Letter Sequence Approval |
---|
|
|
MONTHYEARML22179A1462022-06-15015 June 2022 Tier 1, Revision 10, Updated Through 04/22/2022 Project stage: Request ND-22-0696, ITAAC Closure Notification on Completion of ITAAC 2.3.04.02.i (Index Number 327)2022-09-0101 September 2022 ITAAC Closure Notification on Completion of ITAAC 2.3.04.02.i (Index Number 327) Project stage: Request ND-22-0709, Request for License Amendment and Exemption Electrical Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Optimization (LAR-22-003)2022-09-0202 September 2022 Request for License Amendment and Exemption Electrical Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Optimization (LAR-22-003) Project stage: Request ML22245A0742022-09-0202 September 2022 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.04.02.i (Index No. 327) for Vogtle Unit 4 Combined License (VOG4) Project stage: Request ML22263A0212022-09-20020 September 2022 COL Docs - Vogtle Unit 4 - Acceptance of Requested Licensing Action LAR 22-003 Project stage: Acceptance Review ML22251A3552022-09-21021 September 2022 FRN - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, VEGP 4 Project stage: Other ML22284A1332022-11-22022 November 2022 LAR-22-003 U4 Electrical ITAAC Consolidation Amendment Safety Evaluation Project stage: Approval ML22284A1322022-11-22022 November 2022 Exemption - Vogtle LAR-22-003 U4 Electrical ITAAC Consolidation Amendment Project stage: Approval ML22284A1312022-11-22022 November 2022 LAR-22-003 U4 Electrical ITAAC Consolidation Amendment No. 187 Project stage: Approval ML22284A1252022-11-22022 November 2022 LAR-22-003 U4 Electrical ITAAC Consolidation Amendment Project stage: Request ML22284A1302022-11-22022 November 2022 LAR-22-003 U4 Electrical ITAAC Consolidation Amendment Letter to B. Whitley from B. Gleaves Project stage: Approval 2022-09-01
[Table View] |
|
---|
Category:License-Application for Combined License (COL) (Amend/Renewal) DKT 52
MONTHYEARNL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0128, License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency2024-04-0404 April 2024 License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency NL-23-0742, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications2023-09-20020 September 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications NL-23-0346, License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007)2023-05-25025 May 2023 License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007) NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) ML23088A1382023-05-0404 May 2023 Enclosure 9 - Attachment to License Amendment No. 189 for COL No. NPF-91 ML23088A1372023-05-0404 May 2023 Enclosure 8 - Attachment to License Amendment No. 124 for COL No. NPF-92 ML23088A1362023-05-0404 May 2023 Enclosure 7 - Attachment to License Amendment No. 181 for COL No. NPF-92 ML23088A1352023-05-0404 May 2023 Enclosure 6 - Attachment to License Amendment No. 166 for COL No. NPF-92 ML23088A1342023-05-0404 May 2023 Enclosure 5 - Attachment to License Amendment No. 188 for COL No. NPF-91 ML23045A1802023-05-0404 May 2023 Enclosure 4 - Attachment to License Amendment No. 147 for COL No. NPF-92 ML23045A1792023-05-0404 May 2023 Enclosure 3 - Attachment to License Amendment No. 148 for COL No. NPF-91 ML23045A1782023-05-0404 May 2023 Enclosure 2 - Attachment to License Amendment No. 117 for COL No. NPF-92 ML23045A1772023-05-0404 May 2023 Enclosure 1 - Attachment to License Amendment No. 118 for COL No. NPF-91 NL-23-0135, License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005)2023-04-17017 April 2023 License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005) NL-23-0132, License Amendment Request: Remove Combined License Appendix C (LAR 23-001)2023-04-0404 April 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-001) NL-23-0193, Request for License Amendment: Relocation of TS 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003)2023-03-24024 March 2023 Request for License Amendment: Relocation of TS 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) ML23039A1672023-02-0808 February 2023 Draft LAR to Remove Tier 1 and Tier 2 Star Requirements NL-23-0076, Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004)2023-01-31031 January 2023 Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004) NL-23-0020, Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality2023-01-12012 January 2023 Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality ND-22-0881, License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002)2023-01-0303 January 2023 License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002) ML22332A5372022-11-28028 November 2022 Draft LAR 23-001 for 12-8-22 Public Meeting ML22284A1312022-11-22022 November 2022 LAR-22-003 U4 Electrical ITAAC Consolidation Amendment No. 187 ML22307A0072022-11-0202 November 2022 Draft LAR for TS 3.8.3 Inverters Operating Completion Time Extension ND-22-0709, Request for License Amendment and Exemption Electrical Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Optimization (LAR-22-003)2022-09-0202 September 2022 Request for License Amendment and Exemption Electrical Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Optimization (LAR-22-003) ML22087A0682022-03-31031 March 2022 Draft LAR 22-001, Unit 4 Security ITAAC for 3-31-22 Public Meeting with SNC ND-21-0772, Request for License Amendment and Exemption: Clarification of ITAAC Regarding Invessel Components (LAR-21-001)2021-08-24024 August 2021 Request for License Amendment and Exemption: Clarification of ITAAC Regarding Invessel Components (LAR-21-001) ML21230A0162021-08-19019 August 2021 Invessel As-built ITAAC Draft LAR 21-001 for 210819 Psm ML20196L6762020-08-11011 August 2020 Amendment 183 - Vogtle Electric Generating Plant Unit 3 for LAR 20-002 ML20132A0522020-08-0303 August 2020 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 20-001) ND-20-0725, Plants Units 3 and 4, Revision to License Amendment Request: Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation2020-06-22022 June 2020 Plants Units 3 and 4, Revision to License Amendment Request: Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation ND-20-0668, Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005)2020-06-19019 June 2020 Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005) ND-20-0464, Request for License Amendment: Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation2020-05-0707 May 2020 Request for License Amendment: Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation ND-20-0504, Transmittal of Section 404 Permit Modification Request2020-05-0404 May 2020 Transmittal of Section 404 Permit Modification Request ND-20-0507, Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR-20-004)2020-04-30030 April 2020 Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR-20-004) ND-20-0289, Transmittal of NPDES Permit Renewal Application2020-03-31031 March 2020 Transmittal of NPDES Permit Renewal Application ND-20-0266, Revised Request for License Amendment: Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing Basis (LAR-19-019R1)2020-03-20020 March 2020 Revised Request for License Amendment: Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing Basis (LAR-19-019R1) ND-20-0122, Request for License Amendment: Main Control Room Emergency Habitability System (Ves) Pressure Regulating Valve and Source Range Neutron Flux Doubling Surveillance Changes, and Other Miscellaneous.2020-02-28028 February 2020 Request for License Amendment: Main Control Room Emergency Habitability System (Ves) Pressure Regulating Valve and Source Range Neutron Flux Doubling Surveillance Changes, and Other Miscellaneous. ND-20-0075, Request for License Amendment and Exemption: Unit 3 Auxiliary Building Wall 11 Seismic Gap Requirements (LAR-20-001)2020-02-0707 February 2020 Request for License Amendment and Exemption: Unit 3 Auxiliary Building Wall 11 Seismic Gap Requirements (LAR-20-001) ND-20-0092, Revision to Request for License Amendment: Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test (LAR-19-017R1)2020-01-31031 January 2020 Revision to Request for License Amendment: Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test (LAR-19-017R1) ND-19-1388, Preliminary Amendment Request (Par): Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (PAR-19-014)2019-11-13013 November 2019 Preliminary Amendment Request (Par): Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (PAR-19-014) ND-19-1292, Proposed Changes to the Licensing Basis Documents (LAR-19-018)2019-10-31031 October 2019 Proposed Changes to the Licensing Basis Documents (LAR-19-018) ND-19-1313, Revision to Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR-19-016R1)2019-10-25025 October 2019 Revision to Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR-19-016R1) ND-19-1314, Second Preliminary Amendment Request (Par): Reinforcement Changes for Wall L (PAR-19-016-2)2019-10-25025 October 2019 Second Preliminary Amendment Request (Par): Reinforcement Changes for Wall L (PAR-19-016-2) ML19262F8562019-10-22022 October 2019 License Amendment - Vogtle Electric Generating Plant, Unit 4 (LAR 19-006) ML19262F8552019-10-22022 October 2019 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment 165 (LAR-19-006) ML19262F8572019-10-22022 October 2019 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 163 (LAR-19-006) ND-19-1142, Request for License Amendment and Exemption: Automatic Depressurization System (ADS) and Core Makeup Tank (Cmt) Design Parameters (LAR-19-009)2019-09-30030 September 2019 Request for License Amendment and Exemption: Automatic Depressurization System (ADS) and Core Makeup Tank (Cmt) Design Parameters (LAR-19-009) ML19247C8572019-09-0909 September 2019 Notice of No Objection for Preliminary Amendment Request for LAR-19-016 2024-07-25
[Table view] |
Text
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 DOCKET NO.52-026 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 187 License No. NPF-92
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Southern Nuclear Operating Company (SNC),
dated September 2, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations, and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to Appendix C of the facility Combined License as indicated in the attachment to this license amendment.
Paragraph 2.D(8) of facility Combined License No. NPF-92 is hereby amended to read as follows:
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 187, are hereby incorporated into this license.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION:
Signed by Hall, Victor on 11/22/22 Victor E. Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation Date of Issuance: November 22, 2022 Attachment(s):
Page 7 of the facility Combined License and affected pages of Appendix C of the facility Combined License Enclosure 1