
L_ ----------T~~EBO~ _ __J SUPPRESSION POOL SEE NOTES 4.6 & 23
~, -
- --- :;-~----;;;------,
4
- "~i 2014 ~NOTE 16)
"'~~
TEST ll".J>D-239 3
SGTS ROOM VENTILATION E>CHAUST SYSTEM I
SEE NOTE 2 l
I 5-t - - - -T;-.,;Q-,;X -- - -
I AIR COMPRESSOR AIR COMPRESSOR AIR COMPRESSOR 1
1 1
L
<SEE NOTES ' & 23~
I I
I
(';\__
I SEE NOTE 2
\...../-.1.-----D------
_____________________________ ]
~
L 6'Jll0-<52
~=t~~
l----tlr.;_...,9--~~--:[:--_;;.2"~JBIJ-<:::.,;;:~:::.,_-<~~~~~D3:~l ~~~~~ft."
I -----r;...----------::r:------=-..::::::..0:::.._.z.J!SHB.* !Io":.:>.21,ll~L it~ftlff L ________________________ 1 6
5 4
3 INTEGRATED I EAKAGf RAIF TEST DATA ACQUISITION SYSTEM ISEE :;!:,:: 23)
I 2069 l-~!ilC
©1
~
SLOWDOWN M!JFFLER j.-..
BLOWODWN TO REACTOR ENClOSURE 2
2
- 2.
TERMINAL BOXES AT LOCAL INSTRUMENTS, PRESSURIZATION SYSTEM LOCATION, AND AT ILRT PANEL LOCATmN,, AHD WIRING CONNECTING THEM WIU BE PERMANENTLY INSTALLED (REF N0.4l.
- 4. THE DATA ACQUISITION SYSTEM,, AIR COMPRESSORS AND COOLING/Fil TER Stc;ID ARE LEASED Ott A TEMPORARY BASIS.
TOTAL AIR CAPACITY SHALL BE 3GOO SCFM. THE COMPRESSOR Att:l COOLINGIFil. T£R SKIDS SHALL BE LOCATED TO MINlt.IIZE THE RUN or PIPING TO THE REACTOR ENCLOSURE WHILE STlt.L.
BEING ACCESSIBLE BY TRUCK.
- 5. THE BLOWDQWN MUFFLER IS STORED IN THE WAREHOUSE AND TENPORARR. Y INSTALLED FDR PERFORMANCE OF INITIAL IlRT FOR BOTH UNITS 1 AND 2.
- 6. THE II.RT DATA ACQUISITION SYSTEM PANa AND THE CONTAINMENT TEMl'ERATURE (TD AND MOISTURE <ME> ELEMENTS Will. BE PORTABLE AND WILL BE LEASED WITH THE DATA AOUISITIDN SYSTEM PANEL. REFERENCE INDIVIDUAL TEST SET-UP FOR INSTRUMENT CONNECTIONS.
- 7. 11£ ILRT DATA AQUISITIDN SYSTEM PANEL CONllECTIDNS ARE LOCATED IN AREA e. EL 332'.
- 9. DURING IL.RT THE SENSORS WR.L. BE PLACED AWAY FROM HEAT SOURCES AND HEAT SIHKS IAT THE DISCRETION OF THE TEST DIRECTOR> WITHIN Af>PROX!MATU Y 20 FEET OF THEIR RESPECTIVE JUNCTION BOXES.
- 10. MOUNT EACH PRESSl.mE GAUGE ASSEMBLY WITH FILL. AND TEST VALVES NEAR THEIR RESPECTIVE ELECTRICAL PENETR*TIDNS WITHIN EASY ACCESS OF THE FLOOR DA PLATFORM. Pl AND ml VALVE SUPPLIED WITH ELECTRICAL PENETRATIONS BY VENDOR. TEST VAL.YE SHAL.L BE AN INSTRUMENT VALVE MARK NO. Jl2-N2 OR J5-N2 PER SPECIFICATION 8031-M-228 SLPPLIED BY FIELD.
1 t. REMOVE HOSE ANO CAP OPEN VENT LINE. Jt4* JDD-23',
ABOVE llRT-DAS WHEN NOT IN USE.
- 14. 14" STAIHl£5S STEEL TUBING PFl(lYIDED FOR l.EAK TESTING ELECTRICAL PENETRATIONS ARE DESIGNED TO ASME: SECTION 111 CLASS 2 CRITEll:JA AHO INSTALLED TO ANSI 831.1 SEISMIC CLASS I CRITERIA
- 15. FDR All NON*SE.ISMIC CATEGORY I CAPPED VENTS, DRAINS AND TEST CONNECTIONS: DESIGN, FABRICATION. MATERIAL PROCUREMENT, ERECTION & TESTING FOR ALL PIPINC DOWNSTREAM OF THE L.AST ISOLATION VALVE,. MAY BE IN ACCORDANCE WITH DESIGN Cl.ASS "D"*
- 19. BLIND SIDE OF SPECTACLE FLANGE MUS-T BE INSTALLED DURJHG NORMAL OPERATIONS. OPEN SIDE TO BE USED DURING JRlT/SIT ONLY. (C-2,C-4,0-7,04,F-4).
- 11. ROOT VALVES ASSOCJATEO WtTtf Pl\ESSURE TAPS ME LOCKED CLOSED.
- 18. DELETE
- 19. PENETRATION St..EEVES. INCLUDING THE SLEEVE TO FLUED HEAD WELD OUTSIDE CONTAINMENT ARE PENNSYLVANIA SPECIAL.
PENETRATING SLEEVES USED WillllJUT FLl.U> HEADS, INCLUDING THE FmST WELD OUTSIDE CONTAINMENT ARE PENNSYLVANIA SPECIAL.
EXCEPT WHERE THE Pe&ETRATION SLEEVE IS PART OF AN ASME CLASS 2 PRESSURE BOUNDARY.
WHEN TI£ PENETRATION SLEEVE IS PART aF AN ASUE CLASS 2 PRESSURE BOUMDAA'f.(J.E.. TI-IE l'ENNS'flVANIA SPECIAL SLEEVE JOINS ASME PIPING INSIDE CONTAINMENT TO ASME PIPING OUTSIDE CONTAINMENT! THE FIRST WELD BOTH lNSIDEIOUTSIDE CONTAINMENT SHALL BE IN ACCORDANCE WITH ASME CLASS 2.
- 20. DESIGN RATING AND SERVICE CONDinONS FOR %'SS TUSING USED IN THE INSTALLATION OF PP-60-20S &. PP-60-207 SHALL BE THE SAME AS APPL.ICABl...£ TD PIP£ UNE !eB-262..
- 21. THESE GLOBE VALVES SHALL BE INSTALLED SUCH THAT THE FLOW FROM THE SlFl'RESSION a-tAMBER GOES UNDER TIE SEAT.
- 22. ASUE BOUNDARIES SHOWN ON THIS DRAWING ARE FOR
~~~8:l:~*:foi::.firiN1:ING SPECIFICATIONS
- 23. EQUIPMANT SHOWN IS TYPICAL FDR IRL T PERFORMANCE.
ACTUAL CONFIGURATION IS DETERMINED BY THE IRL T TEST PROCEDURE ST-HlG0-490-2.
JI INCORP. ECR 13-<>0112 REY. 0. REMOVED All ITEM Nl..IMBERS 11 J
~M0[1ti~~==lb~:Ii:MuE£.IN PLANT.REV'D J INCORP.ECR 00-01813 REY.O.
IO ADDED "LC" DESIGNATlON TO VALVES 2052, ZOl4, & 2129.
t [C,41.
INCOAP. E--tR 99-00411 R[V. O.
9 REVISED NOTE 06. AODED TIE BETWEfN TE & ME-015A, AND BETWEEN TE ll ME.-01EiA. [C,D-5J.
INCORP. ECR LG 94-05194 REV. O.
8 REMOVED LOCKED STATUS FROM VALVES 2052. 207'4, 2096 AND 2129 CC,D-<4J.
01-z <l DESCRIPTION MECHANICAL PS.ID PRIMARY CONTAINMENT LEAK TESTING (UNIT 2)
H F
E D
c 1------Ll-ll-~-l~-GENER--A-T_m_G_S-TA_Tl_O_N ___ ---IA EXELON NUCLEAR CORP, SCALE DRAWN CHECKED INSPECTED APPROVED
- NONE -
BECHiEL-5ECKtEL